Planning application
31 Hart Grove Ealing W5 3NA
Works: Extension Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Alterations to roof from hip to gable end on both side roofslopes; raising of the main roof ridge; rear roof extension incorporating a rear dormer (facilitating the conversion of the roofspace into habitable use); installation of three rooflights to the front roofslope; installation of a window within the side gable wall; provision of a new staircase to the loft level; and associated internal and external alterations
As published by the council, reference 262266HH
Application record
- Reference
- 262266HH
- Status
- Pending Consideration
- Received
- 4 Jun 2026
- Validated
- 4 Jun 2026
- Ward
- Ealing Common
- Postcode
- W5 3NA
Timeline
Dates from the published record
-
4 Jun 2026
Received by Ealing
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ealing took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
SURVEY DESIGN (HARROW) LTD Agent, a design practice registered in Middlesex
Active · incorporated 2005 · Middlesex
76 applications on PlanIndex · across 17 councils · 84% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
- REVISED PLANS
- NEIGHBOUR SITE NOTICE
- APPLICATION FORM REDACTED
- DESIGN AND ACCESS STATEMENT
- LOCATION PLAN
- FIRE STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Ealing for determination, against a statutory target of eight weeks. Over the last year Ealing's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Ealing's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
31 Hart Grove Ealing W5 3NA
87% historically approved · decision due ~30 Jul
Alterations to roof from hip to gable end on both side roofslopes; raising of the main roof ridge; rear roof extension incorporating a rear dormer (facilitating the conversion of the roofspace into habitable use); installation of three rooflights to the front roofslope; installation of a window within the side gable wall; provision of a new staircase to the loft level; and associated internal and external alterations
Awaiting decision Householder Extension Loft or dormer +1 6 docsDomestic -
9 Hart Grove Ealing W5 3NA
Alteration of roof from hip to gable end; rear roof extensions incorporating two Juliet balconies; and installation of three rooflights to front roofslope (following removal of existing rear roof extension and chimney stack) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Extension Loft or dormer 6 docs -
9 Hart Grove Ealing W5 3NA
Single storey rear/side extension; alteration to rear fenestration, incorporating a first floor terrace (Following demolition of the rear extension and detached garage)
Granted Householder Extension Demolition +1 8 docsSmall domestic -
9 Hart Grove Ealing W5 3NA
Two storey side extension and part single storey side/rear extension; formation of first floor rear terrace with glazed balustrade; alteration of roof from hip to gable end; 2 rear roof extension incorporating two Juliet balconies; and installation of three rooflights to front roofslope (following demolition of existing rear extension, detached garage and rear roof extension)
Granted Householder Extension Loft or dormer +2 8 docsSmall domestic -
9 Hart Grove Ealing W5 3NA
Alteration of roof from hip to gable end; rear roof extensions incorporating two Juliet balconies; and installation of three rooflights to front roofslope (following removal of existing rear roof extension and chimney stack) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Extension Loft or dormer 6 docs -
9 Hart Grove Ealing W5 3NA
Two storey side extension and part single storey side/rear extension; formation of first floor rear terrace with glazed balustrade; alteration of roof from hip to gable end; 2 rear roof extension incorporating two Juliet balconies; and installation of three rooflights to front roofslope (following demolition of existing rear extension, detached garage and rear roof extension)
Granted Householder Extension Loft or dormer +2 8 docsSmall domestic