Planning application
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Works: New dwelling
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of Bird Hazard Management Plan to condition 54 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
As published by the council, reference 262661CND
Application record
- Reference
- 262661CND
- Status
- Pending Consideration
- Received
- 3 Jul 2026
- Validated
- 3 Jul 2026
- Ward
- Pitshanger
- Postcode
- W13 0AL
Site history
Applications at this address on the Ealing register
This site has had 4 applications since 2026.
-
263195CND Awaiting decision
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Submission of the Circular Economy Statement pursuant to condition 35 (Revised circular Economy Statement) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space. - Condition 35 Revised Circular Economy statement cover letter - Gurnell Leisure Centre Planning Phasing document revision C - Expedition - Circular Economy statement Addendum for condition 35
-
263194CND Awaiting decision
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Submission of the Whole Life-Cycle Carbon Assessment phase 1 pursuant to condition 34 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
263110NMAR3 Awaiting decision
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Application for a Non-Material Amendment in (S96a) to planning permission 241706OUTR3 dated 21.03.2025 for 'Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space'. Amendment seeks permission for minor changes to Phase 1 of the permitted development (the leisure centre) including amendments to the proposed leisure centre facade and internal layout of the building, landscape amendments and a new external cycle store'. (Regulation 3 Application by London Borough of Ealing)
Timeline
Dates from the published record
-
3 Jul 2026
Received by Ealing
-
2 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ealing took a median of 55 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 241706OUTR3 (Granted with S106 conditions)
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
- APPLICATIONFORMREDACTED
- 253903 GURNELL LEISURE CENTRE BHMP
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Ealing for determination, against a statutory target of eight weeks. Over the last year Ealing's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Ealing's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~23 Oct
Details of a Biodiversity Gain Plan phase 1 pursuant to condition 10 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision New dwelling -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~19 Oct
Submission of the Circular Economy Statement pursuant to condition 35 (Revised circular Economy Statement) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space. - Condition 35 Revised Circular Economy statement cover letter - Gurnell Leisure Centre Planning Phasing document revision C - Expedition - Circular Economy statement Addendum for condition 35
Awaiting decision New dwelling 4 docs -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~19 Oct
Submission of the Whole Life-Cycle Carbon Assessment phase 1 pursuant to condition 34 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision New dwelling 4 docs -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~9 Oct
Application for a Non-Material Amendment in (S96a) to planning permission 241706OUTR3 dated 21.03.2025 for 'Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space'. Amendment seeks permission for minor changes to Phase 1 of the permitted development (the leisure centre) including amendments to the proposed leisure centre facade and internal layout of the building, landscape amendments and a new external cycle store'. (Regulation 3 Application by London Borough of Ealing)
Awaiting decision New dwelling 30 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Full Fibre Connectivity Infrastructure part pursuant to Condition 25 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
Granted -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
94% historically approved · decision due ~28 Aug
Details of Bird Hazard Management Plan to condition 54 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision Conditions New dwelling 2 docs