Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Lloyd's Avenue London EC3N 3AE

Awaiting decision City of London 26/00792/FULL Full applications

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of the existing office and drinking establishment to provide tourist hotel and hostel accommodation (sui generis), including a proportion of private and shared rooms and the retention of an active ground-floor use, with a two-storey rooftop extension, refurbishment and all associated works.

As published by the council, reference 26/00792/FULL

Application record

Reference
26/00792/FULL
Category
Full applications
Status
Under Consideration
Received
1 Jun 2026
Validated
29 Jun 2026
Ward
Aldgate
Decision by
Delegated
Postcode
EC3N 3AE

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 24/00939/FULL Granted

    5 Lloyd's Avenue London EC3N 3AE

    Change of use from a sandwich/coffee bar (Class E(a)) use to a drinking establishment with a substantial food offer (Sui Generis) use [Retrospective].

    Decided 24 Oct 2024 Full applications

Timeline

Dates from the published record

  1. 1 Jun 2026

    Received by City of London

  2. 29 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 24 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

175 documents on file for this application

  • EXISTING BASEMENT LEVEL 01 Drawing · 01 Sep 2026
  • A-100 100 REV P4 Drawing · 01 Sep 2026
  • EXISTING BASEMENT LEVEL - 01 Drawing · 19 Aug 2026
  • PROPOSED GROUND LEVEL Drawing · 19 Aug 2026
  • PROPOSED LEVEL 08 Drawing · 12 Aug 2026
  • PROPOSED LEVEL 07 Drawing · 12 Aug 2026
  • PROPOSED BASEMENT LEVEL - 02 Drawing · 12 Aug 2026
  • PROPOSED SITE PLAN Site Plan · 12 Aug 2026
  • DEMOLITION SECTION BB Drawing · 12 Aug 2026
  • DEMOLITION SOUTH EAST ELEVATION Drawing · 12 Aug 2026
  • DEMOLITION SOUTH WEST ELEVATION Drawing · 12 Aug 2026
  • DEMOLITION ROOF LEVEL Drawing · 12 Aug 2026
  • DEMOLITION LEVEL 06 Drawing · 12 Aug 2026
  • DEMOLITION LEVEL 02 TO LEVEL 05 Drawing · 12 Aug 2026
  • DEMOLITION LEVEL 01 Drawing · 12 Aug 2026
  • DEMOLITION GROUND LEVEL Drawing · 12 Aug 2026
  • DEMOLITION BASEMENT LEVEL - 01 Drawing · 12 Aug 2026
  • DEMOLITION BASEMENT LEVEL - 02 Drawing · 12 Aug 2026
  • EXISTING SECTION BB Drawing · 12 Aug 2026
  • EXISTING SECTION AA Drawing · 12 Aug 2026
  • EXISTING NORTH EAST ELEVATION Drawing · 12 Aug 2026
  • EXISTING SOUTH EAST ELEVATION Drawing · 12 Aug 2026
  • EXISTING SOUTH WEST ELEVATION Drawing · 12 Aug 2026
  • EXISTING LEVEL 06 Drawing · 12 Aug 2026
  • EXISTING LEVEL 02 TO LEVEL 05 Drawing · 12 Aug 2026
  • EXISTING LEVEL 01 Drawing · 12 Aug 2026
  • EXISTING GROUND LEVEL Drawing · 12 Aug 2026
  • EXISTING BASEMENT LEVEL - 01 Drawing · 12 Aug 2026
  • EXISTING BASEMENT LEVEL - 02 Drawing · 12 Aug 2026
  • EXISTING SITE PLAN P1 Site Plan · 12 Aug 2026
  • SITE LOCATION PLAN P1 Site Plan · 12 Aug 2026
  • BIODIVERSITY NET GAIN ASSESSMENT Accompanying report · 12 Aug 2026
  • CHAPTER 1 TO 3 - INTRODUCTION, LOCATION AND CONTEXT, SITE AND EXISTING BUILDING Report - Design & Access Statement/Report · 12 Aug 2026
  • CHAPTER 6 - CONSULTATION PROCESS Report - Design & Access Statement/Report · 12 Aug 2026
  • CHAPTER 7 & 8 - DESIGN DEVELOPMENT AND PROPOSAL Report - Design & Access Statement/Report · 12 Aug 2026
  • CHAPTER 9 - VERIFIED TOWNSCAPE VIEWS Report - Design & Access Statement/Report · 12 Aug 2026
  • CHAPTER 10 TO 15 - CONSULTANT REPORTS AND SUMMARY Report - Design & Access Statement/Report · 12 Aug 2026
  • OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Accompanying report · 12 Aug 2026
  • (BUILT) HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 12 Aug 2026
  • FACADE LIGHTING PLANNING REPORT Accompanying report · 12 Aug 2026
  • ENVIRONMENTAL NOISE SURVEY AND PLANT NOISE IMPACT ASSESSMENT REPORT Report - Acoustic/Noise Report · 12 Aug 2026
  • TRANSPORT STATEMENT Report - Transport Statement/Report · 12 Aug 2026
  • OUTLINE DELIVERY AND SERVICING PLAN Accompanying report · 12 Aug 2026
  • OPERATIONAL WASTE MANAGEMENT STRATEGY Accompanying report · 12 Aug 2026
  • OUTLINE SITE WASTE MANAGEMENT PLAN Accompanying report · 12 Aug 2026
  • TRAVEL PLAN Report - Travel Plan · 12 Aug 2026
  • PART 1 - OUTLINE CONSTRUCTION LOGISTICS PLAN Accompanying report · 12 Aug 2026
  • PART 2 - OUTLINE CONSTRUCTION LOGISTICS PLAN Accompanying report · 12 Aug 2026
  • STORM WATER STRATEGY AND MAINTENANCE PLAN Other · 12 Aug 2026
  • SUSTAINABLE DRAINAGE STRATEGY DOCUMENT Other · 12 Aug 2026
  • APPENDIX A GLA SPREADSHEET Other · 12 Aug 2026
  • ENERGY STRATEGY REPORT Accompanying report · 12 Aug 2026
  • BREEAM PRE- ASSESSMENT REPORT Accompanying report · 12 Aug 2026
  • PART 1 - SUSTAINABILITY STATEMENT REPORT Accompanying report · 12 Aug 2026
  • PART 2 - SUSTAINABILITY STATEMENT REPORT Accompanying report · 12 Aug 2026
  • PART 3 - SUSTAINABILITY STATEMENT REPORT Accompanying report · 12 Aug 2026
  • URBAN GREENING FACTOR REPORT Accompanying report · 12 Aug 2026
  • ASSESSMENT OF FINANCIAL VIABILITY OF OFFICE USE Accompanying report · 12 Aug 2026
  • WLCA ASSESSMENT TEMPLATE Other · 12 Aug 2026
  • WHOLE LIFE CARBON ESTIMATE Accompanying report · 12 Aug 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT Accompanying report · 12 Aug 2026
  • AIR QUALITY ASSESMENT Accompanying report · 12 Aug 2026
  • PROPOSED SECTION BB Drawing · 12 Aug 2026
  • PROPOSED SECTION AA Drawing · 12 Aug 2026
  • PROPOSED BASEMENT LEVEL - 01 Drawing · 12 Aug 2026
  • DEMOLITION SECTION AA Drawing · 12 Aug 2026
  • DEMOLITION NORTH EAST ELEVATION Drawing · 12 Aug 2026
  • FIRE STATEMENT Accompanying report · 12 Aug 2026
  • PROPOSED NORTH EAST ELEVATION Drawing · 12 Aug 2026
  • PROPOSED SOUTH EAST ELEVATION Drawing · 12 Aug 2026
  • PROPOSED SOUTH WEST ELEVATION Drawing · 12 Aug 2026
  • PROPOSED ROOF LEVEL Drawing · 12 Aug 2026
  • PROPOSED LEVEL 06 Drawing · 12 Aug 2026
  • PROPOSED LEVEL 04 TO LEVEL 05 Drawing · 12 Aug 2026
  • PROPOSED LEVEL 02 TO LEVEL 03 Drawing · 12 Aug 2026
  • PROPOSED LEVEL 01 Drawing · 12 Aug 2026
  • PROPOSED GROUND LEVEL Drawing · 12 Aug 2026
  • EXISTING ROOF LEVEL Drawing · 12 Aug 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Accompanying report · 12 Aug 2026
  • STATUTORY METRIC Other · 12 Aug 2026
  • PRE-DEMOLITION AUDIT Accompanying report · 12 Aug 2026
  • CIRCULAR ECONOMY STATEMENT Accompanying report · 12 Aug 2026
  • DAYLIGHT & SUNLIGHT REPORT Report - Daylight/Sunlight Report · 12 Aug 2026
  • CHAPTER 4 TO 5 - PROPOSED CHANGE OF USE, VISION AND HOTEL CONCEPT Report - Design & Access Statement/Report · 12 Aug 2026
  • APPENDIX I - SCENARIO 1 APPRAISAL SUMMARY Other · 12 Aug 2026
  • APPENDIX J - SCENARIO 2 APPRAISAL SUMMARY Other · 12 Aug 2026
  • APPENDIX K - SCENARIO 3 APPRAISAL SUMMARY Other · 12 Aug 2026
  • MARKETING UPDATE Other · 12 Aug 2026
  • HOTEL MARKET OVERVIEW Other · 12 Aug 2026
  • CIL FORM Other · 12 Aug 2026
  • COMMENTS - THAMES WATER Consultee Comment · 05 Aug 2026
  • PLANNING STATEMENT Report - Planning Statement/Report · 04 Aug 2026
  • COVER LETTER Cover Letter · 04 Aug 2026
  • APPLICATION FORM Application Form · 04 Aug 2026
  • OPERATIONAL MANAGEMENT PLAN Accompanying report · 04 Aug 2026
  • CONFIRMATION OF SUFFICIENT CAPACITY Accompanying letters · 04 Aug 2026
  • REPRESENTATION - CITY OF LONDON CONSERVATION AREA ADVISORY COMMITTEE Public Comment · 31 Jul 2026
  • CONFIRMATION OF SUFFICIENT CAPACITY Accompanying report · 28 Jul 2026
  • COMMENTS - THAMES WATER Consultee Comment · 21 Jul 2026
  • SUSTAINABLE DRAINAGE STRATEGY DOCUMENT Accompanying report · 15 Jul 2026
  • DRAINAGE LAYOUT Drawing · 15 Jul 2026
  • CARBON APPENDIX A GLA SPREADSHEET Other · 01 Jun 2026
  • BNG STATUTORY METRIC Other · 01 Jun 2026
  • PROPOSED SECTION BB P1 Drawing · 01 Jun 2026
  • SITE LOCATION PLAN P1 Site Plan · 01 Jun 2026
  • EXISTING SITE PLAN P1 Site Plan · 01 Jun 2026
  • EXISTING BASEMENT LEVEL -02 P2 Drawing · 01 Jun 2026
  • EXISTING GROUND LEVEL P2 Drawing · 01 Jun 2026
  • EXISTING LEVEL 01 P2 Drawing · 01 Jun 2026
  • EXISTING LEVEL 02 TO LEVEL 05 P2 Drawing · 01 Jun 2026
  • EXISTING ROOF LEVEL P2 Drawing · 01 Jun 2026
  • EXISTING SOUTH WEST ELEVATION P1 Drawing · 01 Jun 2026
  • EXISTING SOUTH EAST ELEVATION P1 Drawing · 01 Jun 2026
  • EXISTING NORTH EAST ELEVATION P1 Drawing · 01 Jun 2026
  • EXISTING SECTION AA P1 Drawing · 01 Jun 2026
  • EXISTING SECTION BB P1 Drawing · 01 Jun 2026
  • DEMOLITION BASEMENT LEVEL -02 P2 Drawing · 01 Jun 2026
  • DEMOLITION BASEMENT LEVEL -01 P2 Drawing · 01 Jun 2026
  • DEMOLITION GROUND LEVEL P2 Drawing · 01 Jun 2026
  • DEMOLITION LEVEL 01 P2 Drawing · 01 Jun 2026
  • DEMOLITION LEVEL 02 TO LEVEL 05 P2 Drawing · 01 Jun 2026
  • DEMOLITION LEVEL 06 P2 Drawing · 01 Jun 2026
  • DEMOLITION ROOF LEVEL P2 Drawing · 01 Jun 2026
  • DEMOLITION SOUTH WEST ELEVATION P2 Drawing · 01 Jun 2026
  • DEMOLITION SOUTH EAST ELEVATION P2 Drawing · 01 Jun 2026
  • DEMOLITION NORTH EAST ELEVATION P2 Drawing · 01 Jun 2026
  • DEMOLITION SECTION AA P1 Drawing · 01 Jun 2026
  • DEMOLITION SECTION BB P1 Drawing · 01 Jun 2026
  • PROPOSED SITE PLAN P2 Site Plan · 01 Jun 2026
  • PROPOSED BASEMENT LEVEL -02 P2 Drawing · 01 Jun 2026
  • PROPOSED BASEMENT LEVEL -01 P2 Drawing · 01 Jun 2026
  • PROPOSED LEVEL 01 P2 Drawing · 01 Jun 2026
  • PROPOSED LEVEL 02 TO LEVEL 03 P2 Drawing · 01 Jun 2026
  • PROPOSED LEVEL 04 TO LEVEL 05 P2 Drawing · 01 Jun 2026
  • PROPOSED LEVEL 07 P2 Drawing · 01 Jun 2026
  • PROPOSED LEVEL 08 P2 Drawing · 01 Jun 2026
  • PROPOSED ROOF LEVEL P2 Drawing · 01 Jun 2026
  • PROPOSED SOUTH WEST ELEVATION P2 Drawing · 01 Jun 2026
  • PROPOSED SOUTH EAST ELEVATION P2 Drawing · 01 Jun 2026
  • PROPOSED NORTH EAST ELEVATION P2 Drawing · 01 Jun 2026
  • CEMP - MAY 2026 Other · 01 Jun 2026
  • CIRCULAR ECONOMY REPORT - MAY 2026_PART2 Accompanying report · 01 Jun 2026
  • CIRCULAR ECONOMY REPORT - MAY 2026_PART3 Accompanying report · 01 Jun 2026
  • CIRCULAR ECONOMY REPORT - MAY 2026_PART4 Accompanying report · 01 Jun 2026
  • DAYLIGHT SUNLIGHT REPORT - MAY 2026_PART1 Report - Daylight/Sunlight Report · 01 Jun 2026
  • DAYLIGHT SUNLIGHT REPORT - MAY 2026_PART2 Report - Daylight/Sunlight Report · 01 Jun 2026
  • DAYLIGHT SUNLIGHT REPORT - MAY 2026_PART3 Report - Daylight/Sunlight Report · 01 Jun 2026
  • DELIVERY AND SERVICING PLAN - MAY 2026 Other · 01 Jun 2026
  • ENERGY STRATEGY REPORT - MAY 2026 Other · 01 Jun 2026
  • HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - MAY 2026 Other · 01 Jun 2026
  • HOTEL OPERATIONAL MANAGEMENT PLAN - MAY 2026 Other · 01 Jun 2026
  • OFFICE MARKETING UPDATE - MAY 2026 Other · 01 Jun 2026
  • OFFICE VIABILITY REPORT - MAY 2026 Other · 01 Jun 2026
  • OFFICE VIABILITY REPORT APPENDIX K - SCENARIO 3 APPRAISAL SUMMARY Other · 01 Jun 2026
  • DAS CHAPTER 4 TO 5 - PROPOSED CHANGE OF USE VISION AND HOTEL CONCEPT Report - Design & Access Statement/Report · 01 Jun 2026
  • EXISTING LEVEL 06 P2 Drawing · 01 Jun 2026
  • PROPOSED LEVEL 06 P2 Drawing · 01 Jun 2026
  • PROPOSED SECTION AA P1 Drawing · 01 Jun 2026
  • BNG REPORT-A - MAY 2026 Other · 01 Jun 2026
  • BREEAM PRE-ASSESSMENT REPORT - FEB 2026 Accompanying report · 01 Jun 2026
  • CARBON APPENDIX A GLA SPREADSHEET Other · 01 Jun 2026
  • CIRCULAR ECONOMY REPORT - MAY 2026_PART1 Accompanying report · 01 Jun 2026
  • LIGHTING STRATEGY PLANNING REPORT - MAY 2026 Accompanying report · 01 Jun 2026
  • OFFICE VIABILITY REPORT APPENDIX I - SCENARIO 1 APPRAISAL SUMMARY Other · 01 Jun 2026
  • OFFICE VIABILITY REPORT APPENDIX J - SCENARIO 2 APPRAISAL SUMMARY Other · 01 Jun 2026
  • SUSTAINABILITY STATEMENT - MAY 2026_PART1 Accompanying report · 01 Jun 2026
  • SUSTAINABILITY STATEMENT - MAY 2026_PART2 Accompanying report · 01 Jun 2026
  • SUSTAINABILITY STATEMENT - MAY 2026_PART3 Accompanying report · 01 Jun 2026
  • SUSTAINABILITY STATEMENT - MAY 2026_PART4 Accompanying report · 01 Jun 2026
  • DAS CHAPTER 1 TO 3 - INTRODUCTION LOCATION AND CONTEXT SITE AND EXISTING BUILDIN Report - Design & Access Statement/Report · 01 Jun 2026
  • DAS CHAPTER 6 - CONSULTATION PROCESS Report - Design & Access Statement/Report · 01 Jun 2026
  • DAS CHAPTER 7 TO 8- DESIGN DEVELOPMENT AND PROPOSAL Report - Design & Access Statement/Report · 01 Jun 2026
  • DAS CHAPTER 9 - VERIFIED TOWNSCAPE VIEWS Report - Design & Access Statement/Report · 01 Jun 2026
  • DAS CHAPTER 10 TO 15 - CONSULTANT REPORTS AND SUMMARY Report - Design & Access Statement/Report · 01 Jun 2026
  • WLCA_ASSESSMENT_TEMPLATE Other · 01 Jun 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 121 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 5 Lloyd's Avenue London EC3N 3AE

    24/00939/FULL Submitted 28 Aug 2024 50 yards away

    Change of use from a sandwich/coffee bar (Class E(a)) use to a drinking establishment with a substantial food offer (Sui Generis) use [Retrospective].

    Granted Full applications 11 docs
  • Friary Court 65 Crutched Friars London EC3N 2AE

    26/01185/MDC Submitted 18 Aug 2026 50 yards away

    100% historically approved · decision due ~13 Oct

    Submission of drawings and Suicide Prevention Risk Assessment pursuant to discharge of conditions 34 & 41 of planning permission 22/00882/FULMAJ dated 27.06.2023.

    Awaiting decision Conditions 6 docs
  • Friary Court 65 Crutched Friars London EC3N 2AE

    23/00728/MDC Submitted 10 Jul 2023 50 yards away

    Submission of pre-demolition audit pursuant to condition 5 of planning permission 22/00882/FULMAJ dated 27/06/2023.

    Granted Conditions Demolition 5 docs
  • Friary Court 65 Crutched Friars London EC3N 2AE

    24/01121/MDC Submitted 18 Oct 2024 50 yards away

    Submission of details including plans and section elevations of any undersailing of the basement of the building under the public highway to ensure a minimum undersail depth of 1.2m from pavement level, pursuant to condition 72 of planning permission 22/00882/FULMAJ dated 27.06.2023, as amended under 24/00105/NMA dated 14.08.2024.

    Granted Conditions 4 docs
  • 65 Crutched Friars London EC3N 2AE

    24/00112/MDC Submitted 2 Feb 2024 50 yards away

    Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects pursuant to condition 7 of planning permission 22/00882/FULMAJ dated 27/06/2023.

    Granted Conditions 4 docs
  • Friary Court 65 Crutched Friars London EC3N 2AE

    23/01041/MDC Submitted 22 Sep 2023 50 yards away

    Submission of a Fire Statement, in the form of an independent fire strategy produced by a third party suitably qualified assessor, pursuant to condition 20 of planning permission 22/00882/FULMAJ dated 27/06/2023.

    Granted Conditions 6 docs

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications