Land North East Of Mickleton Mattock Mews Mickleton Gloucestershire

Awaiting decision Cotswold 26/02433/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 85 residential units, including provision of vehicular and pedestrian access, green infrastructure and associated works

As published by the council, reference 26/02433/FUL

Application record

Reference
26/02433/FUL
Type
Full Application
Status
Awaiting decision
Received
11 Aug 2026
Validated
28 Aug 2026
Ward
Campden & Vale
Parish
Mickleton

Timeline

Dates from the published record

  1. 11 Aug 2026

    Received by Cotswold

  2. 28 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 2 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cotswold took a median of 52 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

270 documents on file for this application

  • FOUL NETWORK CALULATIONS Report · 01 Sep 2026
  • AIR QUALITY ASSESSMENT Report · 11 Aug 2026
  • TREE PROTECTION PLAN Drawing · 11 Aug 2026
  • GEOPHYSICAL SURVEY REPORT Report · 11 Aug 2026
  • HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT Report · 11 Aug 2026
  • GEOPHYSICAL SURVEY Report · 11 Aug 2026
  • DRAINAGE STRATEGY SHEET 1 OF 2 Drawing · 11 Aug 2026
  • DRAINAGE STRATEGY SHEET 2 OF 2 Drawing · 11 Aug 2026
  • PROPOSED LEVELS, SHEET 1 OF 2 Drawing · 11 Aug 2026
  • PROPOSED LEVELS, SHEET 2 OF 2 Drawing · 11 Aug 2026
  • BASIN SECTION LOCATION PLAN Drawing · 11 Aug 2026
  • BASIN SECTIONS Drawing · 11 Aug 2026
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Report · 11 Aug 2026
  • SINGLE GARAGE (PLOTS 16, 17, 18, 41, 51, 52, 75 & 76) - PLANS, ELEVATIONS & SECT Drawing · 11 Aug 2026
  • SINGLE GARAGE (PLOTS 03, 04, 39 & 40) - PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • DOUBLE GARAGE - (PLOTS 05, 08 & 53 - PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • DOUBLE GARAGE (PLOTS 01, 38 & 42) - PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • DOUBLE CAR PORT - PLANS, ELEVATIONS & SECTIONS Drawing · 11 Aug 2026
  • TRIPLE CAR PORT - PLANS, ELEVATIONS & SECTIONS Drawing · 11 Aug 2026
  • SUBSTATION - PLANS, ELEVATIONS & SECTIONS Drawing · 11 Aug 2026
  • DRAWING ISSUE SHEET SHEET 1-3 Report · 11 Aug 2026
  • SCHEDULE OF ACCOMMODATION Report · 11 Aug 2026
  • MATERIAL SCHEDULE Report · 11 Aug 2026
  • DESIGN & ACCESS STATEMENT 1 Report · 11 Aug 2026
  • DESIGN AND ACCESS STATEMENT 2 Report · 11 Aug 2026
  • DESIGN AND ACCESS STATEMENT 3 Report · 11 Aug 2026
  • DESIGN AND ACCESS STATEMENT 4 Report · 11 Aug 2026
  • VERIFIABLE VIEWS METHODOLOGY Report · 11 Aug 2026
  • THE LOCATION PLAN Drawing · 11 Aug 2026
  • EXISTING SITE/BLOCK PLAN Drawing · 11 Aug 2026
  • EXISTING SECTION Drawing · 11 Aug 2026
  • PROPOSED SITE PLAN Drawing · 11 Aug 2026
  • PROPOSED SITE MASTERPLAN Drawing · 11 Aug 2026
  • PROPOSED SITE MASTERPLAN Photograph · 11 Aug 2026
  • PROPOSED SITE MASTERPLAN 2 Drawing · 11 Aug 2026
  • BUILDING HEIGHTS Drawing · 11 Aug 2026
  • BUILDING MIX Drawing · 11 Aug 2026
  • PARKING STRATEGY Drawing · 11 Aug 2026
  • TENURE PLAN Drawing · 11 Aug 2026
  • REFUSE STRATEGY Drawing · 11 Aug 2026
  • BOUNDARY TREATMENT PLAN Drawing · 11 Aug 2026
  • MATERIALS PLAN Drawing · 11 Aug 2026
  • PHASING PLAN Drawing · 11 Aug 2026
  • PROPOSED STREET SCENE 2 Drawing · 11 Aug 2026
  • PROPOSED STREET SCENE Drawing · 11 Aug 2026
  • PROPOSED SECTION Drawing · 11 Aug 2026
  • 4B-T1 - (PLOTS 01, 38 & 42) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 4B-T1 - (PLOTS 05, 08 & 53) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 3B-T1 - (PLOTS 03, 04, 39 & 40) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • COL - (PLOTS 02, 16, 18, 41, 51 & 52) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 4B6P HA - (PLOTS 63-64 & 69-70) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • BRE - (PLOTS 17, 43, 44, 45) - PLANS, ELEVATIONS & SETION Drawing · 11 Aug 2026
  • BRE - (PLOTS 09-10 & 14-15) - PLANS, ELEVATIONS & SETION Drawing · 11 Aug 2026
  • BRE - (PLOTS 06, 07 & 48) - PLANS, ELEVATIONS & SETION Drawing · 11 Aug 2026
  • BRE - (PLOT 11) - PLANS, ELEVATIONS & SETION Drawing · 11 Aug 2026
  • BRE - (PLOT 75) - PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • BUR - (PLOT 12-13, 46-47 & 49-50) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • BUR - (PLOTS 27-28) - PLANS, ELEVATIONS & SECTIONS Drawing · 11 Aug 2026
  • BUR - (PLOTS 24-26) - PLANS Drawing · 11 Aug 2026
  • BUR - (PLOTS 24-26) - ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • BRE - (PLOT 76) - PLANS, ELEVATIONS & SETION Drawing · 11 Aug 2026
  • BUCK - (PLOTS 19-21) - PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • WF 2B4P+ - (PLOTS 22-23 & 29-30) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • WF 2B4P+ - (PLOTS 54 & 58) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 2B3P & 3B4P CT - (PLOTS 36-37, 65-66, 67-68, 80-81 & 84-85) PLANS, ELEVATIONS & Drawing · 11 Aug 2026
  • (PLOTS 59-60 & 73-74) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 2B3P - (PLOTS 61-62, 71-72 & 82-83) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 2B3P - (PLOTS 77-79) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 1B2P - (PLOTS 31-32) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 1B2P - (PLOTS 33-35) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • 1B2P - (PLOTS 55-57) PLANS, ELEVATIONS & SECTION Drawing · 11 Aug 2026
  • SINGLE GARAGE (PLOTS 16, 17, 18, 41, 51, 52, 75 & 76) - PLANS, ELEVATIONS & SECT Drawing · 11 Aug 2026
  • DESIGN AND ACCESS STATEMENT (FULL BOOK) Report · 11 Aug 2026
  • CIL FORM 1 CIL Form · 11 Aug 2026
  • COVERING LETTER Applicant/Agent Correspondence · 11 Aug 2026
  • GROUND LEVEL TREE ASSESSMENT AND BAT ACTIVITY (INTERIM) SURVEY REPORT Report · 11 Aug 2026
  • BIODIVERSITY NET GAIN ASSESSMENT Report · 11 Aug 2026
  • GREAT CRESTED NEWT SURVEY REPORT Report · 11 Aug 2026
  • BREEDING BIRD SURVEY INTERIM REPORT Report · 11 Aug 2026
  • SUSTAINABILITY & ENERGY STATEMENT Report · 11 Aug 2026
  • HEALTH IMPACT ASSESSMENT Report · 11 Aug 2026
  • MASTERPLAN Drawing · 11 Aug 2026
  • SHEET 1 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 2 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 3 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 4 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 5 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 6 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 7 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 8 (SOFT LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 1 (HARD LANDSCAPE PROPOSAL) Drawing · 11 Aug 2026
  • SHEET 2 (HARD LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 3 (HARD LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 4 (HARD LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 5 (HARD LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 6 (HARD LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • SHEET 7 (HARD LANDSCAPE PROPOSALS) Drawing · 11 Aug 2026
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT Report · 11 Aug 2026
  • SOFT LANDSCAPE MANAGEMENT & MAINTENANCE PLAN Report · 11 Aug 2026
  • SOFT LANDSCAPE SPECIFICATION Report · 11 Aug 2026
  • PLANNING STATEMENT Report · 11 Aug 2026
  • WASTE MINIMISATION STATEMENT Report · 11 Aug 2026
  • AFFORDABLE HOUSING STATEMENT Report · 11 Aug 2026
  • TRANSPORT ASSESSMENT PART 1 Report · 11 Aug 2026
  • TRANSPORT ASSESSMENT PART 2 Report · 11 Aug 2026
  • FRAMEWORK TRAVEL PLAN Report · 11 Aug 2026
  • BIODIVERSITY METRIC CALCULATION TOOL BNG Metric · 11 Aug 2026
  • ARBORICULTURAL IMPACT ASSESSMENT & METHOD STATEMENT (INCLUDING TREE SURVEY SCHED Report · 11 Aug 2026
  • 3D VIEW 1 Photograph · 11 Aug 2026
  • 3D VIEW 3 Photograph · 11 Aug 2026
  • 3D VIEW 4 Photograph · 11 Aug 2026
  • 3D VIEW 2 Photograph · 11 Aug 2026
  • 3D VIEW 5 Photograph · 11 Aug 2026
  • 3D VIEW 6 Photograph · 11 Aug 2026
  • 3D VIEW 7 Photograph · 11 Aug 2026
  • 3D VIEW 8 Photograph · 11 Aug 2026
  • 3D VIEW 9 Photograph · 11 Aug 2026
  • 3D VIEW 10 Photograph · 11 Aug 2026
  • 3D VIEW 11 Photograph · 11 Aug 2026
  • 3D VIEW 12 Photograph · 11 Aug 2026
  • 3D VIEW 14 Photograph · 11 Aug 2026
  • 3D VIEW 15 Photograph · 11 Aug 2026
  • 3D VIEW 16 Photograph · 11 Aug 2026
  • 3D VIEW 17 Photograph · 11 Aug 2026
  • 3D VIEW 13 Photograph · 11 Aug 2026
  • ECOLOGICAL IMPACT ASSESSMENT (INTERIM) Report · 11 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Cotswold for determination, against a statutory target of eight weeks. Over the last year Cotswold decided full applications in a median of 75 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Cotswold

  • 26/02507/FUL Granted

    Millbrook House Donnington Road Broadwell Moreton-In-Marsh Gloucestershire GL56 0TN

    Erection of a detached garage

    Received 18 Aug, published by the council 21 Aug 2026 Full applications
  • 26/02434/FUL Withdrawn

    The Hitchens Farm House The Hitchins Farm Temple Guiting Cheltenham Gloucestershire GL54 5SG

    Erection of two storey side extension, first floor rear extension, orangery, basement and gated entrance to drive with associated works

    Received 12 Aug, published by the council 21 Aug 2026 Full applications
  • 26/00163/FUL Granted

    The Cedars Ivy House Lane Mickleton Chipping Campden Gloucestershire GL55 6SL

    Removal of existing link building. Construction of new link, and conversion of roof space above former barn into en-suite and dressing room, and conversion of outbuilding into office and guest room

    Received 19 Jan, published by the council 21 Jul 2026 Full applications
  • 26/01876/FUL Granted

    Hartwells High Street Bourton-on-the-Water Cheltenham Gloucestershire GL54 2AJ

    Refurbishment of ground floor retail area. Demolition of side access covered area and side door. Change of use of 1st and 2nd floors into residential units with internal alterations and refurbishments. New external enclosed access staircase to first floor residential lobby and associated works

    Received 17 Jun, published by the council 21 Jul 2026 Full applications
  • 26/02597/FUL Granted

    2 Southside Shipton Moyne Tetbury Gloucestershire GL8 8PP

    Variation of condition 2 (Approved plans) of permission 23/03840/FUL - Two storey side extension, rear single storey extension, porch extension and demolition of conservatory to allow for amendment to rear flat roof extension

    Received 26 Aug, published by the council 4 Sep 2026 Full applications