Skip to content
PlanIndex Get alerts
Menu

Planning application

11 - 13 Crosswall London EC3N 2JY

Awaiting decision City of London 25/01803/FULMAJ Full Major Application

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of the existing office building (Class E) and construction of a ground plus eight-storey building (9 storeys in total at a height of 46.34m AOD) to provide: purpose-built student accommodation (Sui Generis) comprising 127 rooms; student communal amenity space at ground floor level including incubator space; with associated hard and soft landscaping and associated works.

As published by the council, reference 25/01803/FULMAJ

Application record

Reference
25/01803/FULMAJ
Type
Full Major Application
Status
Under Consideration
Received
23 Dec 2025
Validated
23 Dec 2025
Ward
Tower
Decision by
Delegated
Postcode
EC3N 2JY

Timeline

Dates from the published record

  1. 23 Dec 2025

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 March 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Newmark LLP Agent

924 applications on PlanIndex · across 40 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Urbanest UK Crosswall Limited And Threadneedle Pensions Limi Applicant

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

143 documents on file for this application

  • PROPOSED ELEVATION-EAST Drawing · 26 Jun 2026
  • PROPOSED SECTION-AA Drawing · 26 Jun 2026
  • PROPOSED-LANDSCAPING PLAN Drawing · 26 Jun 2026
  • PROPOSED PLAN-STOPPING-UP OF HIGHWAYS Drawing · 26 Jun 2026
  • PROPOSED PLAN-GROUND FLOOR Drawing · 26 Jun 2026
  • STOPPING UP PLAN WITH PROPOSED GROUND FLOOR LAYOUT Drawing · 24 Jun 2026
  • HIGHWAY ADOPTION PLAN WITH PROPOSED GROUND FLOOR LAYOUT Drawing · 24 Jun 2026
  • PROPOSED DEVELOPMENT HIGHWAYS AND TITLE OVERLAY SKETCH Drawing · 24 Jun 2026
  • S278 HIGHWAY WORKS Drawing · 24 Jun 2026
  • PROPOSED PLAN - STOPPING-UP OF HIGHWAYS Drawing · 24 Jun 2026
  • PROPOSED - SITE PLAN APPLICATION AREA Site Plan · 18 Jun 2026
  • PROPOSED ELEVATION-EAST Drawing · 29 May 2026
  • PROPOSED-LANDSCAPING PLAN Drawing · 29 May 2026
  • PROPOSED-AREA OF WORKS Drawing · 29 May 2026
  • PROPOSED-SITE PLAN APPLICATION AREA Drawing · 29 May 2026
  • PROPOSED PLAN-GROUND FLOOR Drawing · 29 May 2026
  • GROUND FLOOR AMENDMENTS Other · 29 May 2026
  • PROPOSED SECTION-AA Drawing · 29 May 2026
  • DAYLIGHT AND SUNLIGHT REDUCED SCHEME ADDENDUM Accompanying report · 18 May 2026
  • DAYLIGHT AND SUNLIGHT CONTEXTUAL ADDENDUM Accompanying letters · 27 Apr 2026
  • COMMENTS - THAMES WATER Consultee Comment · 17 Apr 2026
  • COMMENTS - PLANNING GATEWAY ONE Consultee Comment · 13 Apr 2026
  • LANDSCAPE Accompanying report · 07 Apr 2026
  • COMMENTS - LONDON BOROUGH OF TOWER HAMLETS Consultee Comment · 04 Mar 2026
  • REPRESENTATION - ALDGATE CONNECT BID Public Comment · 27 Feb 2026
  • APPLICANT RESPONSE TO HSE Other · 27 Feb 2026
  • ADVICE TO THE LOCAL PLANNING AUTHORITY Other · 27 Feb 2026
  • REPRESENTATION - NORTHEASTERN UNIVERSITY LONDON Public Comment · 19 Feb 2026
  • COMMENTS - THAMES WATER Consultee Comment · 17 Feb 2026
  • REPRESENTATION - CROSSTREE REAL ESTATE PARTNERS Public Comment · 13 Feb 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 11 Feb 2026
  • REPRESENTATION - SENZO Public Comment · 11 Feb 2026
  • REPRESENTATION - KING?S COLLEGE LONDON Public Comment · 11 Feb 2026
  • COMMENTS - PORT OF LONDON AUTHORITY Consultee Comment · 09 Feb 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 06 Feb 2026
  • COMMENTS - HEALTH AND SAFETY EXECUTIVE Consultee Comment · 04 Feb 2026
  • COMMENTS - NATS SAFEGUARDING Consultee Comment · 26 Jan 2026
  • DRAWING ISSUE SHEET Drawings Schedule · 07 Jan 2026
  • PROPOSED - LANDSCAPING PLAN-P01 Drawing · 07 Jan 2026
  • STATUTORY BIODIVERSITY METRIC INCL. POCKET PARK V2 Other · 06 Jan 2026
  • GF DEMO Drawing · 23 Dec 2025
  • 6599_11-13 CROSSWALL_CIRCULAR ECONOMY STATEMENT P02_INC. APPENDICES_2 OF 6 Other · 23 Dec 2025
  • 6599_11-13 CROSSWALL_CIRCULAR ECONOMY STATEMENT P02_INC. APPENDICES_1 OF 6 Other · 23 Dec 2025
  • P3990_CROSSWALL_DLSL NEIGHBOURING REPORT_16 DEC 2025_1 Other · 23 Dec 2025
  • P3990_CROSSWALL_DLSL NEIGHBOURING REPORT_16 DEC 2025_2 Other · 23 Dec 2025
  • P3990_CROSSWALL_INTERNAL DSO_16 DEC 2025_V2 Report - Daylight/Sunlight Report · 23 Dec 2025
  • 21687101-WAT-XX-XX-RP-N-750002 ECIA Other · 23 Dec 2025
  • 7303-MTT-XX-XX-RP-X-03001 - 11-13 CROSSWALL - ENERGY STATEMENT - 11.12.25_1 OF 6 Other · 23 Dec 2025
  • 7303-MTT-XX-XX-RP-X-03001 - 11-13 CROSSWALL - ENERGY STATEMENT - 11.12.25_2 OF 6 Other · 23 Dec 2025
  • 7303-MTT-XX-XX-RP-X-03001 - 11-13 CROSSWALL - ENERGY STATEMENT - 11.12.25_3 OF 6 Other · 23 Dec 2025
  • 7303-MTT-XX-XX-RP-X-03001 - 11-13 CROSSWALL - ENERGY STATEMENT - 11.12.25_4 OF 6 Other · 23 Dec 2025
  • 7303-MTT-XX-XX-RP-X-03001 - 11-13 CROSSWALL - ENERGY STATEMENT - 11.12.25_5 OF 6 Other · 23 Dec 2025
  • 7303-MTT-XX-XX-RP-X-03001 - 11-13 CROSSWALL - ENERGY STATEMENT - 11.12.25_6 OF 6 Other · 23 Dec 2025
  • 2025-12-15 - KL10008 R1 ISSUE 4 URBANEST CROSSWALL - LONDON PLAN FIRE STATEMENT Other · 23 Dec 2025
  • 2025-12-15 - KL10008 R2 ISSUE 4 URBANEST CROSSWALL - GATEWAY 1 FORM Other · 23 Dec 2025
  • 6599 - URBANEST CROSSWALL - EXTERNAL LIGHTING STATEMENT_1 OF 2 Other · 23 Dec 2025
  • 6599 - URBANEST CROSSWALL - EXTERNAL LIGHTING STATEMENT_2 OF 2 Other · 23 Dec 2025
  • 251202.25304.QA ENS.REV1 Report - Acoustic/Noise Report · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART8 OF 8 Other · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART1 OF 8 Other · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART2 OF 8 Other · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART3 OF 8 Other · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART4 OF 8 Other · 23 Dec 2025
  • R01-IB-DA-TRANSPORT STATEMENT F1 (251212) Report - Transport Statement/Report · 23 Dec 2025
  • R03-DA-BREEAM STUDENT TRAVEL PLAN F1 (251212) Report - Travel Plan · 23 Dec 2025
  • R04-DA-DELIVERY AND SERVICING PLAN F1 (251212) Other · 23 Dec 2025
  • 6599 - 11-13 CROSSWALL_WLCA_P02_INC. APPENDICES_1 OF 2 Other · 23 Dec 2025
  • 6599 - 11-13 CROSSWALL_WLCA_P02_INC. APPENDICES_2 OF 2 Other · 23 Dec 2025
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT Accompanying report · 23 Dec 2025
  • PROPOSED PLAN - BASEMENT-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - GROUND FLOOR-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 01-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 02-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 03-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 04-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 05-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 06-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 07-P01 Drawing · 23 Dec 2025
  • PROPOSED PLAN - LEVEL 08-P01 Drawing · 23 Dec 2025
  • PROPOSED SECTION - AA-P01 Drawing · 23 Dec 2025
  • PROPOSED SECTION - BB-P01 Drawing · 23 Dec 2025
  • CRO-APT-XX-ZZZZ-DR-A-PL-0011-PROPOSED - SITE PLAN APPLICATION AREA-P01 Site Plan · 23 Dec 2025
  • APPLICATIONFORMREDACTED Application Form · 23 Dec 2025
  • BASEMENT DEMO Drawing · 23 Dec 2025
  • LEVEL 01 DEMO Drawing · 23 Dec 2025
  • LEVEL 02 DEMO Drawing · 23 Dec 2025
  • LEVEL 03 DEMO Drawing · 23 Dec 2025
  • LEVEL 04 DEMO Drawing · 23 Dec 2025
  • LEVEL 05 DEMO Drawing · 23 Dec 2025
  • PLANT 06 DEMO Drawing · 23 Dec 2025
  • ROOF LEVEL DEMO Drawing · 23 Dec 2025
  • EXISTING PLAN - BASEMENT-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - GROUND FLOOR-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - LEVEL 01-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - LEVEL 02-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - LEVEL 03-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - LEVEL 04-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - LEVEL 05-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - LEVEL 06-P01 Drawing · 23 Dec 2025
  • EXISTING PLAN - ROOF LEVEL-P01 Drawing · 23 Dec 2025
  • EXISTING - SITE PLAN-P01 Drawing · 23 Dec 2025
  • EXISTING SECTION - AA-P01 Drawing · 23 Dec 2025
  • EXISTING SECTION - BB-P01 Drawing · 23 Dec 2025
  • EXISTING ELEVATION - NORTH-P01 Drawing · 23 Dec 2025
  • EXISTING ELEVATION - EAST-P01 Drawing · 23 Dec 2025
  • EXISTING ELEVATION - SOUTH-P01 Drawing · 23 Dec 2025
  • EXISTING ELEVATION - WEST-P01 Drawing · 23 Dec 2025
  • 21687100-WAT-EAQ-ZZ-RP-O-720001_P01.03_S1_FINAL Accompanying report · 23 Dec 2025
  • 11-13 CROSSWALL_DBA_V3_11-12-2025 Other · 23 Dec 2025
  • 6599_11-13 CROSSWALL_CIRCULAR ECONOMY STATEMENT P02_INC. APPENDICES_6 OF 6 Other · 23 Dec 2025
  • 6599_11-13 CROSSWALL_CIRCULAR ECONOMY STATEMENT P02_INC. APPENDICES_5 OF 6 Other · 23 Dec 2025
  • 6599_11-13 CROSSWALL_CIRCULAR ECONOMY STATEMENT P02_INC. APPENDICES_4 OF 6 Other · 23 Dec 2025
  • 6599_11-13 CROSSWALL_CIRCULAR ECONOMY STATEMENT P02_INC. APPENDICES_3 OF 6 Other · 23 Dec 2025
  • URBANESTCROSSWALL.SCI.FINAL Other · 23 Dec 2025
  • STUDENT MANAGEMENT PLAN ADDENDUM Other · 23 Dec 2025
  • 6599_11-13 CROSSWALL_SUSTAINABILITY STATEMENT P02_INC. APPENDICES_1 OF 2 Other · 23 Dec 2025
  • 6599_11-13 CROSSWALL_SUSTAINABILITY STATEMENT P02_INC. APPENDICES_2 OF 2 Other · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART5 OF 8 Other · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART6 OF 8 Other · 23 Dec 2025
  • 11-13 CROSSWALL-THVIA FINAL_HR_PART7 OF 8 Other · 23 Dec 2025
  • PROPOSED SECTION - CC-P01 Drawing · 23 Dec 2025
  • PROPOSED SECTION - DD-P01 Drawing · 23 Dec 2025
  • PROPOSED ELEVATION - NORTH-P01 Drawing · 23 Dec 2025
  • PROPOSED ELEVATION - EAST-P01 Drawing · 23 Dec 2025
  • PROPOSED ELEVATION - SOUTH-P01 Drawing · 23 Dec 2025
  • 21687101-WAT-XX-XX-RP-N-750003 BNG Other · 23 Dec 2025
  • 251216 11-13 CROSSWALL CIL FORM Other · 23 Dec 2025
  • PROPOSED PLAN - ROOF-P01 Drawing · 23 Dec 2025
  • R02-DA-CONSTRUCTION LOGISTICS PLAN F2 (251218) Other · 23 Dec 2025
  • XXX-APT-XX-XX-TRP-A-000080-PART 3 Report - Design & Access Statement/Report · 23 Dec 2025
  • XXX-APT-XX-XX-TRP-A-000080-PART 4 Report - Design & Access Statement/Report · 23 Dec 2025
  • XXX-APT-XX-XX-TRP-A-000080-PART 5 Report - Design & Access Statement/Report · 23 Dec 2025
  • XXX-APT-XX-XX-TRP-A-000080-PART 6 Report - Design & Access Statement/Report · 23 Dec 2025
  • XXX-APT-XX-XX-TRP-A-000080-PART 1 Report - Design & Access Statement/Report · 23 Dec 2025
  • XXX-APT-XX-XX-TRP-A-000080-PART 2 Report - Design & Access Statement/Report · 23 Dec 2025
  • CRO-APT-XX-XXXX-SH-A-00-0001 - DRAWING ISSUE SHEET Other · 23 Dec 2025
  • PROPOSED PLAN - STOPPING-UP OF HIGHWAYS-P01 Drawing · 23 Dec 2025
  • CRO-APT-XX-ZZZZ-DR-A-PL-0012-PROPOSED - AREA OF WORKS-P01 Site Plan · 23 Dec 2025
  • CRO-APT-XX-ZZZZ-DR-A-PL-0010-SITE LOCATION PLAN-P01 Site Plan · 23 Dec 2025
  • 251219 CROSSWALL COVER LETTER Cover Letter · 23 Dec 2025
  • 25121911-13 CROSSWALL PLANNING STATEMENT Report - Planning Statement/Report · 23 Dec 2025
  • REPRESENTATION - KING?S COLLEGE LONDON Public Comment · 26 Nov 2025
  • DAYLIGHT AND SUNLIGHT ADDENDUM NOTE Accompanying letters · 31 Oct 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of thirteen weeks. Over the last year City of London decided full applications in a median of 121 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 11-13 Crosswall, London EC3N 2JY

    PA/26/00147 Submitted 23 Jan 2026 50 yards away

    Demolition of the existing office building (Class E) and construction of a ground plus eightstorey building (9 storeys in total at a height of 46.34m AOD) to provide: purpose-built student accommodation (Sui Generis) comprising 127 rooms; student communal amenity space at ground floor level including incubator space; with associated hard and soft landscaping and associated works.

    Granted Demolition 2 docs
  • 11-13 Crosswall, London EC3N 2JY

    PA/26/00147/NC Submitted 23 Jan 2026 50 yards away

    Demolition of the existing office building (Class E) and construction of a ground plus eightstorey building (9 storeys in total at a height of 46.34m AOD) to provide: purpose-built student accommodation (Sui Generis) comprising 127 rooms; student communal amenity space at ground floor level including incubator space; with associated hard and soft landscaping and associated works.

    Granted Demolition 2 docs
  • 122 Minories And 14 Crosswall London EC3N 1NT

    22/00878/FULL Submitted 15 Sep 2022 50 yards away

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow amendments to the wording of condition 22 (Residential Noise Levels) of planning permission 22/00035/FULMAJ dated 9th August 2022.

    Withdrawn Full applications 4 docs
  • 122 Minories And 14 Crosswall London EC3N 1NT

    22/00918/MDC Submitted 26 Sep 2022 50 yards away

    Submission of details pursuant to Condition 6 NRMM Registration), Condition 7 (Ground Invesitgation Report) and Condition 16 (Sound Transmission) of planning permission 22/00035/FULMAJ dated 9th August 2022.

    Granted Conditions 22 docs
  • 122 Minories And 14 Crosswall London EC3N 1NT

    23/01427/ADVT Submitted 29 Dec 2023 50 yards away

    Installation and display of an externally illuminated scaffolding shroud and advertisement measuring 7m high by 10m wide situated at 3.5m from ground level and projecting 1.5m from the building for a temporary period of 9 months

    Refused Advertising 17 docs
  • 122 Minories London EC3N 1NT

    26/00427/NMA Submitted 24 Mar 2026 50 yards away

    Non-Material Amendment under S96A of the Town and Country Planning Act 1990 (as amended) to Planning Permission 22/00035/FULMAJ dated 9th August 2022 to vary Condition 37 (Approved Drawings) to amend Apartments 5 and 8 bedroom to be single occupancy for PartM4(3) accessible requirement.

    Granted Amendments New dwelling 4 docs

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications