Skip to content
PlanIndex Get alerts
Menu

Planning application

25/01408/FULL

5 Pump Court Middle Temple London EC4Y 7AP

Awaiting decision City of London Full Planning Permission

Proposal

Change of use of 5 Pump Court First Floor South, currently classified as E(g)(i) Office to C3 Dwellinghouse, together with Listed Building Consent for the necessary internal alterations to allow use as a residential flat.

As published by the council, reference 25/01408/FULL

Timeline

Dates from the published record

  1. 14 Oct 2025

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/01234/FULL Granted

    5 Pump Court Middle Temple London EC4Y 7AP

    Change of use of 5 Pump Court First Floor North, currently classified as E(g)(i) Office to C3 Dwellinghouse.

    5 Sep 2025 0m away Full applications
  • 25/01235/LBC Granted

    5 Pump Court Middle Temple London EC4Y 7AP

    Internal alterations to facilitate the change of use from Class E(g)(i) Office to C3 Dwellinghouse.

    5 Sep 2025 0m away Heritage and listed buildings
  • 25/01409/LBC Awaiting decision

    5 Pump Court Middle Temple London EC4Y 7AP

    Change of use of 5 Pump Court First Floor South, currently classified as E(g)(i) Office to C3 Dwellinghouse, together with Listed Building Consent for the necessary internal alterations to allow use as a residential flat.

    14 Oct 2025 0m away Heritage and listed buildings
  • 24/01107/FULL Granted

    1 Pump Court Middle Temple London EC4Y 7AB

    Erection of air conditioner condenser units on roof, and associated acoustic screening.

    15 Oct 2024 46m away Full applications
  • 23/00529/FULL Granted

    Cloisters 3rd Floor North Pump Court Middle Temple London EC4Y 7AB

    Change of use of third floor North unit from office floorspace (Use Class E) to residential use (Use Class C3) (96.8sqm).

    19 May 2023 46m away Full applications
  • 25/01329/FULL Awaiting decision

    Second Floor West Goldsmith Building Inner Temple Lane London EC4Y 7BL

    Change of use from Office (Use Class E (g) (i)) to residential use (Use Class C3).

    30 Sep 2025 66m away Full applications

In City of London

  • 26/01052/FULL Awaiting decision

    55 Mark Lane London EC3R 7NE

    Installation of new air condenser units and new railing at the south east part of the flat roof and associated works.

    27 Jul 2026 Full applications
  • 26/00826/FULL Granted

    88 Wood Street London EC2V 7DA

    Installation of a double set of doors to be formed within the existing glazed curtain wall at Level 12 roof terrace.

    8 Jun 2026 Full applications
  • 26/00797/FULL Granted

    1 London Wall Place London EC2Y 5AU

    Installation of three metal mechanical louvred ventilation panels at upper ground level in the Fore Street elevation of 1 London Wall Place.

    2 Jun 2026 Full applications
  • 26/00113/FULL Granted

    Salters Hall Gardens St Alphage Garden London EC2

    Landscaping comprising (i) replacing of soft landscaping (12sqm of lawn and 26sqm of planting bed) with 38sqm of paving; (ii) Replacement of 41sqm of gravel surface with soft landscaped area comprising high quality diverse pollinator friendly planting; (iii) Provision of 48m linear of new hedgerow.

    26 Jan 2026 Full applications
  • 26/00573/FULL Granted

    International Financial Centre 25 Old Broad Street London EC2N 1HQ

    Installation of a canopy to the eastern elevation of the building.

    21 Apr 2026 Full applications