Planning application
Park View Place Greenford Road Greenford UB6 0FF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of residential-led mixed use and phased development comprising residential units (Use Class C3) and co-living accommodation (Sui Generis) across 7 blocks with community space (Use Class F2), flexible commercial space (Use Class E) including convenience retail store, infrastructure to facilitate future pedestrian bridge connection to Grove Farm Park and ancillary car and cycle parking, landscaping, green infrastructure and private/communal amenity spaces.
As published by the council, reference 261463FUL
Application record
- Reference
- 261463FUL
- Type
- Full Application
- Status
- Pending Consideration
- Received
- 7 Apr 2026
- Validated
- 7 Apr 2026
- Ward
- North Greenford
- Postcode
- UB6 0FF
Timeline
Dates from the published record
-
7 Apr 2026
Received by Ealing
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ealing took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
269 documents on file for this application
- ES-HTVIA
- RESIDENT OBJECTION
- WASTE MANAGEMENT PLAN
- PRE-DEMOLITION SITE AUDIT
- CIRCULAR ECONOMY STATEMENT
- SITE WASTE MANAGEMENT PLAN
- FRIENDS OF GROVE FARM LETTER
- OBJECTION BY FRIENDS OF GROVE PARK
- OBJECTION BY D SCOTT
- OBJECTION BY E SUTANTO
- FIRE STATEMENT
- FIRE STATEMENT APPENDIX
- 261463FUL SM.PDF
- 261463FUL SM.PDF
- MAJOR SITE NOTICE
- FIRE STATEMENT
- APPLICATIONFORMREDACTED
- DRAWINGS
- DRAWINGS
- DRAWINGS
- EXISTING SECTIONS
- DRAWINGS
- EXISTING SECTIONS 4 AND 5
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- LOCATION PLAN
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- ROOF PLAN
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- ROOF PLAN
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- ROOF PLAN
- DRAWINGS
- DRAWINGS
- DRAWINGS
- ROOF PLAN
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- ROOF PLAN
- DRAWINGS
- BUILDING A LONG SECTION EXISTING AND PROPOSED
- BUILDING B LONG AND SHORT SECTIONS
- BUILDINC C LONG AND SHORT SECTION
- BUILDING D LONG AND SHORT SECTION
- BUILDING E LONG AND SHORT SECTION
- BUILDING F SECTION
- BUILDING G SECTION
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DRAWINGS
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- DESIGN ACCESS STATEMENT
- 1_BNG REPORT
- 2_BNG REPORT
- BLOCK PLAN
- 4_BNG REPORT
- 5_BNG REPORT
- DRAINAGE STRATEGY-1-9
- DRAINAGE STRATEGY-10-19
- DRAINAGE STRATEGY-20-29
- DRAINAGE STRATEGY-30-39
- DRAINAGE STRATEGY-40-49
- DRAINAGE STRATEGY-50-59
- DRAINAGE STRATEGY-60-69
- DRAINAGE STRATEGY-70-79
- DRAINAGE STRATEGY-80-81
- DRAINAGE STRATEGY-82-84
- DRAINAGE STRATEGY-85-86
- DRAINAGE STRATEGY-87-88
- ARBORICULTURE ASSESSMENT
- SITE WASTE MANAGEMENT PLAN
- TAPT1
- TRANSPORT ASSESSMENT FINAL_PART2
- TRANSPORT ASSESSMENT FINAL_PART3
- TRANSPORT ASSESSMENT FINAL_PART4
- TRANSPORT ASSESSMENT FINAL_PART5
- TRANSPORT ASSESSMENT FINAL_PART6
- TRANSPORT ASSESSMENT FINAL_PART7
- TRANSPORT ASSESSMENT FINAL_PART8
- TRANSPORT ASSESSMENT FINAL_PART9
- SCI
- LANDSCAPE GENERAL ARRANGEMENT
- LANDSCAPE TERRACE GA
- URBAN GREEN FACTOR
- FLOOD RISK ASSESSMENT
- CIRCULAR STATEMENT
- CONSTRUCTION MANAGEMENT PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- CONSTRUCTION LOGIC PLAN
- ENERGY SUSTAINABILITY
- INTERNAL DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- DAYLIGHT ASSESSMENT
- PLANNING STATEMENT
- ENVIRONMENT TECHNICAL SUMMARY
- INTRODUCTION
- PVP_ESVOL1_CH02_EIAMETHODOLOGY
- PVP_ESVOL1_CH03_ALTERNATIVESDESIGNEVOLUTION
- PVP_ESVOL1_CH04_PROPOSEDDEVELOPMENT
- PVP_ESVOL1_CH05_ENABLINGCONSTRUCTION
- PVP_ESVOL1_CH06_SOCIOECONOMICS
- PVP_ESVOL1_CH07_AIRQUALITY
- PVP_ESVOL1_CH8_NOISEVIBRATION
- PVP_ESVOL1_CH9_ECOLOGYBIODIVERSITY
- SUNLIGHT OVERSHADOWED AND SOLAR GLARE
- PVP_ESVOL1_CH11_WINDMICROCLIMATE
- PVP_ESVOL1_CH12_GROUNDCONDITIONS
- PVP_ESVOL1_CH13_CLIMATECHANGE
- PVP_ESVOL1_CH14_EFFECTINTERACTIONS
- PVP_ESVOL1_CH15_LIKELYSIGNIFICANTEFFECTS
- PVP_ESVOL1_CH16_MITIGATIONMONITORINGSCHEDULE
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART1
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART2
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART3
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART4
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART5
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART6
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART7
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART8
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART9
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART10
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART11
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART12
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART13
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART14
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART15
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART16
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART17
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART18
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART19
- PVP_ESVOL2_HTVIA_HIGHRESOLUTION_PART20
- AIR QUALITY ASSESSMENT
- PVP_ESVOL3_APPENDIX CLIMATE CHANGE
- PVP_ESVOL3_APPENDIX DSO_PART1
- PVP_ESVOL3_APPENDIX DSO_PART2
- PVP_ESVOL3_APPENDIX DSO_PART3
- PVP_ESVOL3_APPENDIX DSO_PART4
- PVP_ESVOL3_APPENDIX DSO_PART5
- PVP_ESVOL3_APPENDIX DSO_PART6
- PVP_ESVOL3_APPENDIX DSO_PART7
- PVP_ESVOL3_APPENDIX DSO_PART8
- PVP_ESVOL3_APPENDIX DSO_PART9
- PVP_ESVOL3_APPENDIX DSO_PART10
- PVP_ESVOL3_APPENDIX DSO_PART11
- PVP_ESVOL3_APPENDIX DSO_PART12
- PVP_ESVOL3_APPENDIX DSO_PART13
- PVP_ESVOL3_APPENDIX DSO_PART14
- PVP_ESVOL3_APPENDIX DSO_PART15
- PVP_ESVOL3_APPENDIX DSO_PART16
- PVP_ESVOL3_APPENDIX DSO_PART17
- PVP_ESVOL3_APPENDIX DSO_PART18
- PVP_ESVOL3_APPENDIX DSO_PART19
- PVP_ESVOL3_APPENDIX DSO_PART20
- PVP_ESVOL3_APPENDIX DSO_PART21
- PVP_ESVOL3_APPENDIX DSO_PART22
- PVP_ESVOL3_APPENDIX DSO_PART23
- PVP_ESVOL3_APPENDIX DSO_PART24
- PVP_ESVOL3_APPENDIX ECOLOGY_PART1
- PVP_ESVOL3_APPENDIX ECOLOGY_PART2
- PVP_ESVOL3_APPENDIX ECOLOGY_PART3
- PVP_ESVOL3_APPENDIX ECOLOGY_PART4
- PVP_ESVOL3_APPENDIX ECOLOGY_PART5
- PVP_ESVOL3_APPENDIX ECOLOGY_PART6
- PVP_ESVOL3_APPENDIX ECOLOGY_PART7
- PVP_ESVOL3_APPENDIX ECOLOGY_PART8
- PVP_ESVOL3_APPENDIX ECOLOGY_PART9
- PVP_ESVOL3_APPENDIX ECOLOGY_PART10
- PVP_ESVOL3_APPENDIX EIAMETHODOLOGY_PART1
- PVP_ESVOL3_APPENDIX EIAMETHODOLOGY_PART2
- PVP_ESVOL3_APPENDIX GROUNDCONDITIONS_PART1
- PVP_ESVOL3_APPENDIX GROUNDCONDITIONS_PART2
- PVP_ESVOL3_APPENDIX GROUNDCONDITIONS_PART3
- PVP_ESVOL3_APPENDIX GROUNDCONDITIONS_PART4
- PVP_ESVOL3_APPENDIX GROUNDCONDITIONS_PART5
- PVP_ESVOL3_APPENDIX GROUNDCONDITIONS_PART6
- APPENDIX INTRODUCTION
- PVP_ESVOL3_APPENDIX NOISEVIBRATION_PART1
- PVP_ESVOL3_APPENDIX NOISEVIBRATION_PART2
- PVP_ESVOL3_APPENDIX NOISEVIBRATION_PART3
- SOCIOECONOMICS
- APPENDIX WINDMICROCLIMATE
- HERITAGE STATEMENT
- PVP HIA APPENDIX 1-PT1
- PVP HIA APPENDIX 1-PT2
- PVP HIA APPENDIX 1-PT3
- PVP HIA APPENDIX 1-PT4
- PVP HIA APPENDIX 1-PT5
- PVP HIA APPENDIX 3-PT1
- PVP HIA APPENDIX 3-PT2
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Ealing for determination, against a statutory target of eight weeks. Over the last year Ealing decided full applications in a median of 80 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Park View Place Greenford Road, Greenford, UB6 0FF
Decision due ~26 Jun
Consultation from Neighbouring Authority: London Borough of Ealing; C onstruction of residential-led mixed use and phased development comprising residential units (Use Class C3) and co-living accommodation (Sui Generis) across 7 blocks with community space (Use Class F2), flexible commercial space (Use Class E) including convenience retail store, infrastructure to facilitate future pedestrian bridge connection to Grove Farm Park and ancillary car and cycle parking, landscaping, green infrastructure and private/communal amenity spaces
Status unknown Outline -
Park View Place Greenford Road Greenford UB6 0FF
75% historically approved · decision due ~2 Jun
Construction of residential-led mixed use and phased development comprising residential units (Use Class C3) and co-living accommodation (Sui Generis) across 7 blocks with community space (Use Class F2), flexible commercial space (Use Class E) including convenience retail store, infrastructure to facilitate future pedestrian bridge connection to Grove Farm Park and ancillary car and cycle parking, landscaping, green infrastructure and private/communal amenity spaces.
Awaiting decision Full applications 269 docs -
806B Atrium Point Greenford Road Greenford Ealing UB6 0FJ
Installation 6no. antennas and 4no. 600mm dish antennas supported on 3 separate rooftop pod systems; installation of 11no. radio equipment cabinets; and associated ancillary apparatus (56-Day Prior Notification Process).
Granted Telecoms 10 docs -
806B Atrium Point Greenford Road Greenford Ealing UB6 0FJ
Installation 6no. antennas and 4no. 600mm dish antennas supported on 3 separate rooftop pod systems; installation of 11no. radio equipment cabinets; and associated ancillary apparatus (56-Day Prior Notification Process).
Granted Telecoms 10 docs -
Park View Place Greenford Road Greenford UB6 0JA
Demolition of existing Block D (Lawful Development Certificate for an Existing Use/Development)
Granted Lawful development Demolition 12 docs -
Park View Place Greenford Road Greenford UB6 0JA
Demolition of existing Block D (Lawful Development Certificate for an Existing Use/Development)
Granted Lawful development Demolition 12 docs
Other full applications
In Ealing
-
262798FUL Granted
65A Seaford Road West Ealing W13 9HS
Rear roof extension incorporating a Juliet balcony; installation of two front rooflights
-
262384FUL Refused
37 Rosemont Road Acton W3 9LU
Change of use of the property from a large house in multiple occupation (Sui Generis) to six self-contained flats (Use Class C3); alterations and extensions to the main roof, including two hip-to-gable roof extensions and a rear roof extension; alterations to the side and rear fenestration; alterations to the ground floor rear roof; and alteration to the existing chimney stack.
-
260390FUL Granted
3C The Broadway Southall UB1 1JR
Change of use from jewellery shop (use class E) to hot food takeaway (sui generis); alterations to shopfront; installation of service duct to rear elevation
-
262753FUL Granted
Unit 39 The Metropolitan Centre Halifax Road Greenford UB6 8XU
Alterations to rear elevation (insertion of ventilation fan) of existing warehouse building
-
262304FUL Granted
12 Woodland Rise Greenford UB6 0RD
Change of Use of a single dwellinghouse (Use Class C3) into a small House in Multiple Occupation (HMO) (Use Class C4), for up to 5 occupants; including alterations to the rear and side elevations involving modifications and insertion of windows; and associated external alterations