Skip to content
PlanIndex Get alerts
Menu

Planning application

25 Hosier Lane London EC1A 9LQ

Granted City of London 24/01331/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to the Hosier Lane facade at ground floor level and to the rooftop plant enclosure including the installation of new plant and removal of redundant plant.

As published by the council, reference 24/01331/FULL

Application record

Reference
24/01331/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
18 Dec 2024
Validated
18 Dec 2024
Decided
4 Mar 2025
Ward
Farringdon Without
Decision by
Delegated Decision
Postcode
EC1A 9LQ

Timeline

Dates from the published record

  1. 18 Dec 2024

    Received by City of London

  2. 4 Mar 2025

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

89 applications on PlanIndex · across 15 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25 Hosier Lane London EC1A 9LQ

    26/00487/NMA Submitted 2 Apr 2026 0m away

    Non-Material Amendment under Section 96a of the Town and Country Planning Act (1990) (as amended) to planning permission Ref. 24/01331/FULL dated 04/03/2025 to relocate louvre panel on roof level plant enclosure.

    Granted Amendments 9 docs
  • 25 Hosier Lane London EC1A 9LQ

    26/00485/MDC Submitted 2 Apr 2026 0m away

    Submission of details of landscaping package including layout plan, indicating locations, extent, geometry etc pursuant to condition 8 of Planning permission 24/01331/FULL dated 04.03.2025.

    Granted Conditions 6 docs
  • 25 Hosier Lane London EC1A 9LQ

    26/01112/MDC Submitted 3 Aug 2026 0m away

    99% historically approved · decision due ~28 Sep

    Submission of MEP Roof Plant Vibration Isolation pursuant to discharge of condition 7 of planning permission 24/01331/FULL dated 04.03.2025.

    Decided 3 docs
  • 2 Hosier Lane London EC1A 9HB

    26/00786/MDC Submitted 29 May 2026 17m away

    99% historically approved · decision due ~24 Jul

    Submission of details of Scheme of Protective Works, Noise, dust and vibration monitoring equipment, Non-Road Mobile Machinery Register and Demolition and Construction Logistic Plans pursuant to conditions 7, 8, 16 and 20 of Planning Permission 25/01085/FULL dated 13.04.2026.

    Awaiting decision Demolition 6 docs
  • 2 Hosier Lane London EC1A 9HB

    26/00878/MDC Submitted 18 Jun 2026 17m away

    99% historically approved · decision due ~13 Aug

    Submission of Site Condition Survey pursuant to discharge of condition 18 of planning permission 25/01085/FULL dated 13.04.2026.

    Decided 4 docs
  • 2 Hosier Lane London EC1A 9HB

    26/01121/PODC Submitted 8 Jul 2026 17m away

    99% historically approved · decision due ~1 Oct

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 6.1 of the Section 106 Agreement dated 13 April 2026 (Planning Application Reference 25/01085/FULL).

    Awaiting decision 4 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications