Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00261/FULL

Tayworks Brown Street Dundee DD1 5EF

Awaiting decision Dundee City Full Application Local

Proposal

Change of use of student accommodation and commercial space to 140 residential apartments with associated works

As published by the council, reference 26/00261/FULL

Timeline

Dates from the published record

  1. 28 Apr 2026

    Received by Dundee City

  2. 20 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Dundee City for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00262/LBC Awaiting decision

    Tayworks Brown Street Dundee DD1 5EF

    Internal and external alterations associated with a change of use from student accommodation commercial space to residential apartments

    28 Apr 2026 23m away Heritage and listed buildings
  • 26/00179/LBC Awaiting decision

    Premises 9 Guthrie Street Dundee DD1 5DR

    Internal alterations and external alterations which include the installation of roller shutters and new glazed windows.

    17 Mar 2026 138m away Heritage and listed buildings
  • 25/0045/NMV Awaiting decision

    British Telecom 21 Ward Road Dundee DD1 1BA

    Proposed Alterations to Window Formats, Changes To 5th Floor Courtyard & Forester Street Elevations, and Central Wing Plant Screen Removed

    29 Dec 2025 145m away Conditions
  • CND/0037/2026 Awaiting decision

    British Telecom 21 Ward Road Dundee DD1 1BA

    Discharge of condition 8 of planning application 23/00684/FULL

    8 Jul 2026 145m away Conditions
  • 25/00581/FULL Refused

    63 Brown Street Dundee

    Part change of use to 3 Disability Discrimination Act compliant student bedrooms (sui generis) and formation of commercial and storage space

    22 Oct 2025 159m away Full applications
  • 26/00032/LBC Awaiting decision

    The Cairn Centre 12 Rattray Street Dundee DD1 1NA

    Internal and external alterations associated with change of use

    22 Jan 2026 171m away Heritage and listed buildings

In Dundee City

  • 26/00300/FULL Granted

    Glengaa 8A Dalhousie Road Broughty Ferry Dundee DD5 2SQ

    Roof dormer with balcony and external alterations

    12 May 2026 Full applications
  • 26/00451/FULL Awaiting decision

    99 Monifieth Road Broughty Ferry Dundee DD5 2SL

    Erection of a single-storey extension to the dwelling to provide a utility room. Internal alterations to improve and rationalise the existing layout.

    20 Jul 2026 Full applications
  • 26/00447/FULL Awaiting decision

    49 Grove Road Broughty Ferry Dundee DD5 1JP

    Alterations to garage

    20 Jul 2026 Full applications
  • 26/00339/FULL Granted

    2 Cox Street Dundee DD3 9HA

    Installation of ATM

    1 Jun 2026 Full applications
  • 26/00441/FULL Awaiting decision

    Dens Road Market Dens Road Dundee DD3 7QA

    Residential development comprising 44 dwellings and associated works.

    16 Jul 2026 Full applications