Skip to content
PlanIndex Get alerts
Menu

Planning application

Paternoster Lodge Paternoster Square London EC4M 7DX

Granted City of London 24/00826/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Temporary installation of a London mural art installation on the front facade of the building, to be installed on 25th September 2024 and taken down on or before 30th November 2024.

As published by the council, reference 24/00826/FULL

Application record

Reference
24/00826/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
1 Aug 2024
Validated
2 Aug 2024
Decided
27 Sep 2024
Ward
Bread Street
Decision by
Delegated Decision
Postcode
EC4M 7DX

Timeline

Dates from the published record

  1. 1 Aug 2024

    Received by City of London

  2. 2 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 27 Sep 2024

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Offices Chapter House St Paul's Churchyard London EC4M 8AD

    26/01083/FULL Submitted 29 Jul 2026 17m away

    99% historically approved · decision due ~2 Oct

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft)

    Awaiting decision Full applications Extension Demolition 28 docs
  • Chapter House St Paul's Churchyard London EC4M 8AD

    26/01084/LBC Submitted 29 Jul 2026 17m away

    100% historically approved · decision due ~2 Oct

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft)

    Awaiting decision Heritage and listed buildings Extension Demolition 28 docs
  • 1 Paternoster Square London EC4M 7DX

    21/00513/FULL Submitted 15 Jun 2021 52m away

    Temporary placement of 7 tables, 14 chairs and 4 planters in an area contained within the building line in connection with the existing ground floor unit for a 12month period.

    Granted Full applications 7 docs
  • Warwick Court 5 Paternoster Square London EC4M 7DX

    21/00328/NMA Submitted 26 Apr 2021 55m away

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 19/01362/FULL dated 19.05.2020 to allow for amendment to planting and louvres at level 04 terrace; amendments to layout, plant screening and stair enclosure door at level 08 terrace including addition of a servery within existing chiller compound; and minor internal layout changes at lower ground, ground and first floor levels.

    Granted Amendments 19 docs
  • Warwick Court 5 Paternoster Square London EC4M 7DX

    25/01179/FULL Submitted 27 Aug 2025 55m away

    Installation of louvres associated with the mechanical ventilation system, to the ground floor facade of 5 Paternoster Square.

    Granted Full applications 18 docs
  • Warwick Court 5 Paternoster Square London EC4M 7DX

    26/00162/MDC Submitted 2 Feb 2026 55m away

    Submission of details of post installation acoustic testing and details of anti-vibration measures pursuant to condition 2 (b) and condition 3 of Planning permission 25/01179/FULL dated 22.10.2025.

    Granted Conditions 5 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications