Skip to content
PlanIndex Get alerts
Menu

Planning application

1 - 3 St Paul's Churchyard London EC4M 8AP

Awaiting decision City of London 26/00950/MDC Submission of details (Planning)

Relates to 25/01124/FULL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of a Scheme of Protective Works and Construction Logistics Plan pursuant to discharge of Conditions 2 and 3 of planning permission 25/01124/FULL dated 22.12.2025.

As published by the council, reference 26/00950/MDC

Application record

Reference
26/00950/MDC
Type
Submission of details (Planning)
Status
Under Consideration
Received
2 Jul 2026
Validated
2 Jul 2026
Ward
Bread Street
Decision by
Delegated
Postcode
EC4M 8AP

Site history

Applications at this address on the City of London register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • 26/00949/NMA Granted

    1 - 3 St Paul's Churchyard London EC4M 8AP

    Non-Material Amendment to planning permission ref.25/01124/FULL for amendments to Condition 22 (Approved Documents) to accommodate design changes NAMELY for (i) amendments to fifth floor balustrade, windows and mullions (ii) amendments to sixth floor louvres, doors and cladding and, (iii) amendments to ground floor facade.

    Decided 11 Sep 2026 Amendments
  • 25/01124/FULL Granted

    1 - 3 St Paul's Churchyard London EC4M 8AP

    Alterations to the existing building, including: (i) the upgrading of windows; (ii) alterations to the building entrance; (iii) replacement of orangery roof lights with lantern structure; (iv) alterations to fifth floor terrace; (v) reconfiguration of the sixth-floor terrace, including the relocation of plant; (vi) alterations to the building facades; (vii) and other associated minor works.

    Decided 22 Dec 2025 Full applications

Timeline

Dates from the published record

  1. 2 Jul 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 78 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 25/01124/FULL Granted

    1 - 3 St Paul's Churchyard London EC4M 8AP

    Alterations to the existing building, including: (i) the upgrading of windows; (ii) alterations to the building entrance; (iii) replacement of orangery roof lights with lantern structure; (iv) alterations to fifth floor terrace; (v) reconfiguration of the sixth-floor terrace, including the relocation of plant; (vi) alterations to the building facades; (vii) and other associated minor works.

    Decided 22 Dec 2025 Full applications

Who's behind it

Company information only, from the register and Companies House

Avison Young Limited Agent

1,358 applications on PlanIndex · across 174 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

  • APPLICATIONFORMREDACTED Application Form · 02 Jul 2026
  • NVDP_1SPCY_V1 Other · 02 Jul 2026
  • C-403_1-3 ST PAULS CHURCHYARD_CLP_V2 (COMPRESSED) Other · 02 Jul 2026
  • SOPW_1SPCY_V2_PART1 Other · 02 Jul 2026
  • SOPW_1SPCY_V2_PART2 Other · 02 Jul 2026
  • SOPW_1SPCY_V2_PART3 Other · 02 Jul 2026
  • COVER LETTER - CONDITION 2 AND 3 Cover Letter · 02 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided condition discharge and variation applications in a median of 83 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 1 - 3 St Paul's Churchyard London EC4M 8AP

    25/01124/FULL Submitted 18 Aug 2025 0m away

    Alterations to the existing building, including: (i) the upgrading of windows; (ii) alterations to the building entrance; (iii) replacement of orangery roof lights with lantern structure; (iv) alterations to fifth floor terrace; (v) reconfiguration of the sixth-floor terrace, including the relocation of plant; (vi) alterations to the building facades; (vii) and other associated minor works.

    Granted Full applications Extension Loft or dormer +1 74 docs
  • 1 St Paul's Churchyard London EC4M 8AP

    26/01172/MDC Submitted 14 Aug 2026 17m away

    100% historically approved · decision due ~9 Oct

    Submission of details of Lighting Strategy and Street Lighting pursuant to conditions 6 and 8 of Planning Permission 25/01124/FULL dated 22.12.2025.

    Awaiting decision 2 docs
  • 1 - 3 St Paul's Churchyard London EC4M 8AP

    26/00949/NMA Submitted 2 Jul 2026 17m away

    Non-Material Amendment to planning permission ref.25/01124/FULL for amendments to Condition 22 (Approved Documents) to accommodate design changes NAMELY for (i) amendments to fifth floor balustrade, windows and mullions (ii) amendments to sixth floor louvres, doors and cladding and, (iii) amendments to ground floor facade.

    Granted Amendments Windows or glazing 14 docs
  • The Old Deanery Dean's Court London EC4V 5AA

    19/01185/LDC Submitted 12 Nov 2019 27m away

    Submission of details of replacement of gates to the north end of the front boundary wall to match existing details re-using existing metal components pursuant condition 4 (c) of the listed building consent dated 13.12.2018 (17/01280/FULL).

    Granted Lawful development 11 docs
    Small domestic
  • The Old Deanery Dean's Court London EC4V 5AA

    19/01173/TCA Submitted 7 Nov 2019 27m away

    Pruning works to London Plane tree (Platanus x hispanica).

    Granted Trees 10 docs
  • The Old Deanery Dean's Court London EC4V 5AA

    25/01322/LBC Submitted 26 Sep 2025 27m away

    Gate trimming works to enable vehicle access at The Old Deanery.

    Granted Heritage and listed buildings 19 docs

In City of London

  • 26/00641/MDC Granted

    Development Site Salisbury Square London

    Submission of Construction Local Procurement Monitoring pursuant to the partial discharge of Condition 2(B) and Court Building Details pursuant to the partial discharge of Condition 37 parts (c), (e), (f), (i), (j) and (l) of Planning Permission 20/00997/FULEIA dated 30.07.2021.

    30 Apr 2026 Conditions
  • 25/01807/MDC Granted

    47-50 Mark Lane London EC3R 5AS

    Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 7 of planning permission 24/01044/FULL dated 25/03/2025.

    24 Dec 2025 Conditions
  • 26/00622/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of external facing materials pursuant to part discharge of Parts E and K and full discharge of Parts F and H of Condition 21 of planning permission 26/00244/FULL dated 24th June 2026

    28 Apr 2026 Conditions
  • 26/00048/MDC Granted

    Cripplegate House 1 Golden Lane London EC1Y 0RR

    Submission of details of the position and size of the green/blue roof(s), the type of planting and a substantial contribution of the green/blue roof(s) to biodiversity and rainwater attenuation pursuant to condition 11 of planning permission 22/00202/FULMAJ dated 23/01/2023.

    14 Jan 2026 Conditions
  • 26/00138/MDC Granted

    Cripplegate House 1 Golden Lane London EC1Y 0RR

    Submission of details generator technical report pursuant to condition 20 of Planning Permission 22/00202/FULMAJ dated 23.01.2023.

    30 Jan 2026 Conditions