Planning application
City of London School 107 Queen Victoria Street London EC4V 3AL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a chilled water-cooling coil comprised of one new packaged chiller complete with circulation pump, a buffer vessel, and associated pipework.
As published by the council, reference 25/00438/FULL
Application record
- Reference
- 25/00438/FULL
- Type
- Full Planning Permission
- Status
- Under Consideration
- Received
- 28 Mar 2025
- Validated
- 6 May 2025
- Ward
- Queenhithe
- Decision by
- Delegated
- Postcode
- EC4V 3AL
Site history
Applications at this address on the City of London register
This site has had 10 applications since 2010: 6 approved, 0 refused.
-
25/01800/FULL Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Installation of a canopy, planting, louvers and digital display, together with alterations to fenestration, to the entrance on Peter's Hill.
-
25/01224/MDC Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of Mechanical Plant Noise Assessment Report pursuant to discharge of Conditions 2 and 3 of planning permission 25/00438/FULL dated 30.07.2025.
-
25/00297/FULL Awaiting decision
City of London School 107 Queen Victoria Street London EC4V 3AL
Installation of an additional security fencing to the southwest ramp.
-
25/00286/MDC Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of Mechanical Noise Plant Assessment pursuant to discharge of condition 3(a) and 3(b) of planning permission 24/00398/FULL dated 31.10.2024.
-
25/00186/MDC Awaiting decision
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of details, particulars and samples of all proposed external materials for external faces pursuant to discharge condition 2 of planning ref. 24/00398/FULL dated 31.10.2024.
-
24/01356/MDC Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of details pursuant to condition 4 Mechanical Plant Mounting Systems of planning permission 24/00398/FULL dated 31.10.2024.
-
24/00398/FULL Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Removal of existing roof mounted plant and existing glazing and the installation of 11 no. louvres and 17 no. spandrel panels to match those existing and retained at lower level on the same elevation to the DVA Building. Together with the installation of new roof mounted plant to the sixth floor flat roof of the main school building to match existing adjacent plant; and the installation of two new VRV outdoor units below the public roadway of White Lion Hill, at the rear of the DVA Building and within the school site.
-
23/01424/FULMAJ Awaiting decision
City of London School 107 Queen Victoria Street London EC4V 3AL
Extension of the existing school comprising the construction of a three-storey courtyard infill extension to the west of the site and single storey rooftop extensions to the northern block, together with alterations to the Peter's Hill entrance, refurbishment and other incidental works including landscaping and provision of roof terraces.
-
10/00123/FULLR3 Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Replacement of metal concertina door with new steel windows to eastern elevation.
Timeline
Dates from the published record
-
28 Mar 2025
Received by City of London
-
6 May 2025
Validated
Checked as complete and ready for consideration.
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 85 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
25/01224/MDC Granted
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of Mechanical Plant Noise Assessment Report pursuant to discharge of Conditions 2 and 3 of planning permission 25/00438/FULL dated 30.07.2025.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Manchester
232 applications on PlanIndex · across 26 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 132 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
City of London School 107 Queen Victoria Street London EC4V 3AL
99% historically approved · decision due ~21 May
Extension of the existing school comprising the construction of a three-storey courtyard infill extension to the west of the site and single storey rooftop extensions to the northern block, together with alterations to the Peter's Hill entrance, refurbishment and other incidental works including landscaping and provision of roof terraces.
Awaiting decision Full applications Extension 108 docsMajor scheme -
City of London School 107 Queen Victoria Street London EC4V 3AL
99% historically approved · decision due ~24 Apr
Installation of an additional security fencing to the southwest ramp.
Awaiting decision Full applications 8 docs -
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of Mechanical Noise Plant Assessment pursuant to discharge of condition 3(a) and 3(b) of planning permission 24/00398/FULL dated 31.10.2024.
Granted Conditions 5 docs -
City of London School 107 Queen Victoria Street London EC4V 3AL
Replacement of metal concertina door with new steel windows to eastern elevation.
Granted Full applications Windows or glazing 12 docs -
City of London School 107 Queen Victoria Street London EC4V 3AL
100% historically approved · decision due ~2 Apr
Submission of details, particulars and samples of all proposed external materials for external faces pursuant to discharge condition 2 of planning ref. 24/00398/FULL dated 31.10.2024.
Awaiting decision Conditions 6 docs -
City of London School 107 Queen Victoria Street London EC4V 3AL
Submission of details pursuant to condition 4 Mechanical Plant Mounting Systems of planning permission 24/00398/FULL dated 31.10.2024.
Granted Conditions 5 docs
Other full applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.