Planning application
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Works: New dwelling
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
As published by the council, reference 261853CND
Application record
- Reference
- 261853CND
- Type
- Discharge Condition Reg 3
- Status
- Approved
- Decision
- Approved
- Received
- 5 May 2026
- Validated
- 5 May 2026
- Decided
- 21 Aug 2026
- Ward
- Pitshanger
- Decision by
- Delegated Decision
- Postcode
- W13 0AL
Site history
Applications at this address on the Ealing register
This site has had 11 applications since 2026: 5 approved, 0 refused.
-
263249CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of a Biodiversity Gain Plan phase 1 pursuant to condition 10 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
262136CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Full Fibre Connectivity Infrastructure part pursuant to Condition 25 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
-
262143CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Construction Management Plan part pursuant to Condition 19 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
-
261857CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of external artificial lighting pursuant to partially discharge condition 52 of planning permission ref: 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261855CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Air Quality and Dust Management Plan (AQDMP) pursuant to condition 28 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261854CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of air ventilation system (Ventilation Strategy Report) (part discharge - Phase 1) pursuant to condition 27 of planning permission 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
-
261856CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Submission of plant/ machinery/ equipment/ducting/air in- and outlets/ mechanical installations and their external rating noise level (LAr,Tr), together with mitigation measures as appropriate. The measures shall ensure that the emitted external rating noise level will be lower than the lowest existing background sound level LA90 by 10dBA at the most noise sensitive receiver locations at the development site and at surrounding premises in pursuant to condition 46 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261858CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of piling method statement pursuant to condition 55 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
-
261518CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of the Ground Remediation part pursuant to condition 43 (part discharge - Phase 1) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.(Regulation 3 Application by London Borough of Ealing)
-
261526CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Detailed Drainage Designs part pursuant to condition 56 (part discharge - Phase 1) of planning permission ref: 241706OUTR3, dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary). The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space. (Regulation 3 Application by London Borough of Ealing)
Timeline
Dates from the published record
-
5 May 2026
Received by Ealing
-
25 Jul 2026
Added to PlanIndex
-
21 Aug 2026
Decision issued: Approved
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Ealing granted permission on 21 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
94% historically approved · decision due ~28 Aug
Details of Bird Hazard Management Plan to condition 54 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision Conditions New dwelling 2 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
94% historically approved · decision due ~22 Jul
Details of Construction Management Plan part pursuant to Condition 19 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
Awaiting decision Conditions 7 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
94% historically approved · decision due ~30 Jun
Submission of plant/ machinery/ equipment/ducting/air in- and outlets/ mechanical installations and their external rating noise level (LAr,Tr), together with mitigation measures as appropriate. The measures shall ensure that the emitted external rating noise level will be lower than the lowest existing background sound level LA90 by 10dBA at the most noise sensitive receiver locations at the development site and at surrounding premises in pursuant to condition 46 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision Conditions New dwelling 3 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of air ventilation system (Ventilation Strategy Report) (part discharge - Phase 1) pursuant to condition 27 of planning permission 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
Granted Conditions New dwelling 9 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
94% historically approved · decision due ~30 Jun
Details of external artificial lighting pursuant to partially discharge condition 52 of planning permission ref: 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Awaiting decision Conditions New dwelling 4 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Granted Conditions New dwelling 5 docs
Other condition discharge and variation applications
In Ealing
-
260883CND Granted
Weaver Rose House High Street Southall UB1 3DN
Details of a Piling Method Statement pursuant to Condition 20 of planning permission ref: 232967FUL dated 31.01.2024 for: Construction of a six storey building with part basement level, comprising 24 self contained flats with associated cycle and bin storage as well as soft and hard landscaping (Following Demolition of the existing buildings)
-
261416CND Granted
131 - 139 Broadway West Ealing W13 9BE
Details of Piling Method Statement pursuant to condition 30 of planning permission ref: 251293VAR dated 23/02/2026 for: Minor material amendment (S.73) to vary condition no.2 (approved plans), seeking to allow changes on the ground floor, unit numbers and co-living amenity space and design changes, in pursuant to planning permission reference 235015FUL dated 28/03/2025 for: Construction of a building stepped from 4 to 9 storeys comprising co-living units (Sui Generis) and associated communal amenity facilities and ground floor commercial space (Use Classes E(a), E(b) and F2(b); and associated refuse storage and cycle parking (following demolition of the existing buildings and structures)
-
261179OPDCND Granted
The Portal Land At Wales Farm Road & Portal Way Acton W3 6EJ
Submission of samples of all materials to be used in the hard landscaping and boundary treatments pursuant to condition 9 of planning permission ref: 165514OPDFUL dated 20.10.2023.
-
260175OPDCND Granted
The Portal Land At Wales Farm Road & Portal Way Acton W3 6EJ
Details of Tree Planting pursuant to condition 20 of planning permission ref: 165514OPDFUL dated 20.10.2023.
-
260474CND Granted
Smiths Farm Kensington Road Northolt UB5 6AH
Details of a refuse management plan pursuant to condition 49 of planning permission Ref: 231604FUL dated 31.05.2024 'Construction of 7 residential buildings (4-7 storeys in height) to provide 220 residential units; conversion of existing farmhouse and barns to provide a cafe/commercial unit (Class E); and improved public access between Northala Fields and Marnham Fields with associated enhanced landscaping, parking and refuse storage'