Planning application
Leeson House Field Studies Centre Access To Leeson House Langton Matravers BH19 3EU
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
New extension for WCs and showers, internal alterations and external alterations.
As published by the council, reference P/FUL/2026/04554
Application record
- Reference
- P/FUL/2026/04554
- Type
- Full Planning Application
- Status
- Out To Consultation
- Received
- 19 Aug 2026
- Validated
- 19 Aug 2026
- Ward
- South East Purbeck Ward
- Parish
- Langton Matravers
- Postcode
- BH19 3EU
Site history
Applications at this address on the Dorset register
This site has had 2 applications since 2026.
-
P/LBC/2026/04555 Awaiting decision
Leeson House Field Studies Centre Access To Leeson House Langton Matravers BH19 3EU
New extension for WCs and showers, internal alterations and external alterations.
Timeline
Dates from the published record
-
19 Aug 2026
Received by Dorset
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Dorset took a median of 37 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Dorset for determination, against a statutory target of eight weeks. Over the last year Dorset decided full applications in a median of 63 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Leeson House Field Studies Centre Access To Leeson House Langton Matravers BH19 3EU
95% historically approved · decision due ~14 Oct
New extension for WCs and showers, internal alterations and external alterations.
Awaiting decision Heritage and listed buildings Extension 21 docs -
Leeson House Field Studies Centre Langton Matravers Swanage BH19 3EU
Tree 1 Elm - Fell to ground level (dead). G7 Elms x5 - Fell to ground level (dead). Tree 211 Copper Beech - Remove major deadwood. Tree 260 Sycamore - Fell to ground level (dead). Tree 269 Sycamore - Fell to ground level (dead). Tree 323 Sycamore - Fell to ground level (dead). Tree 324 Sycamore - Fell to ground level (dead). Tree 342 Elm - Fell to ground level (dead). Tree 345 Elm - Fell to ground level (dead). Tree 346 Elm - Fell to ground level (dead). Tree 351 Elm - Fell to ground level (dead).
Granted Trees 2 docs -
Leeson House Field Studies Centre Langton Matravers Swanage BH19 3EU
Tree 11 Sycamore - Fell to ground level. Tree 17 Ash - Fell to ground level. Tree 40 Ash - Fell to ground level. Tree 69 Sycamore - Fell to ground level. Tree 162 Ash - Fell to ground level. Tree 189 Magnolia - Prune to clear buildings by 1 metre. Remove small basal sucker growing next to building. Reduce height by 2 metres to form a flat top, reduce lateral growth by 1-1.5 metres. Tree 210 Yew - Prune to clear buildings by 1.5 metres. Tree 234 Sycamore - Fell to ground level. Tree 347 Elm - Fell to ground level. Tree 353 Elm - Fell to ground level. Tree 354 Elm - Fell to ground level.
Decided Trees 3 docs -
Land opposite Giverny, Coombe Hill, Coombe, Swanage, BH19 3EU
Sycamore (Dead) - Fell
Granted Trees 2 docs -
Salt Pig The Farm Putlake Adventure Farm B3069 Crack Lane To Steppes Hill Langton Matravers BH19 3EU
Regulation 77 application to ensure compliance with Regulation 3 of the General Permitted Development Order, for 50 pitch pop up campsite for a period of 60 days, no more than 42 consecutive days. (23rd May–30th May, 6th June, 12th/13th June, 19th,/20th June, 26th,/27th June, 3rd/4th July, 10th/11th July , 17th/18th July, 24th-31st July, 1st- 31st August
Granted 7 docs -
4 New Buildings A351 High Street Coombe BH19 3DL
T1 Ash: Fell to ground level. T2 Ash: Pollard back to previous pollard points.
Decided Trees 4 docs
Other full applications
In Dorset
-
P/FUL/2026/04686 Awaiting decision
Hut 5 Field 768 Access Track To Fields 758 And 766 To 769 Portland Bill Portland
Dismantle existing structure and replace with timber clad hut
-
P/FUL/2026/04184 Awaiting decision
Crumpets Farm Crumpets Farm Drive Lytchett Matravers BH16 6AL
Partial change of use of site to form area for 2 No. short term holiday let pods and access to highway
-
P/FUL/2026/03213 Granted
15 Regents Court Victoria Road Swanage BH19 1LY
Erect block of garages, with 5 individual garage spaces
-
P/FUL/2026/01222 Granted
Unit D Link Estate Blackhill Road Holton Heath Trading Park Holton Heath BH16 6LS
Demolish existing office building and use land as open air commercial storage, plus installation of 2.0 metre high palisade fencing
-
P/FUL/2026/04684 Awaiting decision
23 Gorse Lane Upton BH16 5RR
Installation of outdoor air conditioning unit