Planning application
253557NMA
The Straight Southall Middlesex UB1 1QX
Proposal
Application for a Non-Material Amendment in (S96a) to planning permission 171563VAR dated 16.10.2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road'. Amendment seeks to make alterations to TGQ Phase 2 Buildings F to L with an additional stair core to achieve BS9991 compliance; Buildings I, L and K and I are proposed to increase in height by two storeys each, and become as follows L - 14 storeys, K-10 storeys, I - 14 storeys
As published by the council, reference 253557NMA
Timeline
Dates from the published record
-
18 Sep 2025
Received by Ealing
-
11 Nov 2025
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Ealing for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
253557NMA Awaiting decision
The Straight Southall Middlesex UB1 1QX
Application for a Non-Material Amendment in (S96a) to planning permission 171563VAR dated 16.10.2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road'. Amendment seeks to make alterations to TGQ Phase 2 Buildings F to L with an additional stair core to achieve BS9991 compliance; Buildings I, L and K and I are proposed to increase in height by two storeys each, and become as follows L - 14 storeys, K-10 storeys, I - 14 storeys
-
243548CND Granted
The Green Quarter The Straight Southall Middlesex UB1 1QX
Details of Hard and soft landscaping part pursuant to condition 3 (Phase 3 Linear Park only) of planning permission ref 195279REM dated 20/03/2020 for the; Application for the approval of Reserved Matters pertaining to the Linear Park pursuant to condition 2 of outline planning permission reference 171562VAR dated 16/10/2017 for' Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference 170819VAR dated 07.09.17 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre and associated car and cycle parking, landscaping, public realm, open space and children's play space.'
-
221507CND Granted
The Straight Southall Middlesex UB1 1QX
Submission of details confirming compliance with approved strategies pursuant to condition 10 (The Green Quarter - Partial Discharge for Phase 3 of the masterplan) of planning permission ref: 171562VAR dated 15/10/2017 of planning permission 171562VAR dated 16.10.2017 as varied by 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: : 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road
-
243548CND Granted
The Green Quarter The Straight Southall Middlesex UB1 1QX
Details of Hard and soft landscaping part pursuant to condition 3 (Phase 3 Linear Park only) of planning permission ref 195279REM dated 20/03/2020 for the; Application for the approval of Reserved Matters pertaining to the Linear Park pursuant to condition 2 of outline planning permission reference 171562VAR dated 16/10/2017 for' Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference 170819VAR dated 07.09.17 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre and associated car and cycle parking, landscaping, public realm, open space and children's play space.'
-
54814/APP/2017/2206 Granted
THE STRAIGHT HAYES BY PASS HAYES UB1 1QX
Non Material Amendment to planning permission 54814/APP/2009/430; (Outline application - Demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application New access roads from the Hayes by-pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, widening of South Road over the railway line for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union canal and Yeading Brook to provide pedestrian and cycle access to the Minet Country Park and Springfield Road) to allow amendments to Conditions 13 (Pump Lane/Bilton Way Junction Improvements) & Condition 14 (Pump Lane width restriction) to allow details relating to Condition 13 to be submitted at a later date and for the width restriction relating to Condition 14 to be provided through the provision of CCTV.
-
243549CND Granted
The Green Quarter The Straight Southall Middlesex UB1 1QX
Details of childrens playspace equipment part pursuant to condition 5 (Phase 3 Linear Park) of Planning Permission 195279REM dated 20/03/2020 for: Application for the approval of Reserved Matters pertaining to the Linear Park pursuant to condition 2 of outline planning permission reference 171562VAR dated 16/10/2017 for' Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference 170819VAR dated 07.09.17 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre and associated car and cycle parking, landscaping, public realm, open space and children's play space.'
Other amendments applications
In Ealing
-
262613OPDNMA Granted
The Perfume Factory Wales Farm Road Acton W3 6UG
Application for a Non-Material Amendment in (S96a) seeking to allow to revise the proposed mezzanine slab space in relation to planning permission reference 181062OPDFUL dated 10/08/2021 for: Demolition of existing buildings to provide 3 buildings comprising residential units and flexible commercial floorspace, the provision of public open space, roof top amenity space, landscaping, car and cycle parking and refuse storage.
-
254476NMA Granted
The Green Quarter The Straight Southall UB1 1QZ
Application for a Non Material Amendment (S96a) to planning permission ref. 205101REM dated 14.05.2021, for 'Application for the approval of Reserved Matters pursuant to outline planning permission reference 171562VAR dated 16/10/2017, condition 2 pertaining to the third phase of development (Phase 3): details relating to Layout, Appearance, Scale and Landscaping'. Amendment seeks alterations to Building G and internal alterations to Building E, amended to Building G entrance and reconfiguration of the car park layout
-
261770VAR Granted
Trailfinders Sports Club, The Cottage Vallis Way West Ealing W13 0DD
Application for a minor material amendment (s73) to vary Conditions 2 (Drawings) of planning permission ref. 252963HH dated 19.12.2025 'Alteration of roof involving raising of roof ridge height; and rear roof extension'. Variation seeks to increase ridge height and rear roof dormer height
-
262922NMA Awaiting decision
112 South Ealing Road Ealing W5 4QJ
Application for a Non-Material Amendment (S96a) to planning permission ref: 221046FUL dated 27.04.2022 for 'Single storey rear extension and alteration to external rear elevation involving removal and installation of staircase providing entrance to first floor'. Amendments seeks to relocation of fire escape walkway and removing two air condition condenser unit from the rear elevation and installing on the roof
-
262531NMA Granted
11 Blakesley Avenue Ealing W5 2DN
Application for non-material amendment to planning permission reference 254771HH dated 13.02.2026 'Single storey rear extension and infill extension incorporating a terrace (following the demolition of ground floor walls and lean-to extensions to the rear); Roof extension with photovoltaic panels to dormer roof; Installation of 3 rooflights to the front roofslope; AC units and acoustic enclosure; Installation of an EV charger to the side elevation; Alteration to fenestration details alongside the front, rear and side elevations; Installation of photovoltaic panels to the rear gable roof slope'. Amendment seeks to replace stone lintels with brick to north & south facing elevations (ground and first floor) and on the east elevation (first and second floor), minor design change to the doors on the east elevation (ground floor), amended size of the lantern roof light, removal of the condenser unit and enclosure from the north facing elevation, removal of two first floor windows to North Elevation