Planning application
25/01800/FULL
City of London School 107 Queen Victoria Street London EC4V 3AL
Proposal
Installation of a canopy, planting, louvers and digital display, together with alterations to fenestration, to the entrance on Peter's Hill.
As published by the council, reference 25/01800/FULL
Timeline
Dates from the published record
-
22 Dec 2025
Received by City of London
-
8 May 2026
Decision issued: Approved
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/01224/MDC Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of Mechanical Plant Noise Assessment Report pursuant to discharge of Conditions 2 and 3 of planning permission 25/00438/FULL dated 30.07.2025.
-
24/00398/FULL Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Removal of existing roof mounted plant and existing glazing and the installation of 11 no. louvres and 17 no. spandrel panels to match those existing and retained at lower level on the same elevation to the DVA Building. Together with the installation of new roof mounted plant to the sixth floor flat roof of the main school building to match existing adjacent plant; and the installation of two new VRV outdoor units below the public roadway of White Lion Hill, at the rear of the DVA Building and within the school site.
-
25/01443/OBS Awaiting decision
Bankside House, 24 Sumner Street, London
Demolition of the existing building and hardstanding and redevelopment of Bankside House to provide one mixed-use building of three distinct built elements connected by a pavilion level to provide purpose-built student accommodation with ancillary facilities (Sui Generis) and ground floor commercial floorspace, café and retail (Use Class E) and community facilities (Use Class F1/F2), (including part use as a hotel Class C1 [and/or for the provision of other shortterm seasonal accommodation] outside of term times) alongside associated cycle parking, servicing, plant, landscaping improvements, and wider public realm enhancements.For information: - Proposed Building A is 24 storeys with additional rooftop plant/enclosure (84.8m AOD, 81.5m above ground), proposed Building B is 26 storeys with additional rooftop lift overrun/enclosure (90.8m AOD, 87.5m above ground) and proposed Building C is 28storeys (96.8m AOD, 93.5m above ground) The development as a whole comprises: - 1,872 bedrooms, (providing 1,944 beds) (Class Sui Generis); - 121sqm GIA of community hub and 88sqm GIA of Community classroom (Class F1/F2); - 162sqm GIA of café and 191sqm GIA of Retail (Class E); - 4,276sqm GIA Student amenity and dining area (Class Sui Generis); - A single storey wide basement containing plant and ancillary facilities to the aforementioned uses. - Only Building B is proposed to operate as short-term seasonal accommodation, with Buildings A and C proposed for summer school use
-
25/01810/MDC Granted
99 Queen Victoria Street London EC4V 4EH
Submission of an operational management plan prior to the first use of the platform lift pursuant to condition 14 of planning permission 24/01267/FULL dated 18/08/2025.
-
25/01811/MDC Granted
99 Queen Victoria Street London EC4V 4EH
Submission of details of suicide prevention measures and associated risk assessment to prevent jumping or falling from the development pursuant to condition 15 of planning permission 24/01267/FULL dated 18/08/2025.
-
25/01677/MDC Granted
99 Queen Victoria Street London EC4V 4EH
Submission of details of plant noise, installation and maintenance; and details relating to mounting of mechanical plant to minimise transmission of structure borne sound or vibration pursuant to conditions 5 and 6 of planning permission 24/01267/FULL dated 18/08/2025.
Other full applications applications
In City of London
-
26/01052/FULL Awaiting decision
55 Mark Lane London EC3R 7NE
Installation of new air condenser units and new railing at the south east part of the flat roof and associated works.
-
26/00826/FULL Granted
88 Wood Street London EC2V 7DA
Installation of a double set of doors to be formed within the existing glazed curtain wall at Level 12 roof terrace.
-
26/00797/FULL Granted
1 London Wall Place London EC2Y 5AU
Installation of three metal mechanical louvred ventilation panels at upper ground level in the Fore Street elevation of 1 London Wall Place.
-
26/00113/FULL Granted
Salters Hall Gardens St Alphage Garden London EC2
Landscaping comprising (i) replacing of soft landscaping (12sqm of lawn and 26sqm of planting bed) with 38sqm of paving; (ii) Replacement of 41sqm of gravel surface with soft landscaped area comprising high quality diverse pollinator friendly planting; (iii) Provision of 48m linear of new hedgerow.
-
26/00573/FULL Granted
International Financial Centre 25 Old Broad Street London EC2N 1HQ
Installation of a canopy to the eastern elevation of the building.