Skip to content
PlanIndex Get alerts
Menu

Planning application

38 High Street Ealing W5 5DB

Awaiting decision Ealing 261497FUL

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of 5 storey building to provide a ground floor commercial unit (Use Class E) and aparthotel rooms on the upper floors (Use Class C1) (following demolition of existing building)

As published by the council, reference 261497FUL

Application record

Reference
261497FUL
Status
Awaiting Legal Agreement
Received
8 Apr 2026
Validated
8 Apr 2026
Ward
Ealing Broadway
Postcode
W5 5DB

Timeline

Dates from the published record

  1. 8 Apr 2026

    Received by Ealing

  2. 25 Jul 2026

    Added to PlanIndex

  3. 11 Aug 2026

    Status changed to Awaiting decision

    Previously Pending Consideration.

  4. 14 Oct 2026

    Status changed to Awaiting Legal Agreement

    Previously Awaiting decision.

  5. Decision

    Awaiting decision

    Decision expected by 3 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ealing took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

38 documents on file for this application

  • FOOTPATH RESPONSE Supporting Documentation · 01 Jun 2026
  • LAMP POST Site Notice · 20 Apr 2026
  • CONSERVATION SITE NOTICE Site Notice · 20 Apr 2026
  • APPLICATIONFORMREDACTED Application Form - Without Personal Data · 08 Apr 2026
  • 2026_02_12 SANDRINGHAM MEWS HS Heritage Statement · 08 Apr 2026
  • 00697_38 HIGH STREET_FIRE STRATEGY SUMMARY_REV.02_260304 Transport Assessment · 08 Apr 2026
  • 38 HS - OUTLINE APART HOTEL MANAGEMENT PLAN Supporting Documentation · 08 Apr 2026
  • DAYLIGHT AND SUNLIGHT REPORT Daylight Assessment · 08 Apr 2026
  • ENERGY AND SUSTAINABILITY STATEMENT Supporting Documentation · 08 Apr 2026
  • A4157-HAB-ZZ-ZZ-DR-A-0150-PS02 Draw - Location Plan · 08 Apr 2026
  • PROP ELEVATIONS Drawing · 08 Apr 2026
  • PROP EAST ELEVATIONS Drawing · 08 Apr 2026
  • PROP ELEVATION Drawing · 08 Apr 2026
  • PROP ELEVATIONS Drawing · 08 Apr 2026
  • PROP ELEVATIONS Drawing · 08 Apr 2026
  • EXT GRD FLR PLAN Drawing · 08 Apr 2026
  • EXT SOUTH ELEVATION Draw - Prop Floor Plan · 08 Apr 2026
  • EXT FF PLANS Drawing · 08 Apr 2026
  • PROP FIRST FLR PLANS Drawing · 08 Apr 2026
  • EXT SECOND FLR PLANS Drawing · 08 Apr 2026
  • PROP SECOND FLR PLAN Drawing · 08 Apr 2026
  • A4157-HAB-ZZ-03-DR-A-0253-PS02 Draw - Prop Floor Plan · 08 Apr 2026
  • A4157-HAB-ZZ-04-DR-A-0254-PS02 Draw - Prop Floor Plan · 08 Apr 2026
  • A4157-HAB-ZZ-RF-DR-A-0255-PS02 Draw - Prop Roof Plan · 08 Apr 2026
  • A4157-HAB-ZZ-ZZ-DR-A-0151-PS02 Draw - Exist Site/Block Plan · 08 Apr 2026
  • A4157-HAB-ZZ-ZZ-DR-A-0155-PS02 Draw - Exist Roof Plan · 08 Apr 2026
  • EXT ELEVATIONS Drawing · 08 Apr 2026
  • EXT ELEVATION Drawing · 08 Apr 2026
  • EXT ELEVATIONS Drawing · 08 Apr 2026
  • EXISTING SIDE ELEVATION Drawing · 08 Apr 2026
  • EXT ELEVATIONS Drawing · 08 Apr 2026
  • A4157-HAB-ZZ-ZZ-DR-A-0165-PS02 Draw - Exist Section · 08 Apr 2026
  • A4157-HAB-ZZ-ZZ-DR-A-0166-PS02 Draw - Prop Section · 08 Apr 2026
  • A4157-HAB-ZZ-ZZ-DR-A-0249-PS02 Draw - Exist Site/Block Plan · 08 Apr 2026
  • PROP SECTION Drawing · 08 Apr 2026
  • A4157-HAB-ZZ-ZZ-DR-A-0351-PS02 Draw - Prop Section · 08 Apr 2026
  • 38 HIGH STREET PLANNING STATEMENT 06.03.26 Planning Statement · 08 Apr 2026
  • A4157 38 HIGH STREET - DAS Design and Access Statement · 08 Apr 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Ealing for determination, against a statutory target of eight weeks. Over the last year Ealing's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Ealing's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • 14 High Street Ealing London W5 5EB

    215096CND Submitted 4 Aug 2021 50 yards away

    Submission of a noise assessment pursuant to Condition 5 of planning permission ref: 201905FUL dated 30.07.2020 for: 'Change of use from Bank (Use Class A2) to Restaurants and cafes (Use Class A3) and/or Drinking establishments (Use Class A4), including external alterations to the existing shopfront'

    Granted Conditions Windows or glazing 5 docs
  • 14 High Street Ealing London W5 5EB

    215131CND Submitted 4 Aug 2021 50 yards away

    Details of external noise level and mitigation measures part pursuant to Condition 6 of planning permission ref: 201905FUL dated 30.07.2020 for: 'Change of use from Bank (Use Class A2) to Restaurants and cafes (Use Class A3) and/or Drinking establishments (Use Class A4), including external alterations to the existing shopfront'

    Granted Conditions Windows or glazing 5 docs
  • 14 High Street Ealing London W5 5EB

    215096CND Submitted 4 Aug 2021 50 yards away

    Submission of a noise assessment pursuant to Condition 5 of planning permission ref: 201905FUL dated 30.07.2020 for: 'Change of use from Bank (Use Class A2) to Restaurants and cafes (Use Class A3) and/or Drinking establishments (Use Class A4), including external alterations to the existing shopfront'

    Granted Conditions Windows or glazing 5 docs
  • 14 High Street Ealing London W5 5EB

    215131CND Submitted 4 Aug 2021 50 yards away

    Details of external noise level and mitigation measures part pursuant to Condition 6 of planning permission ref: 201905FUL dated 30.07.2020 for: 'Change of use from Bank (Use Class A2) to Restaurants and cafes (Use Class A3) and/or Drinking establishments (Use Class A4), including external alterations to the existing shopfront'

    Granted Conditions Windows or glazing 5 docs
  • 38 High Street Ealing W5 5DB

    261497FUL Submitted 8 Apr 2026 50 yards away

    75% historically approved · decision due ~3 Jun

    Construction of 5 storey building to provide a ground floor commercial unit (Use Class E) and aparthotel rooms on the upper floors (Use Class C1) (following demolition of existing building)

    Awaiting decision Full applications Demolition 38 docs
  • 1 High Street Ealing W5 5DB London

    P/2008/2224 Submitted 22 May 2008 50 yards away

    Erection and display of internally illuminated lettering and logos on fascia signs and return, plasma screen above entrance and non-illuminated images across retractable doors.

    Granted Advertising