Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Maunsheugh Road Fenwick Kilmarnock East Ayrshire KA3 6AN

Granted East Ayrshire 18/0278/LB Listed Building

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of bay dormer windows

As published by the council, reference 18/0278/LB

Application record

Reference
18/0278/LB
Type
Listed Building
Status
Decided
Decision
Approved
Received
6 Apr 2018
Validated
30 Apr 2018
Decided
13 Jun 2018
Ward
Annick
Parish
Fenwick
Decision by
Delegated
Postcode
KA3 6AN

Site history

Applications at this address on the East Ayrshire register

This site has had 4 applications since 2018: 4 approved, 0 refused.

  • 22/0001/AMCTP Granted

    2 Maunsheugh Road Fenwick Kilmarnock East Ayrshire KA3 6AN

    Discharge of Condition No.2 (Replacement Tree) of Tree Works Consent No. 22/0500/TP

    Decided 24 Nov 2022 Conditions
  • 22/0500/TP Granted

    2 Maunsheugh Road Fenwick Kilmarnock East Ayrshire KA3 6AN

    Removal of 1 no. tree within property

    Decided 10 Oct 2022 Trees
  • 22/0436/TCA Granted

    2 Maunsheugh Road Fenwick Kilmarnock East Ayrshire KA3 6AN

    Removal of 8 no. trees within property

    Decided 4 Aug 2022 Trees

Timeline

Dates from the published record

  1. 6 Apr 2018

    Received by East Ayrshire

  2. 30 Apr 2018

    Validated

    Checked as complete and ready for consideration.

  3. 13 Jun 2018

    Decision issued: Approved

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Ayrshire granted permission on 13 June 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Ayrshire

  • 26/0097/LB Granted

    12 Polwarth Street Galston East Ayrshire KA4 8HG

    Proposed external alterations- new window and door, repaint building and associated alterations

    4 Mar 2026 Heritage and listed buildings
  • 26/0341/LB Granted

    12 Main Road Crookedholm East Ayrshire KA3 6JT

    Installation of new stained glass panel to replace an original damaged stained glass panel to the north gable of listed building

    13 Jul 2026 Heritage and listed buildings
  • 26/0316/LB Granted

    48 Main Road Fenwick East Ayrshire KA3 6AL

    Replacement of existing flat roof

    30 Jun 2026 Heritage and listed buildings
  • 26/0432/LB Awaiting decision

    Dalmellington Church Knowehead Dalmellington East Ayrshire KA6 7QW

    Internal re-configuration of balcony and partition/screen wall, widening of stairway, installation of window ventilation opener on the front (West) elevation and cast-iron gated access on side (North) elevation.

    21 Aug 2026 Heritage and listed buildings
  • 26/0247/LB Granted

    14 Portland Road Kilmarnock East Ayrshire KA1 2BS

    Remove and replace roof slates and internal alterations to form open plan office and meeting room

    22 May 2026 Heritage and listed buildings