Skip to content
PlanIndex Get alerts
Menu

Planning application

Tayworks Brown Street Dundee DD1 5EF

Awaiting decision Dundee City 26/00262/LBC Listed Building Consent

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal and external alterations associated with a change of use from student accommodation commercial space to residential apartments

As published by the council, reference 26/00262/LBC

Application record

Reference
26/00262/LBC
Type
Listed Building Consent
Status
Registered
Received
28 Apr 2026
Validated
12 May 2026
Ward
West End
Parish
No CC/NRS In Operation
Postcode
DD1 5EF

Site history

Applications at this address on the Dundee City register

This site has had 2 applications since 2026.

  • 26/00261/FULL Awaiting decision

    Tayworks Brown Street Dundee DD1 5EF

    Change of use of student accommodation and commercial space to 140 residential apartments with associated works

    Submitted 28 Apr 2026 Full applications

Timeline

Dates from the published record

  1. 28 Apr 2026

    Received by Dundee City

  2. 12 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 7 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dundee City took a median of 58 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Houghton Planning Ltd Agent, a planning consultancy

15 applications on PlanIndex · across 6 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Mears Group PLC Applicant, registered in Gloucester

Active · incorporated 1996 · Gloucester

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

65 documents on file for this application

  • HES - NO OBJECTION Consultee Comment · 04 Jun 2026
  • ACKNOWLEDGEMENT Application Acknowledgement · 14 May 2026
  • 13 - EXISTING ELEVATION WEST Drawing · 12 May 2026
  • 45 - PROPOSED TYPICAL APARTMENT TYPES 01 Drawing · 12 May 2026
  • 09 - EXISTING ELEVATION Drawing · 12 May 2026
  • 11 - EXISTING ELEVATION SOUTH/NORTH GABLE Drawing · 12 May 2026
  • 12 - EXISTING ELEVATION EAST Drawing · 12 May 2026
  • 14 - EXISTING SECTION 01 Drawing · 12 May 2026
  • 20 - DEMOLITION PLAN FOURTH FLOOR Drawing · 12 May 2026
  • 25 - DEMOLITION ELEVATION EAST Drawing · 12 May 2026
  • 51 - PROPOSED FACADE REPAIRS Drawing · 12 May 2026
  • 50 - PROPOSED FACADE REPAIRS WEST Drawing · 12 May 2026
  • 47 - PROPOSED FACADE REPAIRS SOUTH/NORTH GABLE Drawing · 12 May 2026
  • 49 - PROPOSED FACADE REPAIRS ELEVATION EAST Drawing · 12 May 2026
  • 57 - EXTERNAL DOOR TYPES AND PROPOSED WORKS Drawing · 12 May 2026
  • 58 - PROPOSED TYPICAL COMBINATION ROOFLIGHT DETAIL Drawing · 12 May 2026
  • 17 - DEMOLITION PLAN FIRST FLOOR Drawing · 12 May 2026
  • 08 - EXISTING PLAN ROOF Drawing · 12 May 2026
  • 48 - PROPOSED FACADE REPAIRS NORTH/WEST GABLE Drawing · 12 May 2026
  • 42 - PROPOSED SECTION 01 Drawing · 12 May 2026
  • 43 - PROPOSED SECTION 02 Drawing · 12 May 2026
  • 54 - PROPOSED TYPICAL WINDOW AND EXTERNAL WALL DETAIL Drawing · 12 May 2026
  • 61 - DESIGN AND ACCESS STATEMENT PART 2 Design Statement · 12 May 2026
  • 06 - EXISTING PLAN THIRD FLOOR Drawing · 12 May 2026
  • 05 - EXISTING PLAN SECOND FLOOR Drawing · 12 May 2026
  • 03 - EXISTING PLAN GROUND/UPPER FLOOR Drawing · 12 May 2026
  • 07 - EXISTING PLAN FOURTH FLOOR Drawing · 12 May 2026
  • 04 - EXISTING PLAN FIRST FLOOR Drawing · 12 May 2026
  • 02 - EXISTING SITE PLAN Drawing · 12 May 2026
  • 15 - EXISTING SECTION 02 Drawing · 12 May 2026
  • 19 - DEMOLITION PLAN THIRD FLOOR Drawing · 12 May 2026
  • 24 - DEMOLITION ELEVATION SOUTH/NORTH GABLE Drawing · 12 May 2026
  • 23 - DEMOLITION ELEVATION NORTH/WEST GABLE Drawing · 12 May 2026
  • 56 - PROPOSED NEW TIMBER DOOR AND PANEL DETAIL Drawing · 12 May 2026
  • 59 - PROPOSED TYPICAL ROOF INSULATION DETAIL Drawing · 12 May 2026
  • 44 - PROPOSED TYPICAL FLOOR LAYOUT DETAIL Drawing · 12 May 2026
  • 22 - DEMOLITION ELEVATION Drawing · 12 May 2026
  • 26 - DEMOLITION ELEVATION WEST Drawing · 12 May 2026
  • 60 - DESIGN AND ACCESS STATEMENT PART 1 Design Statement · 12 May 2026
  • 27 - DEMOLITION SECTION 01 Drawing · 12 May 2026
  • 21 - DEMOLITION PLAN ROOF Drawing · 12 May 2026
  • 16 - DEMOLITION PLAN GROUND/UPPER GROUND Drawing · 12 May 2026
  • 46 - PROPOSED TYPICAL APARTMENT TYPES 02 Drawing · 12 May 2026
  • 55 - PROPOSED NEW SLIMLINE STEEL WINDOW DETAIL Drawing · 12 May 2026
  • 53 - WINDOW TYPES AND PROPOSED WORKS SHEET 2 Drawing · 12 May 2026
  • 52 - WINDOW TYPES AND PROPOSED WORKS SHEET 1 Drawing · 12 May 2026
  • 28 - DEMOLITION SECTION 02 Drawing · 12 May 2026
  • 18 - DEMOLITION PLAN SECOND FLOOR Drawing · 12 May 2026
  • 10 - EXISTING ELEVATION NORTH/WEST GABLE Drawing · 12 May 2026
  • 62 - HERITAGE IMPACT ASSESSMENT Report · 12 May 2026
  • APPLICATION FORM Application Form · 28 Apr 2026
  • 01 - LOCATION PLAN Drawing · 28 Apr 2026
  • 39 - PROPOSED ELEVATION EAST Drawing · 28 Apr 2026
  • 37 - PROPOSED ELEVATION NORTH/WEST GABLE Drawing · 28 Apr 2026
  • 38 - PROPOSED ELEVATION SOUTH/NORTH GABLE Drawing · 28 Apr 2026
  • 40 - PROPOSED ELEVATION WEST Drawing · 28 Apr 2026
  • 41 - PROPOSED ELEVATION Drawing · 28 Apr 2026
  • 31 - PROPOSED PLAN FIRST FLOOR Drawing · 28 Apr 2026
  • 34 - PROPOSED PLAN FOURTH FLOOR Drawing · 28 Apr 2026
  • 30 - PROPOSED PLAN GROUND/UPPER GROUND Drawing · 28 Apr 2026
  • 36 - PROPOSED PLAN ROOF TERRACE Drawing · 28 Apr 2026
  • 35 - PROPOSED PLAN ROOF Drawing · 28 Apr 2026
  • 32 - PROPOSED PLAN SECOND FLOOR Drawing · 28 Apr 2026
  • 33 - PROPOSED PLAN THIRD FLOOR Drawing · 28 Apr 2026
  • 29 - PROPOSED SITE PLAN Drawing · 28 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Dundee City for determination, against a statutory target of eight weeks. Over the last year Dundee City decided heritage and listed building applications in a median of 59 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Tay Works West Marketgait Dundee DD1 5EF

    02/00097/FUL Submitted 11 Feb 2002 18m away

    Change existing door and erect canopy

    Granted Full applications
  • Tay Works West Marketgait Dundee DD1 5EF

    05/00011/LBC Submitted 21 Dec 2004 18m away

    Listed building consent for internal and external alterations to form 48 bedroom hotel, office accommodation, four theme restaurants/bar and car parking

    Granted Heritage and listed buildings 11 docs
  • Tay Works West Marketgait Dundee DD1 5EF

    05/00043/FUL Submitted 21 Dec 2004 18m away

    Internal and external alterations to existing building to form 48 bedroom hotel, office accomodation, four theme restaurants/bars and 48 car parking spaces

    Granted Full applications
  • Tay Works West Marketgait Dundee DD1 5EF

    05/00012/CON Submitted 21 Dec 2004 18m away

    Demolition of industrial building and structures and alterations to boundary wall

    Granted Heritage and listed buildings Demolition 5 docs
    Small domestic
  • Public House 13 - 15 Brown Street Dundee DD1 5EF

    09/00706/ADV Submitted 3 Nov 2009 18m away

    1 x Internally illuminated fascia sign, 1 x spot light wall sign and 3 spot lit banners

    Granted Advertising 6 docs
  • Tayworks Brown Street Dundee DD1 5EF

    26/00261/FULL Submitted 28 Apr 2026 23m away

    97% historically approved · decision due ~15 Jul

    Change of use of student accommodation and commercial space to 140 residential apartments with associated works

    Awaiting decision Full applications New dwelling 91 docs

In Dundee City

  • 26/00554/LBC Awaiting decision

    Flat 5 Craigiebarn House 41 - 49 Craigiebarn Road Dundee DD4 7GA

    Replacement of single and double glazed windows with new double glazed units

    11 Sep 2026 Heritage and listed buildings
  • 26/00285/LBC Granted

    9 And 11 Laurel Bank Dundee DD3 6JA

    Alterations (sub-division) and extension of listed building to create 3 flatted dwellings

    6 May 2026 Heritage and listed buildings
  • 26/00032/LBC Granted

    The Cairn Centre 12 Rattray Street Dundee DD1 1NA

    Internal and external alterations associated with change of use

    22 Jan 2026 Heritage and listed buildings
  • 26/00427/LBC Granted

    Royal Apartments 5 And 15 Union Street Dundee

    Relocation of rainwater pipe

    6 Jul 2026 Heritage and listed buildings
  • 26/00531/LBC Awaiting decision

    5A Fairfield Road Broughty Ferry Dundee DD5 1NX

    Replacement windows

    28 Aug 2026 Heritage and listed buildings