Mauchline Old Parish Church Loudoun Street Mauchline East Ayrshire KA5 5BU

Granted East Ayrshire 09/0716/CA Conservation Area

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed partial downtaking, rebuilding and repointing of existing stone boundary wall and replacement of railings.

As published by the council, reference 09/0716/CA

Application record

Reference
09/0716/CA
Type
Conservation Area
Status
Decided
Decision
Approved
Received
30 Sep 2009
Validated
13 Oct 2009
Decided
17 Dec 2009
Ward
Ballochmyle
Decision by
Delegated
Postcode
KA5 5BU

Site history

Applications at this address on the East Ayrshire register

This site has had 4 applications since 2009: 4 approved, 0 refused.

  • 19/0338/TCA Granted

    Mauchline Old Parish Church Loudoun Street Mauchline East Ayrshire KA5 5BU

    Trees requiring to be repollarded

    Decided 22 May 2019 Trees
  • 14/0904/AD Granted

    Mauchline Old Parish Church Loudoun Street Mauchline East Ayrshire KA5 5BU

    Proposed wall mural

    Decided 20 Mar 2015 Advertising
  • 10/0976/LB Granted

    Mauchline Old Parish Church Loudoun Street Mauchline East Ayrshire KA5 5BU

    Affix plaque to building

    Decided 2 Feb 2011 Heritage and listed buildings

Timeline

Dates from the published record

  1. 30 Sep 2009

    Received by East Ayrshire

  2. 13 Oct 2009

    Validated

    Checked as complete and ready for consideration.

  3. 17 Dec 2009

    Decision issued: Approved

  4. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Ayr

90 applications on PlanIndex · across 11 councils · 96% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Ayrshire granted permission on 17 December 2009, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Ayrshire

  • 26/0097/LB Granted

    12 Polwarth Street Galston East Ayrshire KA4 8HG

    Proposed external alterations- new window and door, repaint building and associated alterations

    4 Mar 2026 Heritage and listed buildings
  • 26/0341/LB Granted

    12 Main Road Crookedholm East Ayrshire KA3 6JT

    Installation of new stained glass panel to replace an original damaged stained glass panel to the north gable of listed building

    13 Jul 2026 Heritage and listed buildings
  • 26/0316/LB Granted

    48 Main Road Fenwick East Ayrshire KA3 6AL

    Replacement of existing flat roof

    30 Jun 2026 Heritage and listed buildings
  • 26/0432/LB Awaiting decision

    Dalmellington Church Knowehead Dalmellington East Ayrshire KA6 7QW

    Internal re-configuration of balcony and partition/screen wall, widening of stairway, installation of window ventilation opener on the front (West) elevation and cast-iron gated access on side (North) elevation.

    21 Aug 2026 Heritage and listed buildings
  • 26/0247/LB Granted

    14 Portland Road Kilmarnock East Ayrshire KA1 2BS

    Remove and replace roof slates and internal alterations to form open plan office and meeting room

    22 May 2026 Heritage and listed buildings