Planning application

Ealing Hospital Uxbridge Road Southall UB1 3HW

Awaiting decision Ealing 262424FUL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of a 1MW Water Source Heat Pump (WSHP) with associated GRP enclosures, buffer vessels, and thermal stores, including external pipework connecting to the plantroom.

As published by the council, reference 262424FUL

Application record

Reference
262424FUL
Status
Pending Consideration
Received
17 Jun 2026
Validated
17 Jun 2026
Ward
Norwood Green
Postcode
UB1 3HW

Site history

Applications at this address on the Ealing register

This site has had 5 applications since 2026: 4 approved, 0 refused.

  • 261844FUL Granted

    Ealing Hospital Uxbridge Road Southall UB1 3HW

    Installation of 2no Air Source Heat pumps on the roof, associated steel support deck, pipework and electrical containment from the heat pumps along the roof and down the side of the building

    Decided 26 Jun 2026 Full applications
  • 261679FUL Granted

    Ealing Hospital Uxbridge Road Southall UB1 3HW

    Installation of handrails at roof level

    Decided 6 Jul 2026 Full applications
  • 261560PAPV Granted

    Ealing Hospital Uxbridge Road Southall UB1 3HW

    Installation of roof mounted photovoltaic 222 panels (Class J, 56 days Prior Approval Process)

    Decided 25 Jun 2026 Outline
  • 260343PTT Granted

    Ealing Hospital Uxbridge Road Southall UB1 3HW

    TPO/2005/0660 T1 Beech Tree - Fell tree to ground level and replant a young Beech specimen.

    Decided 1 Apr 2026 Trees

Timeline

Dates from the published record

  1. 17 Jun 2026

    Received by Ealing

  2. 25 Jul 2026

    Added to PlanIndex

  3. 8 Aug 2026

    Status changed to Awaiting decision

    Previously Pending Consideration.

  4. 30 Aug 2026

    Status changed to Pending Consideration

    Previously Awaiting decision.

  5. Decision

    Awaiting decision

    Decision expected by 12 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ealing took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Vital Energi Utilities Ltd Agent, registered in Blackburn

Active · incorporated 2000 · Blackburn

21 applications on PlanIndex · across 8 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

  • LAMP POST Site Notice · 24 Jun 2026
  • NEIGHBOUR SITE NOTICE Site Notice · 24 Jun 2026
  • APPLICATIONFORMREDACTED Application Form - Without Personal Data · 17 Jun 2026
  • 50930-VE-SW-00-DR-A-5603 PA1 LOWER LEVEL COMPOUND Drawing · 17 Jun 2026
  • 50930-VE-SW-00-DR-E-5001 PA1 MECHANICAL GRP ELEVATIONS Drawing · 17 Jun 2026
  • 50930-VE-SW-00-DR-E-5002 PA1 ELECTRICAL GRP ELEVATIONS Drawing · 17 Jun 2026
  • 50930-VE-SW-XX-E-A-5602 PA1 WSHP EXISTING ELEVATIONS Drawing · 17 Jun 2026
  • 50930-VE-SW-XX-E-A-5604 PA1 WSHP PROPOSED ELEVATIONS Drawing · 17 Jun 2026
  • ARB SHF3043030-ENZ-XX-XX-DR-AR-001-PL01 TREE SURVEY AND TREE IMPACTS PLAN Tree Survey · 17 Jun 2026
  • EALING HOSPITAL WSHP DATASHEETS Supporting Documentation · 17 Jun 2026
  • PLANT NOISE ASSESSMENT R2 Noise Impact Assessment · 17 Jun 2026
  • 50930-VE-SW-00-DR-A-5001 P1 WSHP LOW LEVEL LOCATION PLAN-A1 Drawing · 17 Jun 2026
  • 50930-VE-SW-00-DR-A-5005 PA1 LOWER LEVEL PROPOSED SITE PLAN Drawing · 17 Jun 2026
  • 50930-VE-SW-00-DR-A-5002 PA1 LOWER LEVEL EXISTING BASEMENT Drawing · 17 Jun 2026
  • 50930-VE-SW-00-DR-A-5003 PA1 LOWER LEVEL PROPOSED BASEMENT PLAN Drawing · 17 Jun 2026
  • 50930-VE-SW-00-DR-A-5004 PA1 LOWER LEVEL EXISTING SITE PLAN Drawing · 17 Jun 2026
  • DESIGN ACCESS REPORT - WATER SOURC Supporting Documentation · 17 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Ealing for determination, against a statutory target of eight weeks. Over the last year Ealing's median decision took 55 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Ealing's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • St Bernards Hospital Uxbridge Road Southall UB1 3HW

    262729CND Submitted 24 Jun 2026 0m away

    86% historically approved · decision due ~19 Aug

    Details of an enhanced sound insulation pursuant to condition 6 of planning permission ref: 214888FUL dated 22.08.2023 'Conversion of the ground floor of The Ballroom building to 4no. residential flats; and provision of associated cycle and refuse storage facilities'

    Awaiting decision New dwelling 3 docs
  • The Ballroom St Bernards Hospital Uxbridge Road Southall UB1 3HW

    262519CND Submitted 24 Jun 2026 0m away

    86% historically approved · decision due ~19 Aug

    Details of noise assessment pursuant to condition 5 of planning permission ref: 214888FUL, dated 22.08.2023 for: 'Conversion of the ground floor of The Ballroom building to 4no. residential flats; and provision of associated cycle and refuse storage facilities'

    Awaiting decision New dwelling 9 docs
  • The Ballroom St Bernards Hospital Uxbridge Road Southall UB1 3HW

    262730CND Submitted 24 Jun 2026 0m away

    86% historically approved · decision due ~19 Aug

    Details of the restored windows and doors pursuant to condition 8 of planning permission ref: 214888FUL dated 22.08.2023 'Conversion of the ground floor of The Ballroom building to 4no. residential flats; and provision of associated cycle and refuse storage facilities'

    Awaiting decision New dwelling Windows or glazing 8 docs
  • Ealing Hospital Uxbridge Road Southall UB1 3HW

    261560PAPV Submitted 13 Apr 2026 1m away

    Installation of roof mounted photovoltaic 222 panels (Class J, 56 days Prior Approval Process)

    Granted Outline 16 docs
  • Ealing Hospital Uxbridge Road Southall UB1 3HW

    262424FUL Submitted 17 Jun 2026 1m away

    75% historically approved · decision due ~12 Aug

    Installation of a 1MW Water Source Heat Pump (WSHP) with associated GRP enclosures, buffer vessels, and thermal stores, including external pipework connecting to the plantroom.

    Awaiting decision Full applications 17 docs
  • Ealing Hospital Uxbridge Road Southall UB1 3HW

    261679FUL Submitted 21 Apr 2026 1m away

    Installation of handrails at roof level

    Granted Full applications 10 docs