Proposal
Change of use of the existing office and drinking establishment to provide tourist hotel and hostel accommodation (sui generis), including a proportion of private and shared rooms and the retention of an active ground-floor use, with a two-storey rooftop extension, refurbishment and all associated works.
As published by the council, reference 26/00792/FULL
Application record
- Reference
- 26/00792/FULL
- Category
- Full applications
- Status
- Under Consideration
- Received
- 1 Jun 2026
- Validated
- 29 Jun 2026
- Ward
- Aldgate
- Decision by
- Delegated
- Postcode
- EC3N 3AE
Site history
Applications at this address on the City of London register
This site has had 2 applications since 2024: 1 approved, 0 refused.
-
24/00939/FULL Granted
5 Lloyd's Avenue London EC3N 3AE
Change of use from a sandwich/coffee bar (Class E(a)) use to a drinking establishment with a substantial food offer (Sui Generis) use [Retrospective].
Timeline
Dates from the published record
-
1 Jun 2026
Received by City of London
-
29 Jun 2026
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 78 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Avison Young Limited Agent
1,358 applications on PlanIndex · across 174 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordFirethorn Developments (VTC) Limited Applicant, a developer registered in London
Active · incorporated 2025 · London
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
175 documents on file for this application
- EXISTING BASEMENT LEVEL 01
- A-100 100 REV P4
- EXISTING BASEMENT LEVEL - 01
- PROPOSED GROUND LEVEL
- PROPOSED LEVEL 08
- PROPOSED LEVEL 07
- PROPOSED BASEMENT LEVEL - 02
- PROPOSED SITE PLAN
- DEMOLITION SECTION BB
- DEMOLITION SOUTH EAST ELEVATION
- DEMOLITION SOUTH WEST ELEVATION
- DEMOLITION ROOF LEVEL
- DEMOLITION LEVEL 06
- DEMOLITION LEVEL 02 TO LEVEL 05
- DEMOLITION LEVEL 01
- DEMOLITION GROUND LEVEL
- DEMOLITION BASEMENT LEVEL - 01
- DEMOLITION BASEMENT LEVEL - 02
- EXISTING SECTION BB
- EXISTING SECTION AA
- EXISTING NORTH EAST ELEVATION
- EXISTING SOUTH EAST ELEVATION
- EXISTING SOUTH WEST ELEVATION
- EXISTING LEVEL 06
- EXISTING LEVEL 02 TO LEVEL 05
- EXISTING LEVEL 01
- EXISTING GROUND LEVEL
- EXISTING BASEMENT LEVEL - 01
- EXISTING BASEMENT LEVEL - 02
- EXISTING SITE PLAN P1
- SITE LOCATION PLAN P1
- BIODIVERSITY NET GAIN ASSESSMENT
- CHAPTER 1 TO 3 - INTRODUCTION, LOCATION AND CONTEXT, SITE AND EXISTING BUILDING
- CHAPTER 6 - CONSULTATION PROCESS
- CHAPTER 7 & 8 - DESIGN DEVELOPMENT AND PROPOSAL
- CHAPTER 9 - VERIFIED TOWNSCAPE VIEWS
- CHAPTER 10 TO 15 - CONSULTANT REPORTS AND SUMMARY
- OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- (BUILT) HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- FACADE LIGHTING PLANNING REPORT
- ENVIRONMENTAL NOISE SURVEY AND PLANT NOISE IMPACT ASSESSMENT REPORT
- TRANSPORT STATEMENT
- OUTLINE DELIVERY AND SERVICING PLAN
- OPERATIONAL WASTE MANAGEMENT STRATEGY
- OUTLINE SITE WASTE MANAGEMENT PLAN
- TRAVEL PLAN
- PART 1 - OUTLINE CONSTRUCTION LOGISTICS PLAN
- PART 2 - OUTLINE CONSTRUCTION LOGISTICS PLAN
- STORM WATER STRATEGY AND MAINTENANCE PLAN
- SUSTAINABLE DRAINAGE STRATEGY DOCUMENT
- APPENDIX A GLA SPREADSHEET
- ENERGY STRATEGY REPORT
- BREEAM PRE- ASSESSMENT REPORT
- PART 1 - SUSTAINABILITY STATEMENT REPORT
- PART 2 - SUSTAINABILITY STATEMENT REPORT
- PART 3 - SUSTAINABILITY STATEMENT REPORT
- URBAN GREENING FACTOR REPORT
- ASSESSMENT OF FINANCIAL VIABILITY OF OFFICE USE
- WLCA ASSESSMENT TEMPLATE
- WHOLE LIFE CARBON ESTIMATE
- STATEMENT OF COMMUNITY INVOLVEMENT
- AIR QUALITY ASSESMENT
- PROPOSED SECTION BB
- PROPOSED SECTION AA
- PROPOSED BASEMENT LEVEL - 01
- DEMOLITION SECTION AA
- DEMOLITION NORTH EAST ELEVATION
- FIRE STATEMENT
- PROPOSED NORTH EAST ELEVATION
- PROPOSED SOUTH EAST ELEVATION
- PROPOSED SOUTH WEST ELEVATION
- PROPOSED ROOF LEVEL
- PROPOSED LEVEL 06
- PROPOSED LEVEL 04 TO LEVEL 05
- PROPOSED LEVEL 02 TO LEVEL 03
- PROPOSED LEVEL 01
- PROPOSED GROUND LEVEL
- EXISTING ROOF LEVEL
- PRELIMINARY ECOLOGICAL APPRAISAL
- STATUTORY METRIC
- PRE-DEMOLITION AUDIT
- CIRCULAR ECONOMY STATEMENT
- DAYLIGHT & SUNLIGHT REPORT
- CHAPTER 4 TO 5 - PROPOSED CHANGE OF USE, VISION AND HOTEL CONCEPT
- APPENDIX I - SCENARIO 1 APPRAISAL SUMMARY
- APPENDIX J - SCENARIO 2 APPRAISAL SUMMARY
- APPENDIX K - SCENARIO 3 APPRAISAL SUMMARY
- MARKETING UPDATE
- HOTEL MARKET OVERVIEW
- CIL FORM
- COMMENTS - THAMES WATER
- PLANNING STATEMENT
- COVER LETTER
- APPLICATION FORM
- OPERATIONAL MANAGEMENT PLAN
- CONFIRMATION OF SUFFICIENT CAPACITY
- REPRESENTATION - CITY OF LONDON CONSERVATION AREA ADVISORY COMMITTEE
- CONFIRMATION OF SUFFICIENT CAPACITY
- COMMENTS - THAMES WATER
- SUSTAINABLE DRAINAGE STRATEGY DOCUMENT
- DRAINAGE LAYOUT
- CARBON APPENDIX A GLA SPREADSHEET
- BNG STATUTORY METRIC
- PROPOSED SECTION BB P1
- SITE LOCATION PLAN P1
- EXISTING SITE PLAN P1
- EXISTING BASEMENT LEVEL -02 P2
- EXISTING GROUND LEVEL P2
- EXISTING LEVEL 01 P2
- EXISTING LEVEL 02 TO LEVEL 05 P2
- EXISTING ROOF LEVEL P2
- EXISTING SOUTH WEST ELEVATION P1
- EXISTING SOUTH EAST ELEVATION P1
- EXISTING NORTH EAST ELEVATION P1
- EXISTING SECTION AA P1
- EXISTING SECTION BB P1
- DEMOLITION BASEMENT LEVEL -02 P2
- DEMOLITION BASEMENT LEVEL -01 P2
- DEMOLITION GROUND LEVEL P2
- DEMOLITION LEVEL 01 P2
- DEMOLITION LEVEL 02 TO LEVEL 05 P2
- DEMOLITION LEVEL 06 P2
- DEMOLITION ROOF LEVEL P2
- DEMOLITION SOUTH WEST ELEVATION P2
- DEMOLITION SOUTH EAST ELEVATION P2
- DEMOLITION NORTH EAST ELEVATION P2
- DEMOLITION SECTION AA P1
- DEMOLITION SECTION BB P1
- PROPOSED SITE PLAN P2
- PROPOSED BASEMENT LEVEL -02 P2
- PROPOSED BASEMENT LEVEL -01 P2
- PROPOSED LEVEL 01 P2
- PROPOSED LEVEL 02 TO LEVEL 03 P2
- PROPOSED LEVEL 04 TO LEVEL 05 P2
- PROPOSED LEVEL 07 P2
- PROPOSED LEVEL 08 P2
- PROPOSED ROOF LEVEL P2
- PROPOSED SOUTH WEST ELEVATION P2
- PROPOSED SOUTH EAST ELEVATION P2
- PROPOSED NORTH EAST ELEVATION P2
- CEMP - MAY 2026
- CIRCULAR ECONOMY REPORT - MAY 2026_PART2
- CIRCULAR ECONOMY REPORT - MAY 2026_PART3
- CIRCULAR ECONOMY REPORT - MAY 2026_PART4
- DAYLIGHT SUNLIGHT REPORT - MAY 2026_PART1
- DAYLIGHT SUNLIGHT REPORT - MAY 2026_PART2
- DAYLIGHT SUNLIGHT REPORT - MAY 2026_PART3
- DELIVERY AND SERVICING PLAN - MAY 2026
- ENERGY STRATEGY REPORT - MAY 2026
- HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - MAY 2026
- HOTEL OPERATIONAL MANAGEMENT PLAN - MAY 2026
- OFFICE MARKETING UPDATE - MAY 2026
- OFFICE VIABILITY REPORT - MAY 2026
- OFFICE VIABILITY REPORT APPENDIX K - SCENARIO 3 APPRAISAL SUMMARY
- DAS CHAPTER 4 TO 5 - PROPOSED CHANGE OF USE VISION AND HOTEL CONCEPT
- EXISTING LEVEL 06 P2
- PROPOSED LEVEL 06 P2
- PROPOSED SECTION AA P1
- BNG REPORT-A - MAY 2026
- BREEAM PRE-ASSESSMENT REPORT - FEB 2026
- CARBON APPENDIX A GLA SPREADSHEET
- CIRCULAR ECONOMY REPORT - MAY 2026_PART1
- LIGHTING STRATEGY PLANNING REPORT - MAY 2026
- OFFICE VIABILITY REPORT APPENDIX I - SCENARIO 1 APPRAISAL SUMMARY
- OFFICE VIABILITY REPORT APPENDIX J - SCENARIO 2 APPRAISAL SUMMARY
- SUSTAINABILITY STATEMENT - MAY 2026_PART1
- SUSTAINABILITY STATEMENT - MAY 2026_PART2
- SUSTAINABILITY STATEMENT - MAY 2026_PART3
- SUSTAINABILITY STATEMENT - MAY 2026_PART4
- DAS CHAPTER 1 TO 3 - INTRODUCTION LOCATION AND CONTEXT SITE AND EXISTING BUILDIN
- DAS CHAPTER 6 - CONSULTATION PROCESS
- DAS CHAPTER 7 TO 8- DESIGN DEVELOPMENT AND PROPOSAL
- DAS CHAPTER 9 - VERIFIED TOWNSCAPE VIEWS
- DAS CHAPTER 10 TO 15 - CONSULTANT REPORTS AND SUMMARY
- WLCA_ASSESSMENT_TEMPLATE
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 121 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
5 Lloyd's Avenue London EC3N 3AE
Change of use from a sandwich/coffee bar (Class E(a)) use to a drinking establishment with a substantial food offer (Sui Generis) use [Retrospective].
Granted Full applications 11 docs -
Friary Court 65 Crutched Friars London EC3N 2AE
Submission of pre-demolition audit pursuant to condition 5 of planning permission 22/00882/FULMAJ dated 27/06/2023.
Granted Conditions Demolition 6 docs -
Friary Court 65 Crutched Friars London EC3N 2AE
Submission of details including plans and section elevations of any undersailing of the basement of the building under the public highway to ensure a minimum undersail depth of 1.2m from pavement level, pursuant to condition 72 of planning permission 22/00882/FULMAJ dated 27.06.2023, as amended under 24/00105/NMA dated 14.08.2024.
Granted Conditions 5 docs -
Friary Court 65 Crutched Friars London EC3N 2AE
100% historically approved · decision due ~10 Dec
Submission of details of the facade system confirming the detailed design in relation to reducing the operational and embodied carbon impact across all life-cycle stages that would result from the proposed facade system and materials, and the frequency of replacement cycles pursuant to condition 10 of planning permission 22/00882/FULMAJ dated 27/06/2023.
Awaiting decision Conditions 3 docs -
Friary Court 65 Crutched Friars London EC3N 2AE
100% historically approved · decision due ~11 Sep
Submission of drawings pursuant to discharge of Condition 29 of planning permission 22/00882/FULMAJ dated 27.06.2023.
Awaiting decision Conditions 5 docs -
Friary Court 65 Crutched Friars London EC3N 2AE
99% historically approved · decision due ~7 Sep
Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission 22/00882/FULMAJ dated 27 June 2023 to vary Condition 48 (Cycle Parking Facilities) to reduce the number of cycle parking spaces in line with documented utilisation by users of comparable PBSA buildings; vary Condition 70 (Museum Use Floorspace) to remove reference to the approved quantum of museum floorspace; and vary Condition 71 (Approved Drawings) to reflect: (i) internal amendments to the museum layout at Ground and First Floors; (ii) the replacement of museum floorspace at Level 2 with 33 additional PBSA rooms and increased amenity space; (iii) the installation of external plant and associated plant enclosure at Level 3, together with a freestanding frame to provide greening; and (iv) consequential amendments relating to the revised cycle parking provision and museum floorspace, alongside a Deed of Variation to the Section 106 Agreement to amend the definition of Museum Space, update the Museum Space plans to reflect the Section 73 amendments, and provide that the Deed of Variation come into effect upon implementation of the Section 73 permission.
Awaiting decision Full applications 54 docsMajor scheme
Other full applications
In City of London
-
26/01113/FULL Granted
Evermore 128 Queen Victoria Street London EC4V 4BJ
Removal of brise soleil to the northern elevation of the building.
-
26/00608/FULL Granted
150 Cheapside London EC2V 6ET
Alterations to the existing office building, including the installation of external shading, entrance reconfiguration and erection of rooftop pavilion at level 08 to existing roof terrace, with associated works.
-
26/00969/FULL Granted
26 Throgmorton Street And 123 Old Broad Street, London EC2N 2AN
Installation of brass cill covers to 7no. ground floor windows.
-
26/00410/FULL Granted
2 Wardrobe Place London EC4V 5AH
Works comprising: (i) Change of use of the from offices (Class E(g)(iii)) to a single dwelling for residential use (Class C3); (ii) installation of slim line double glazed units within existing window frames; (iii) replacement of front steps; replacement of windows with French doors at lower ground floor; (iv)and other associated works.
-
26/00994/FULL Granted
11 Leadenhall Street London EC3V 1LP
Alterations at roof level including the installation of a fixed vertical ladder, abseil posts, safety line systems and a maintenance walkway, together with the removal of existing access equipment and partial removal of louvre blades, and associated works.