Planning application
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of Full Fibre Connectivity Infrastructure part pursuant to Condition 25 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
As published by the council, reference 262136CND
Application record
- Reference
- 262136CND
- Status
- Approved
- Decision
- Approved
- Received
- 27 May 2026
- Validated
- 27 May 2026
- Decided
- 21 Aug 2026
- Postcode
- W13 0AL
Site history
Applications at this address on the Ealing register
This site has had 11 applications since 2026: 5 approved, 0 refused.
-
263249CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of a Biodiversity Gain Plan phase 1 pursuant to condition 10 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
262143CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Construction Management Plan part pursuant to Condition 19 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
-
261857CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of external artificial lighting pursuant to partially discharge condition 52 of planning permission ref: 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261855CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Air Quality and Dust Management Plan (AQDMP) pursuant to condition 28 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261854CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of air ventilation system (Ventilation Strategy Report) (part discharge - Phase 1) pursuant to condition 27 of planning permission 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
-
261856CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Submission of plant/ machinery/ equipment/ducting/air in- and outlets/ mechanical installations and their external rating noise level (LAr,Tr), together with mitigation measures as appropriate. The measures shall ensure that the emitted external rating noise level will be lower than the lowest existing background sound level LA90 by 10dBA at the most noise sensitive receiver locations at the development site and at surrounding premises in pursuant to condition 46 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261853CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261858CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of piling method statement pursuant to condition 55 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
-
261518CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of the Ground Remediation part pursuant to condition 43 (part discharge - Phase 1) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.(Regulation 3 Application by London Borough of Ealing)
-
261526CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Detailed Drainage Designs part pursuant to condition 56 (part discharge - Phase 1) of planning permission ref: 241706OUTR3, dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary). The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space. (Regulation 3 Application by London Borough of Ealing)
Timeline
Dates from the published record
-
27 May 2026
Received by Ealing
-
25 Jul 2026
Added to PlanIndex
-
21 Aug 2026
Decision issued: Approved
-
23 Aug 2026
Status changed to Approved
Previously Pending Consideration.
What this grant of permission means
Ealing granted permission on 21 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Ealing's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~23 Oct
Details of a Biodiversity Gain Plan phase 1 pursuant to condition 10 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision New dwelling -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~19 Oct
Submission of the Circular Economy Statement pursuant to condition 35 (Revised circular Economy Statement) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space. - Condition 35 Revised Circular Economy statement cover letter - Gurnell Leisure Centre Planning Phasing document revision C - Expedition - Circular Economy statement Addendum for condition 35
Awaiting decision New dwelling 4 docs -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~19 Oct
Submission of the Whole Life-Cycle Carbon Assessment phase 1 pursuant to condition 34 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision New dwelling 4 docs -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~28 Aug
Details of Bird Hazard Management Plan to condition 54 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision New dwelling 2 docs -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
86% historically approved · decision due ~9 Oct
Application for a Non-Material Amendment in (S96a) to planning permission 241706OUTR3 dated 21.03.2025 for 'Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space'. Amendment seeks permission for minor changes to Phase 1 of the permitted development (the leisure centre) including amendments to the proposed leisure centre facade and internal layout of the building, landscape amendments and a new external cycle store'. (Regulation 3 Application by London Borough of Ealing)
Awaiting decision New dwelling 30 docs -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
94% historically approved · decision due ~28 Aug
Details of Bird Hazard Management Plan to condition 54 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision Conditions New dwelling 2 docs