Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Dundonald Road Kilmarnock East Ayrshire KA1 1EQ

Granted East Ayrshire 22/0749/LB Listed Building

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal alterations to rear annex and replacement windows and door

As published by the council, reference 22/0749/LB

Application record

Reference
22/0749/LB
Type
Listed Building
Status
Decided
Decision
Approved
Received
29 Nov 2022
Validated
24 Jan 2023
Decided
21 Mar 2023
Ward
Kilmarnock West And Crosshouse
Parish
Grange/Howard
Decision by
Delegated
Postcode
KA1 1EQ

Site history

Applications at this address on the East Ayrshire register

This site has had 5 applications since 2015: 5 approved, 0 refused.

  • 25/0539/TCA Granted

    3 Dundonald Road Kilmarnock East Ayrshire KA1 1EQ

    Reduction by 2m of 1no. Common Lime (G001), pollarding to old pollar points of 1no. White Willow (01) and felling/removal of 1no. Leyland Cypress (03).

    Decided 11 Dec 2025 Trees
  • 23/0171/TCA Granted

    3 Dundonald Road Kilmarnock East Ayrshire KA1 1EQ

    Prune and reduce back from neighbours garden

    Decided 3 Aug 2023 Trees
  • 22/0225/TCA Granted

    3 Dundonald Road Kilmarnock East Ayrshire KA1 1EQ

    Removal of 11 trees

    Decided 14 Jul 2022 Trees
  • 15/0051/TP Granted

    3 Dundonald Road Kilmarnock East Ayrshire KA1 1EQ

    Proposed tree works

    Decided 27 Feb 2015 Trees

Timeline

Dates from the published record

  1. 29 Nov 2022

    Received by East Ayrshire

  2. 24 Jan 2023

    Validated

    Checked as complete and ready for consideration.

  3. 21 Mar 2023

    Decision issued: Approved

  4. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy

108 applications on PlanIndex · across 52 councils · 88% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Ayrshire granted permission on 21 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Ayrshire

  • 26/0097/LB Granted

    12 Polwarth Street Galston East Ayrshire KA4 8HG

    Proposed external alterations- new window and door, repaint building and associated alterations

    4 Mar 2026 Heritage and listed buildings
  • 26/0341/LB Granted

    12 Main Road Crookedholm East Ayrshire KA3 6JT

    Installation of new stained glass panel to replace an original damaged stained glass panel to the north gable of listed building

    13 Jul 2026 Heritage and listed buildings
  • 26/0316/LB Granted

    48 Main Road Fenwick East Ayrshire KA3 6AL

    Replacement of existing flat roof

    30 Jun 2026 Heritage and listed buildings
  • 26/0432/LB Awaiting decision

    Dalmellington Church Knowehead Dalmellington East Ayrshire KA6 7QW

    Internal re-configuration of balcony and partition/screen wall, widening of stairway, installation of window ventilation opener on the front (West) elevation and cast-iron gated access on side (North) elevation.

    21 Aug 2026 Heritage and listed buildings
  • 26/0247/LB Granted

    14 Portland Road Kilmarnock East Ayrshire KA1 2BS

    Remove and replace roof slates and internal alterations to form open plan office and meeting room

    22 May 2026 Heritage and listed buildings