Planning application
Leeson House Field Studies Centre Access To Leeson House Langton Matravers BH19 3EU
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
New extension for WCs and showers, internal alterations and external alterations.
As published by the council, reference P/LBC/2026/04555
Application record
- Reference
- P/LBC/2026/04555
- Type
- Listed Building Consent
- Status
- Out To Consultation
- Received
- 19 Aug 2026
- Validated
- 19 Aug 2026
- Ward
- South East Purbeck Ward
- Parish
- Langton Matravers
- Postcode
- BH19 3EU
Site history
Applications at this address on the Dorset register
This site has had 2 applications since 2026.
-
P/FUL/2026/04554 Awaiting decision
Leeson House Field Studies Centre Access To Leeson House Langton Matravers BH19 3EU
New extension for WCs and showers, internal alterations and external alterations.
Timeline
Dates from the published record
-
19 Aug 2026
Received by Dorset
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Dorset took a median of 37 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Dorset for determination, against a statutory target of eight weeks. Over the last year Dorset decided heritage and listed building applications in a median of 55 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Leeson House Field Studies Centre Access To Leeson House Langton Matravers BH19 3EU
85% historically approved · decision due ~14 Oct
New extension for WCs and showers, internal alterations and external alterations.
Awaiting decision Full applications Extension 21 docs -
Leeson House Field Studies Centre Langton Matravers Swanage BH19 3EU
Tree 1 Elm - Fell to ground level (dead). G7 Elms x5 - Fell to ground level (dead). Tree 211 Copper Beech - Remove major deadwood. Tree 260 Sycamore - Fell to ground level (dead). Tree 269 Sycamore - Fell to ground level (dead). Tree 323 Sycamore - Fell to ground level (dead). Tree 324 Sycamore - Fell to ground level (dead). Tree 342 Elm - Fell to ground level (dead). Tree 345 Elm - Fell to ground level (dead). Tree 346 Elm - Fell to ground level (dead). Tree 351 Elm - Fell to ground level (dead).
Granted Trees 2 docs -
Leeson House Field Studies Centre Langton Matravers Swanage BH19 3EU
Tree 11 Sycamore - Fell to ground level. Tree 17 Ash - Fell to ground level. Tree 40 Ash - Fell to ground level. Tree 69 Sycamore - Fell to ground level. Tree 162 Ash - Fell to ground level. Tree 189 Magnolia - Prune to clear buildings by 1 metre. Remove small basal sucker growing next to building. Reduce height by 2 metres to form a flat top, reduce lateral growth by 1-1.5 metres. Tree 210 Yew - Prune to clear buildings by 1.5 metres. Tree 234 Sycamore - Fell to ground level. Tree 347 Elm - Fell to ground level. Tree 353 Elm - Fell to ground level. Tree 354 Elm - Fell to ground level.
Decided Trees 3 docs -
Land opposite Giverny, Coombe Hill, Coombe, Swanage, BH19 3EU
Sycamore (Dead) - Fell
Granted Trees 2 docs -
Salt Pig The Farm Putlake Adventure Farm B3069 Crack Lane To Steppes Hill Langton Matravers BH19 3EU
Regulation 77 application to ensure compliance with Regulation 3 of the General Permitted Development Order, for 50 pitch pop up campsite for a period of 60 days, no more than 42 consecutive days. (23rd May–30th May, 6th June, 12th/13th June, 19th,/20th June, 26th,/27th June, 3rd/4th July, 10th/11th July , 17th/18th July, 24th-31st July, 1st- 31st August
Granted 7 docs -
4 New Buildings A351 High Street Coombe BH19 3DL
T1 Ash: Fell to ground level. T2 Ash: Pollard back to previous pollard points.
Decided Trees 4 docs
Other heritage and listed building applications
In Dorset
-
P/LBC/2026/04721 Awaiting decision
240 Preston Road Weymouth DT3 6BJ
Replacement signage, Lighting and external decoration
-
P/LBC/2026/04757 Awaiting decision
1 Stable Cottage Road To Clyffe House Tincleton DT2 8QR
Replacement of 6no. windows
-
P/LBC/2026/02459 Granted
3 St Mary Street Weymouth DT4 8PB
Like-for-like repair and re-covering of existing roof structures, including localised structural repairs and renewal of associated leadwork and roof finishes.
-
P/LBC/2026/04477 Awaiting decision
700 Dorchester Road Weymouth DT3 5LA
Erect a replacement building to provide ancillary letting rooms in connection with the existing public house
-
P/LBC/2026/04755 Awaiting decision
Innsacre Shipton Road Shipton Gorge DT6 4LJ
External and internal alterations which include new flue, stone cladding, windows and doors