Planning application
The Straight Southall Middlesex UB1 1QX
Works: Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of installation of Ultra Low NOx communal gas boilers pursuant to Condition 10 (before Phase 3 of the development) of planning permission ref: 205101REM dated 23/04/2021, originally decided by 171562VAR dated 16.10.2017 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial arrangement of the public and private realm with no change in the public-private realm split.
As published by the council, reference 222028CND
Application record
- Reference
- 222028CND
- Type
- Discharge Condition
- Status
- Approved
- Decision
- Approved
- Received
- 11 May 2022
- Validated
- 11 May 2022
- Decided
- 6 Apr 2023
- Ward
- Southall West
- Decision by
- Delegated Decision
- Postcode
- UB1 1QX
Site history
Applications at this address on the Ealing register
This site has had 8 applications since 2021: 5 approved, 0 refused.
-
260229NMA Granted
The Straight Southall Middlesex UB1 1QX
Application for a Non-Material Amendment in (S96a) in relation to planning permission reference 216077REM dated 30/08/2022 for 'Application for the approval of Reserved Matters pursuant to outline planning permission reference 171562VAR dated 16/10/2017, condition 2 pertaining to the second phase of development (Phase B): details relating to Layout, Appearance, Scale and Landscaping.' Application seeks to allow changes to the design for inclusion of a second core and compliance the fire regulations
-
260226NMA Withdrawn
The Straight Southall Middlesex UB1 1QX
Application for a Non-Material Amendment (S96a) to planning permission ref: 171562VAR dated:16/10/2017 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference 170819VAR dated 07.09.17 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 10.5m and plus etc...'. Amendment seeks to amend conditions 27 and 28 to remove reference to plan 52212/B/34/A
-
253555NMA Awaiting decision
The Straight Southall Middlesex UB1 1QX
Application for a Non-Material Amendment in (S96a) to planning permission 171563VAR dated 16.10.2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road'. Amendment seeks to remove condition 20.
-
253557NMA Awaiting decision
The Straight Southall Middlesex UB1 1QX
Application for a Non-Material Amendment in (S96a) to planning permission 171563VAR dated 16.10.2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road'. Amendment seeks to make alterations to TGQ Phase 2 Buildings F to L with an additional stair core to achieve BS9991 compliance; Buildings I, L and K and I are proposed to increase in height by two storeys each, and become as follows L - 14 storeys, K-10 storeys, I - 14 storeys
-
221507CND Granted
The Straight Southall Middlesex UB1 1QX
Submission of details confirming compliance with approved strategies pursuant to condition 10 (The Green Quarter - Partial Discharge for Phase 3 of the masterplan) of planning permission ref: 171562VAR dated 15/10/2017 of planning permission 171562VAR dated 16.10.2017 as varied by 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: : 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road
-
214381CND Granted
The Straight Southall Middlesex UB1 1QX
Details of a Construction Phase Plan part pursuant to Condition 13 (Phase 3) of 171562VAR dated 16.10.2017 for: 'demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial arrangement of the public and private realm with no change in the public-private realm split.'
-
214008CND Granted
The Straight Southall Middlesex UB1 1QX
Details of refuse, cycle and car parking storage and layout pursuant to Condition 4 of Planning Permisison ref: 205101REM dated 23.04.2021, originally decided by 171562VAR dated 16.10.2017 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial arrangement of the public and private realm with no change in the public-private realm split.
Timeline
Dates from the published record
-
11 May 2022
Received by Ealing
-
6 Apr 2023
Decision issued: Approved
-
21 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Ealing granted permission on 6 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Straight Southall Middlesex UB1 1QX
Details of installation of Ultra Low NOx communal gas boilers pursuant to Condition 10 (before Phase 3 of the development) of planning permission ref: 205101REM dated 23/04/2021, originally decided by 171562VAR dated 16.10.2017 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial arrangement of the public and private realm with no change in the public-private realm split.
Granted Conditions Demolition 18 docsMajor scheme -
The Green Quarter The Straight Southall UB1 1QZ
Application for a Non Material Amendment (S.96a) in relation to the removal of condition 26 which restricts the delivery of junction work being undertaken concurrently, pursuant to 171562VAR dated 16.10.2017, Reserved Matters Application pursuant to the Outline Consent was approved for Phase 1 - 160115REM dated 08.08.2016, Phase 2 - 185158REM dated 25.02.2019 and Phase 3 - 205101REM dated 23.04.2021
Granted Amendments 6 docs -
The Green Quarter The Straight Southall UB1 1QZ
Application for a Non Material Amendment (S.96a) in relation to the removal of condition 26 which restricts the delivery of junction work being undertaken concurrently, pursuant to 171562VAR dated 16.10.2017, Reserved Matters Application pursuant to the Outline Consent was approved for Phase 1 - 160115REM dated 08.08.2016, Phase 2 - 185158REM dated 25.02.2019 and Phase 3 - 205101REM dated 23.04.2021
Granted Amendments 6 docs -
2 The Straight Southall UB1 1QX
Construction of temporary building to be used as a food store (Use Class E) for up to 15 years
Granted Full applications 17 docs -
The Straight Southall Middlesex UB1 1QX
84% historically approved · decision due ~13 Nov
Application for a Non-Material Amendment in (S96a) to planning permission 171563VAR dated 16.10.2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road'. Amendment seeks to remove condition 20.
Awaiting decision Amendments Demolition 3 docsMajor scheme -
The Straight Southall Middlesex UB1 1QX
84% historically approved · decision due ~13 Nov
Application for a Non-Material Amendment in (S96a) to planning permission 171563VAR dated 16.10.2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road'. Amendment seeks to remove condition 20.
Awaiting decision Amendments Demolition 3 docsMajor scheme
Other condition discharge and variation applications
In Ealing
-
260882CND Refused
Weaver Rose House High Street Southall UB1 3DN
Details of a Ventilation Strategy Report pursuant to Condition 16 of planning permission ref: 232967FUL dated 31.01.2024 for: Construction of a six storey building with part basement level, comprising 24 self contained flats with associated cycle and bin storage as well as soft and hard landscaping (Following Demolition of the existing buildings)
-
260534CND Granted
444 Allenby Road Southall UB1 2HT
Submission of an enhanced sound insulation in pursuant to condition 9 of planning application Ref: 251383FUL dated 31.10.2025 for 'Conversion of dwellinghouse into two flats; single storey rear extension; front extension; front porch extension; part single, part two storey side extension (following demolition of existing garage); part single, part two storey rear extension with patio'
-
261058CND Granted
Nile Lodge Queens Walk Ealing W5 1TJ
Details of Ventilation Strategy Report pursuant to condition 10 of planning permission ref: 254396FUL dated 27/11/2024 for: Redevelopment of the site to deliver a hostel development (Sui Generis) in a part 4, part 5 storey building following the demolition of parts of the existing building on-site, retention of part of the front facade and associated external alterations, landscaping, car parking, refuse and cycle storage (part retrospective).
-
261853CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
260883CND Granted
Weaver Rose House High Street Southall UB1 3DN
Details of a Piling Method Statement pursuant to Condition 20 of planning permission ref: 232967FUL dated 31.01.2024 for: Construction of a six storey building with part basement level, comprising 24 self contained flats with associated cycle and bin storage as well as soft and hard landscaping (Following Demolition of the existing buildings)