Planning application
Larbrax Leswalt Stranraer DG9 0RR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
ERECTION OF 8 WIND TURBINES AND ANCILLARY INFRASTRUCTURE INCLUDING TRANSFORMER KIOSKS, 8 CRANE PADS, CONTROL BUILDING AND SUBSTATION COMPOUND, TEMPORARY CONSTRUCTION COMPOUND, 1 PERMANENT ANEMOMETER MAST (MAXIMUM HEIGHT 60M), 2 TEMPORARY ANEMOMETER MASTS (MAXIMUM HEIGHT 60M), UNDERGROUND CABLING, 2 BORROW PITS, FORMATION OF NEW VEHICULAR ACCESS AND CONSTRUCTION OF SITE ACCESS TRACKS (AT VARIANCE WITH CONDITION 1 OF PLANNING PERMISSION 18/1945/FUL TO ALLOW FOR AN INCREASED ELECTRICITY GENERATION PERIOD OF 30 YEARS, AND WITH THE ADDITION OF PROPOSED ADDITIONAL CONDITION 33 TO ALLOW FOR A PERIOD OF 3 YEARS FROM THE DATE OF THE GRANT OF PERMISSIONFOR THE COMMENCEMENT OF DEVELOPMENT) (SECTION 42)
As published by the council, reference 20/1714/S42
Application record
- Reference
- 20/1714/S42
- Type
- Section 42
- Status
- Decided
- Decision
- Granted As published: Grant Conditionally
- Received
- 6 Oct 2020
- Validated
- 12 Oct 2020
- Decided
- 16 Dec 2020
- Ward
- Stranraer And The Rhins
- Decision by
- Planning Applications Committee
- Postcode
- DG9 0RR
Site history
Applications at this address on the Dumfries and Galloway register
This site has had 3 applications since 2020: 1 approved, 1 refused.
-
24/2623/FUL Awaiting decision
Larbrax Leswalt Stranraer DG9 0RR
ERECTION OF 4 WIND TURBINES ( 4 TURBINES 149.9 METRES MAXIMUM HEIGHT TO BLADE TIP) WITH BATTERY ENERGY STORAGE SYSTEM, CONTROL BUILDING AND SUBSTATION, FORMATION OF ACCESS TRACKS AND SITE ACCESS JUNCTION ONTO B738, WATERCOURSE CROSSINGS, PASSING PLACES, CRANE HARDSTANDINGS, TEMPORARY CONSTRUCTION COMPOUND AND BORROW PIT, TEMPORARY CLEARANCE/LAYDOWN AREAS AND ASSOCIATED INFRASTRUCTURE
-
23/2697/S42 Refused
Larbrax Leswalt Stranraer DG9 0RR
ERECTION OF 8 WIND TURBINES AND ANCILLARY INFRASTRUCTURE INCLUDING TRANSFORMER KIOSKS, 8 CRANE PADS, CONTROL BUILDING AND SUBSTATION COMPOUND, TEMPORARY CONSTRUCTION COMPOUND, 1 PERMANENT ANEMOMETER MAST (MAXIMUM HEIGHT 60M), 2 TEMPORARY ANEMOMETER MASTS (MAXIMUM HEIGHT 60M), UNDERGROUND CABLING, 2 BORROW PITS, FORMATION OF NEW VEHICULAR ACCESS AND CONSTRUCTION OF SITE ACCESS TRACKS (AT VARIANCE WITH CONDITION 5 OF PLANNING PERMISSION 20/1714/S42 TO VARY THE PERIOD OF TIME FOR CONTINUOUSLY NON-OPERATIONAL TURBINES FROM 12 MONTHS TO 11 MONTHS)
Timeline
Dates from the published record
-
6 Oct 2020
Received by Dumfries and Galloway
-
12 Oct 2020
Validated
Checked as complete and ready for consideration.
-
16 Dec 2020
Decision issued: Grant Conditionally
-
20 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
45 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Dumfries and Galloway granted permission on 16 December 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Dumfries and Galloway's portal will say. Our guide explains the common types.