Planning application
9 Bridewell Place London EC4V 6AW
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of Material Sample Pack and Roof Level Proposed Plan pursuant to condition 17 of planning permission 22/01070/FULMAJ dated 05.01.2024.
As published by the council, reference 26/01279/MDC
Application record
- Reference
- 26/01279/MDC
- Status
- Under Consideration
- Received
- 15 Sep 2026
- Validated
- 15 Sep 2026
- Ward
- Castle Baynard
- Decision by
- Delegated
- Postcode
- EC4V 6AW
Site history
Applications at this address on the City of London register
This site has had 8 applications since 2025: 4 approved, 0 refused.
-
26/01030/MDC Awaiting decision
9 Bridewell Place London EC4V 6AW
Submission of SuDS Operations and Maintenance Regime pursuant to discharge of condition 15 of planning permission 22/01070/FULMAJ dated 05.01.2024.
-
26/00132/MDC Awaiting decision
9 Bridewell Place London EC4V 6AW
Submission of details of Climate Change Resilience Sustainability Statement (CCRSS) pursuant to condition 11 of planning permission 22/01070/FULMAJ dated 05.01.2024.
-
26/00086/MDC Granted
9 Bridewell Place London EC4V 6AW
Submission of an update to the approved detailed Circular Economy Statement to reaffirm the proposed strategy, to include a site waste management plan pursuant to condition 4 (part B) of planning permission 22/01070/FULMAJ dated 05/01/2024.
-
26/00084/MDC Granted
9 Bridewell Place London EC4V 6AW
Submission of (a) particulars and samples of the materials to be used on all external faces of the buildings including external ground and upper level surfaces; (b) details of all elevations of the buildings including details of typical bays, the fenestration and entrances and upper floor extensions; (c) details of all plant enclosure (to include climbing plant details); (d) details of the design of UK Power Network service area; (e) details of all ground floor elevations; (f) details of all entrances; (g) details of all windows and fenestration; (h) details of parapets and roof junctions; (i) Mock up panels of brickwork and limestone; (j) details of all soffits, hand rails and balustrades; (k) details of the integration of window cleaning equipment and the garaging thereof, plant, flues, fire escapes and other excrescences at roof level; (l) details of plant, ductwork, ventilation and air-conditioning; (m) details of all ground level surfaces including materials to be used; (n) details of the courtyard; (o) details of courtyard boundary treatment adjacent to neighbouring ground floor windows; (p) details of lighting; (q) details of all signage to be used on the building; (r) details of interfaces with surrounding buildings; (s) details of any extrusions at roof level; and (t) details of the arrangements for the provision of refuse storage and collection facilities within the curtilage of the site to serve the development pursuant to condition 20 of planning permission 22/01070/FULMAJ dated 05/01/2024.
-
26/00085/MDC Awaiting decision
9 Bridewell Place London EC4V 6AW
Submission of an update to the approved detailed Whole Life-Cycle Carbon assessment pursuant to condition 10 of planning permission 22/01070/FULMAJ dated 05/01/2024.
-
26/00007/NMA Granted
9 Bridewell Place London EC4V 6AW
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01070/FULMAJ dated 05 January 2024 to: (i) revise column design, (ii) revise upper-level cladding specification, (iii) accommodate equal access through providing a ground floor ramp
-
25/00382/MDC Granted
9 Bridewell Place London EC4V 6AW
Submission of a Fire and Emergency Escape Strategy for all building users (including people with disabilities) with details of the means of escape, areas of refuge and fire evacuation lifts and stairs and fire service access pursuant to condition 3 of planning permission 22/01070/FULMAJ dated 05/01/2024.
Timeline
Dates from the published record
-
15 Sep 2026
Received by City of London
-
24 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 84 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 22/01070/FULMAJ (Decided)
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,601 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordMadison Projectco 9 Limited Applicant, registered in London
Active · incorporated 2023 · London
4 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
- ROOF LEVEL PROPOSED PLAN
- APPLICATIONFORMREDACTED
- LIVING GREEN WALL ROOFTOP BRIDEWELL PLACE LONDON SAMPLES
- 9 BRIDEWELL PLACE CONDITION 17 - GREEN WALL COVER LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 84 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
9 Bridewell Place London EC4V 6AW
Submission of an update to the approved detailed Circular Economy Statement to reaffirm the proposed strategy, to include a site waste management plan pursuant to condition 4 (part B) of planning permission 22/01070/FULMAJ dated 05/01/2024.
Granted 5 docs -
9 Bridewell Place London EC4V 6AW
Submission of (a) particulars and samples of the materials to be used on all external faces of the buildings including external ground and upper level surfaces; (b) details of all elevations of the buildings including details of typical bays, the fenestration and entrances and upper floor extensions; (c) details of all plant enclosure (to include climbing plant details); (d) details of the design of UK Power Network service area; (e) details of all ground floor elevations; (f) details of all entrances; (g) details of all windows and fenestration; (h) details of parapets and roof junctions; (i) Mock up panels of brickwork and limestone; (j) details of all soffits, hand rails and balustrades; (k) details of the integration of window cleaning equipment and the garaging thereof, plant, flues, fire escapes and other excrescences at roof level; (l) details of plant, ductwork, ventilation and air-conditioning; (m) details of all ground level surfaces including materials to be used; (n) details of the courtyard; (o) details of courtyard boundary treatment adjacent to neighbouring ground floor windows; (p) details of lighting; (q) details of all signage to be used on the building; (r) details of interfaces with surrounding buildings; (s) details of any extrusions at roof level; and (t) details of the arrangements for the provision of refuse storage and collection facilities within the curtilage of the site to serve the development pursuant to condition 20 of planning permission 22/01070/FULMAJ dated 05/01/2024.
Granted Extension Windows or glazing 3 docs -
9 Bridewell Place London EC4V 6AW
99% historically approved · decision due ~14 Sep
Submission of SuDS Operations and Maintenance Regime pursuant to discharge of condition 15 of planning permission 22/01070/FULMAJ dated 05.01.2024.
Awaiting decision 3 docs -
9 Bridewell Place London EC4V 6AW
Submission of a Fire and Emergency Escape Strategy for all building users (including people with disabilities) with details of the means of escape, areas of refuge and fire evacuation lifts and stairs and fire service access pursuant to condition 3 of planning permission 22/01070/FULMAJ dated 05/01/2024.
Granted 27 docs -
9 Bridewell Place London EC4V 6AW
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01070/FULMAJ dated 05 January 2024 to: (i) revise column design, (ii) revise upper-level cladding specification, (iii) accommodate equal access through providing a ground floor ramp
Granted Amendments 12 docs -
9 Bridewell Place London EC4V 6AW
100% historically approved · decision due ~16 Mar
Submission of an update to the approved detailed Whole Life-Cycle Carbon assessment pursuant to condition 10 of planning permission 22/01070/FULMAJ dated 05/01/2024.
Awaiting decision Conditions 4 docs