Planning application
26/00725/FULL
66 Shoe Lane London EC4A 3BQ
Proposal
(i) Replacement of existing kitchen extract equipment; (ii) installation of one condenser unit and associated works; at roof level inside the existing plant enclosure
As published by the council, reference 26/00725/FULL
Timeline
Dates from the published record
-
19 May 2026
Received by City of London
-
9 Jun 2026
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24/00629/MDC Granted
66 - 73 Shoe Lane London EC4A 3BQ
Submission of a management plan covering the details of the maintenance and management of the space including both hard and soft landscaping as well as litter collection and cleaning regimes pursuant to condition 4 of planning permission 23/00758/FULL dated 04/01/2024.
-
26/1756/K Granted
66 Shoe Lane London EC4A 3BQ
(i) Replacement of existing kitchen extract equipment; (ii) installation of one condenser unit and associated works; at roof level inside the existing plant enclosure.
-
PA/26/01033/NC Granted
66 Shoe Lane, London, EC4A 3BQ
Observation by City of London for (i) Replacement of existing kitchen extract equipment; (ii) installation of one condenser unit and associated works; at roof level inside the existing plant enclosure
-
26/03967/OBS Awaiting decision
Shoe Lane City Of London London EC4A 3JB
Replacement of existing kitchen extract equipment; (ii) installation of one condenser unit and associated works; at roof level inside the existing plant enclosure at 66 Shoe Lane London.
-
25/01297/ADVT Withdrawn
2 New Street Square London EC4A 3BF
Installation and display of one illuminated projecting sign measuring 0.6 m in height, 0.6 m in width and displayed at a height of 2.45 m above ground level.
-
26/00421/CLEUD Granted
Thavies Inn House 3 - 4 Holborn Circus London EC1N 2HA
The application seeks confirmation that the works undertaken constitute lawful implementation of the planning permission reference. 24/00688/FULL. In order to lawfully implement the Planning Permission, the following works have been undertaken on site: Demolition of plant room roof structure.
Other full applications applications
In City of London
-
26/01052/FULL Awaiting decision
55 Mark Lane London EC3R 7NE
Installation of new air condenser units and new railing at the south east part of the flat roof and associated works.
-
26/00826/FULL Granted
88 Wood Street London EC2V 7DA
Installation of a double set of doors to be formed within the existing glazed curtain wall at Level 12 roof terrace.
-
26/00797/FULL Granted
1 London Wall Place London EC2Y 5AU
Installation of three metal mechanical louvred ventilation panels at upper ground level in the Fore Street elevation of 1 London Wall Place.
-
26/00113/FULL Granted
Salters Hall Gardens St Alphage Garden London EC2
Landscaping comprising (i) replacing of soft landscaping (12sqm of lawn and 26sqm of planting bed) with 38sqm of paving; (ii) Replacement of 41sqm of gravel surface with soft landscaped area comprising high quality diverse pollinator friendly planting; (iii) Provision of 48m linear of new hedgerow.
-
26/00573/FULL Granted
International Financial Centre 25 Old Broad Street London EC2N 1HQ
Installation of a canopy to the eastern elevation of the building.