Planning application
9 Bridewell Place London EC4V 6AW
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of details of Climate Change Resilience Sustainability Statement (CCRSS) pursuant to condition 11 of planning permission 22/01070/FULMAJ dated 05.01.2024.
As published by the council, reference 26/00132/MDC
Application record
- Reference
- 26/00132/MDC
- Type
- Submission of details (Planning)
- Status
- Under Consideration
- Received
- 29 Jan 2026
- Validated
- 29 Jan 2026
- Ward
- Castle Baynard
- Decision by
- Delegated
- Postcode
- EC4V 6AW
Site history
Applications at this address on the City of London register
This site has had 8 applications since 2025: 4 approved, 0 refused.
-
26/01279/MDC Awaiting decision
9 Bridewell Place London EC4V 6AW
Submission of Material Sample Pack and Roof Level Proposed Plan pursuant to condition 17 of planning permission 22/01070/FULMAJ dated 05.01.2024.
-
26/01030/MDC Awaiting decision
9 Bridewell Place London EC4V 6AW
Submission of SuDS Operations and Maintenance Regime pursuant to discharge of condition 15 of planning permission 22/01070/FULMAJ dated 05.01.2024.
-
26/00086/MDC Granted
9 Bridewell Place London EC4V 6AW
Submission of an update to the approved detailed Circular Economy Statement to reaffirm the proposed strategy, to include a site waste management plan pursuant to condition 4 (part B) of planning permission 22/01070/FULMAJ dated 05/01/2024.
-
26/00084/MDC Granted
9 Bridewell Place London EC4V 6AW
Submission of (a) particulars and samples of the materials to be used on all external faces of the buildings including external ground and upper level surfaces; (b) details of all elevations of the buildings including details of typical bays, the fenestration and entrances and upper floor extensions; (c) details of all plant enclosure (to include climbing plant details); (d) details of the design of UK Power Network service area; (e) details of all ground floor elevations; (f) details of all entrances; (g) details of all windows and fenestration; (h) details of parapets and roof junctions; (i) Mock up panels of brickwork and limestone; (j) details of all soffits, hand rails and balustrades; (k) details of the integration of window cleaning equipment and the garaging thereof, plant, flues, fire escapes and other excrescences at roof level; (l) details of plant, ductwork, ventilation and air-conditioning; (m) details of all ground level surfaces including materials to be used; (n) details of the courtyard; (o) details of courtyard boundary treatment adjacent to neighbouring ground floor windows; (p) details of lighting; (q) details of all signage to be used on the building; (r) details of interfaces with surrounding buildings; (s) details of any extrusions at roof level; and (t) details of the arrangements for the provision of refuse storage and collection facilities within the curtilage of the site to serve the development pursuant to condition 20 of planning permission 22/01070/FULMAJ dated 05/01/2024.
-
26/00085/MDC Awaiting decision
9 Bridewell Place London EC4V 6AW
Submission of an update to the approved detailed Whole Life-Cycle Carbon assessment pursuant to condition 10 of planning permission 22/01070/FULMAJ dated 05/01/2024.
-
26/00007/NMA Granted
9 Bridewell Place London EC4V 6AW
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01070/FULMAJ dated 05 January 2024 to: (i) revise column design, (ii) revise upper-level cladding specification, (iii) accommodate equal access through providing a ground floor ramp
-
25/00382/MDC Granted
9 Bridewell Place London EC4V 6AW
Submission of a Fire and Emergency Escape Strategy for all building users (including people with disabilities) with details of the means of escape, areas of refuge and fire evacuation lifts and stairs and fire service access pursuant to condition 3 of planning permission 22/01070/FULMAJ dated 05/01/2024.
Timeline
Dates from the published record
-
29 Jan 2026
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 85 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 22/01070/FULMAJ (Decided)
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,625 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordMadison Projectco 9 Limited Applicant, registered in London
Active · incorporated 2023 · London
4 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
- CRSS
- APPLICATIONFORMREDACTED
- 9 BRIDEWELL PLACE - CLIMATE CHANGE RESILIENCE SUSTAINABILITY STATEMENT
- 9 BRIDEWELL PLACE CONDITION 11 - CCRSS COVER LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided condition discharge and variation applications in a median of 83 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
9 Bridewell Place London EC4V 6AW
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01070/FULMAJ dated 05 January 2024 to: (i) revise column design, (ii) revise upper-level cladding specification, (iii) accommodate equal access through providing a ground floor ramp
Granted Amendments 12 docs -
9 Bridewell Place London EC4V 6AW
100% historically approved · decision due ~16 Mar
Submission of an update to the approved detailed Whole Life-Cycle Carbon assessment pursuant to condition 10 of planning permission 22/01070/FULMAJ dated 05/01/2024.
Awaiting decision Conditions 4 docs -
9 Bridewell Place London EC4V 6AW
99% historically approved · decision due ~10 Nov
Submission of Material Sample Pack and Roof Level Proposed Plan pursuant to condition 17 of planning permission 22/01070/FULMAJ dated 05.01.2024.
Awaiting decision 4 docs -
9 Bridewell Place London EC4V 6AW
Submission of an update to the approved detailed Circular Economy Statement to reaffirm the proposed strategy, to include a site waste management plan pursuant to condition 4 (part B) of planning permission 22/01070/FULMAJ dated 05/01/2024.
Granted 5 docs -
9 Bridewell Place London EC4V 6AW
Submission of (a) particulars and samples of the materials to be used on all external faces of the buildings including external ground and upper level surfaces; (b) details of all elevations of the buildings including details of typical bays, the fenestration and entrances and upper floor extensions; (c) details of all plant enclosure (to include climbing plant details); (d) details of the design of UK Power Network service area; (e) details of all ground floor elevations; (f) details of all entrances; (g) details of all windows and fenestration; (h) details of parapets and roof junctions; (i) Mock up panels of brickwork and limestone; (j) details of all soffits, hand rails and balustrades; (k) details of the integration of window cleaning equipment and the garaging thereof, plant, flues, fire escapes and other excrescences at roof level; (l) details of plant, ductwork, ventilation and air-conditioning; (m) details of all ground level surfaces including materials to be used; (n) details of the courtyard; (o) details of courtyard boundary treatment adjacent to neighbouring ground floor windows; (p) details of lighting; (q) details of all signage to be used on the building; (r) details of interfaces with surrounding buildings; (s) details of any extrusions at roof level; and (t) details of the arrangements for the provision of refuse storage and collection facilities within the curtilage of the site to serve the development pursuant to condition 20 of planning permission 22/01070/FULMAJ dated 05/01/2024.
Granted Extension Windows or glazing 3 docs -
9 Bridewell Place London EC4V 6AW
99% historically approved · decision due ~14 Sep
Submission of SuDS Operations and Maintenance Regime pursuant to discharge of condition 15 of planning permission 22/01070/FULMAJ dated 05.01.2024.
Awaiting decision 3 docs
Other condition discharge and variation applications
In City of London
-
26/01219/MDC Granted
Tower 42 International Financial Centre 25 Old Broad Street London EC2N 1HQ
Submission of details of the materials to be used on external faces pursuant to discharge of Condition 2(a) of planning permission 24/01203/FULL dated 02.06.2025.
-
26/01308/MDC Awaiting decision
1 Poultry London EC2R 8EJ
Submission of Protection of Historic Fabric report and Heritage Fabric Protection Register pursuant to condition 5 of planning permission 25/01714/LBC dated 07.08.2026.
-
26/01244/MDC Awaiting decision
60 Queen Victoria Street London EC4N 4TZ
Submission of landscaping details and a Landscape and Ecology Management Plan pursuant to discharge of Condition 5, 17(d), 18(d) and 33 planning permission 23/01422/FULMAJ dated 11.04.2025.
-
26/01248/MDC Awaiting decision
20 Giltspur Street London EC1A 9DD
Submission of Security Management Plan pursuant to Condition 34 of planning permission 22/00867/FULMAJ dated 14.09.2023.
-
26/01249/MDC Awaiting decision
6 - 11 Crescent London EC3N 2LY
Submission of details Access Management Plan pursuant to condition 16 of Planning Permission 24/00776/FULL dated 11.07.2025.