Planning application

Larbrax Leswalt Stranraer DG9 0RR

Awaiting decision Dumfries and Galloway 24/2623/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

ERECTION OF 4 WIND TURBINES ( 4 TURBINES 149.9 METRES MAXIMUM HEIGHT TO BLADE TIP) WITH BATTERY ENERGY STORAGE SYSTEM, CONTROL BUILDING AND SUBSTATION, FORMATION OF ACCESS TRACKS AND SITE ACCESS JUNCTION ONTO B738, WATERCOURSE CROSSINGS, PASSING PLACES, CRANE HARDSTANDINGS, TEMPORARY CONSTRUCTION COMPOUND AND BORROW PIT, TEMPORARY CLEARANCE/LAYDOWN AREAS AND ASSOCIATED INFRASTRUCTURE

As published by the council, reference 24/2623/FUL

Application record

Reference
24/2623/FUL
Type
Full Application
Status
Assessment Stage
Received
20 Dec 2024
Validated
8 Jan 2025
Ward
Stranraer And The Rhins
Postcode
DG9 0RR

Site history

Applications at this address on the Dumfries and Galloway register

This site has had 3 applications since 2020: 1 approved, 1 refused.

  • 23/2697/S42 Refused

    Larbrax Leswalt Stranraer DG9 0RR

    ERECTION OF 8 WIND TURBINES AND ANCILLARY INFRASTRUCTURE INCLUDING TRANSFORMER KIOSKS, 8 CRANE PADS, CONTROL BUILDING AND SUBSTATION COMPOUND, TEMPORARY CONSTRUCTION COMPOUND, 1 PERMANENT ANEMOMETER MAST (MAXIMUM HEIGHT 60M), 2 TEMPORARY ANEMOMETER MASTS (MAXIMUM HEIGHT 60M), UNDERGROUND CABLING, 2 BORROW PITS, FORMATION OF NEW VEHICULAR ACCESS AND CONSTRUCTION OF SITE ACCESS TRACKS (AT VARIANCE WITH CONDITION 5 OF PLANNING PERMISSION 20/1714/S42 TO VARY THE PERIOD OF TIME FOR CONTINUOUSLY NON-OPERATIONAL TURBINES FROM 12 MONTHS TO 11 MONTHS)

    Decided 26 Mar 2024
  • 20/1714/S42 Granted

    Larbrax Leswalt Stranraer DG9 0RR

    ERECTION OF 8 WIND TURBINES AND ANCILLARY INFRASTRUCTURE INCLUDING TRANSFORMER KIOSKS, 8 CRANE PADS, CONTROL BUILDING AND SUBSTATION COMPOUND, TEMPORARY CONSTRUCTION COMPOUND, 1 PERMANENT ANEMOMETER MAST (MAXIMUM HEIGHT 60M), 2 TEMPORARY ANEMOMETER MASTS (MAXIMUM HEIGHT 60M), UNDERGROUND CABLING, 2 BORROW PITS, FORMATION OF NEW VEHICULAR ACCESS AND CONSTRUCTION OF SITE ACCESS TRACKS (AT VARIANCE WITH CONDITION 1 OF PLANNING PERMISSION 18/1945/FUL TO ALLOW FOR AN INCREASED ELECTRICITY GENERATION PERIOD OF 30 YEARS, AND WITH THE ADDITION OF PROPOSED ADDITIONAL CONDITION 33 TO ALLOW FOR A PERIOD OF 3 YEARS FROM THE DATE OF THE GRANT OF PERMISSIONFOR THE COMMENCEMENT OF DEVELOPMENT) (SECTION 42)

    Decided 16 Dec 2020

Timeline

Dates from the published record

  1. 20 Dec 2024

    Received by Dumfries and Galloway

  2. 8 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 13 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 March 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dumfries and Galloway took a median of 50 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Land Use Consultants Ltd Agent, registered in London

Active · incorporated 1990 · London

11 applications on PlanIndex · across 7 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

117 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Dumfries and Galloway for determination, against a statutory target of eight weeks. Over the last year Dumfries and Galloway decided full applications in a median of 59 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Dumfries and Galloway

  • 26/1723/FUL Awaiting decision

    Linquenda Laurieston Road Gatehouse Of Fleet DG7 2HZ

    ALTERATIONS INCLUDING INSTALLATION OF 2NO.ROOFLIGHTS TO EAST ELEVATION, REPLACEMENT WINDOWS AND DOORS AND PHOTOVOLTAIC PANELS TO GARAGE ROOF AND ERECTION OF SINGLE STOREY EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE, ERECTION OF BOUNDARY FENCE AND GATES AND ENLARGEMENT OF EXISTING VEHICULAR ACCESS ONTO C13S PUBLIC ROAD

    Received 2 Oct, published by the council 6 Oct 2026 Full applications
  • 26/1361/FUL Granted

    Lower Double Lodge Cally Gatehouse Of Fleet DG7 2DB

    ERECTION OF SINGLE STOREY EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE

    Received 5 Aug, published by the council 13 Aug 2026 Full applications
  • 26/1259/FUL Granted

    Dergoals Glenluce Newton Stewart DG8 0LG

    ERECTION DWELLINGHOUSE (CLASS 9), INSTALLATION OF SEPTIC TANK AND SOAKAWAY, FORMATION OF ACCESS TRACK AND ERECTION OF FENCE

    Received 20 Jul, published by the council 29 Jul 2026 Full applications
  • 26/1297/FUL Granted

    11 Turnberry Road Annan DG12 6LH

    ERECTION OF DOMESTIC RESIDENTIAL ANNEXE

    Received 28 Jul, published by the council 17 Aug 2026 Full applications
  • 26/1348/FUL Granted

    8 Croft Road Gretna DG16 5JR

    ERECTION OF TWO STOREY EXTENSION TO SIDE ELEVATION AND SINGLE STOREY EXTENSION TO REAR ELEVATION OF DWELLINGHOUSE

    Received 4 Aug, published by the council 6 Aug 2026 Full applications