Planning application
19/03160/FUL
Runways Farm Upper Bourne End Lane Hemel Hempstead Hertfordshire HP1 2RR
Proposal
Removal of all temporary buildings and parking spaces and construction of a new 'Customer Building' and 'Maintenance Building' and consolidated parking area together with landscaping.
As published by the council, reference 19/03160/FUL
Timeline
Dates from the published record
-
12 Dec 2019
Received by Dacorum
-
18 Dec 2019
Validated
Checked as complete and ready for consideration.
-
6 Aug 2025
Decision issued: Grant Permission/Consent
-
23 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21/02154/DRC Granted
Land Adjoining Reservoir Upper Bourne End Lane Hemel Hempstead Hertfordshire HP1 2RR
Details as required by condition 5 (hard & soft Landscaping) of planning permission 4/00670/19/FUL (Construction of stables. Refurbishment of existing building for use as store. Upgrading of land for use as Paddock)
-
25/03159/MOA Awaiting decision
Land Off Hempstead Road Newhouse Road Bovingdon Hemel Hempstead Hertfordshire
Hybrid Planning Application for a Residential development comprising Outline Planning Application for up to 145 dwellings (Use Class C3) including public open space, a community orchard, landscaping, play areas, drainage features and associated infrastructure. All matters reserved except for access from Hempstead Road and Full Planning Application for the change of use from agricultural land to 12.42 hectares of Suitable Accessible Natural Green Space (SANG), together with a vehicular access, carpark, paths, fencing and landscaping.
-
26/00958/PIP Refused
Land Northeast Of Wayside Upper Bourne End Lane Hemel Hempstead Hertfordshire
Permission in principle for the construction of a self-build dwellinghouse
-
24/02022/DRC Granted
Lot B2A Upper Bourne End Lane Hemel Hempstead Hertfordshire
Details required by Condition 3 (Construction Management Plan) attached to planning permission 22/03569/FUL (Re-surfacing of existing track with gravel and extension of track within the site).
Other full applications applications
In Dacorum
-
26/01651/FUL Awaiting decision
Hemel Hempstead School Heath Lane Hemel Hempstead Hertfordshire HP1 1TX
Two-storey extension to the existing Sixth Form and Teaching Block, along with associated plant infrastructure and external works.
-
26/01087/FUL Granted
3A Blossom Way Hemel Hempstead Hertfordshire HP2 4ZB
Installation of eight condenser units and associated cable tray in connection with the adjacent Data Centre
-
26/01643/FUL Awaiting decision
Hemel Hempstead School Heath Lane Hemel Hempstead Hertfordshire HP1 1TX
Installation of external walkway lighting, with associated electrical infrastructure.
-
26/00745/FUL Granted
62 Oak Street Hemel Hempstead Hertfordshire HP3 9TT
Single-storey rear extension and creation of two off-street parking spaces at front of house with crossover and dropped kerb.
-
26/01199/FUL Refused
44 High Street Bovingdon Hemel Hempstead Hertfordshire HP3 0HJ
Proposed demolition of existing buildings and construction of shop and 4x residential units