Planning application
4 Pump Court Middle Temple London EC4Y 7AN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of external handrails to entrance steps and provision of automatic door controls to entrance door.
As published by the council, reference 10/00353/FULL
Application record
- Reference
- 10/00353/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 1 Jun 2010
- Validated
- 1 Jun 2010
- Decided
- 22 Jul 2010
- Ward
- Farringdon Without
- Parish
- Pump Court, 1 (And Cloisters), 2, 3 & 4
- Decision by
- Delegated Decision
- Postcode
- EC4Y 7AN
Site history
Applications at this address on the City of London register
This site has had 2 applications since 2010: 2 approved, 0 refused.
-
10/00354/LBC Granted
4 Pump Court Middle Temple London EC4Y 7AN
Installation of external handrails to entrance steps and provision of automatic door controls to entrance door.
Timeline
Dates from the published record
-
1 Jun 2010
Received by City of London
-
22 Jul 2010
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 22 July 2010, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
4 Pump Court Middle Temple London EC4Y 7AN
Installation of external handrails to entrance steps and provision of automatic door controls to entrance door.
Granted Heritage and listed buildings 15 docs -
5 Pump Court Middle Temple London EC4Y 7AP
Removal of existing double entrance doors and installation of a new single leaf door. Installation of new handrails and railings to main entrance steps.
Granted Heritage and listed buildings 16 docs -
5 Pump Court Middle Temple London EC4Y 7AP
Removal of existing double entrance doors and installation of a new single leaf door. Installation of new handrails and railings to main entrance steps.
Granted Full applications 19 docs -
1 Pump Court Middle Temple London EC4Y 7AB
Erection of air conditioner condenser units on roof, and associated acoustic screening.
Granted Full applications 15 docs -
5 Pump Court Middle Temple London EC4Y 7AP
Change of use of 5 Pump Court First Floor North, currently classified as E(g)(i) Office to C3 Dwellinghouse.
Granted Full applications 15 docsDomestic -
5 Pump Court Middle Temple London EC4Y 7AP
Internal alterations to facilitate the change of use from Class E(g)(i) Office to C3 Dwellinghouse.
Granted Heritage and listed buildings 12 docsDomestic
Other full applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.