Planning application
Swan Pier Swan Lane London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Reinstatement of Swan Lane Pier and the permanent mooring of a stationary ship to provide a Livery Hall comprising office space, a library, education suite, court room, cabins, cafe, publicly accessible deck space and a function space. Works include provision of landside access, removal of two dolphins and installation of two mooring piles within the foreshore and a canting brow. [Re-consultation due to amended/additional documents]
As published by the council, reference 25/01113/FULMAJ
Application record
- Reference
- 25/01113/FULMAJ
- Type
- Full Major Application
- Status
- Under Consideration
- Received
- 14 Aug 2025
- Validated
- 14 Aug 2025
- Ward
- Dowgate
- Decision by
- Delegated
Timeline
Dates from the published record
-
14 Aug 2025
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 November 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
City of London took a median of 84 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Iceni Projects Ltd. Agent, registered in London
Active · incorporated 2005 · London
861 applications on PlanIndex · across 92 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
158 documents on file for this application
- PUBLIC BENEFITS
- PUBLIC BENEFITS
- NAVIGATION RISK ASSESSMENT PLAN
- COMMENTS - ENVIRONMENT AGENCY
- SCOUR ASSESSMENT
- APPLICANT RESPONSE TO ENVIRONMENT AGENCY OBJECTION
- FLOOD RISK ASSESSMENT
- FLOOD RISK ASSESSMENT
- RIVER WALL ASSESSMENT
- MASTER MARINERS HQS DREDGE PLAN
- ICENI PROJECTS INTERIM RESPONSE TO PLA COMMENTS
- BIODIVERSITY NET GAIN (EXEMPTION AND NO NET LOSS) TECHNICAL NOTE
- INCLUSIVE DESIGN STATEMENT
- BIODIVERSITY NET GAIN (EXEMPTION AND NO NET LOSS) TECHNICAL NOTE
- SPREADSHEET - GLA CE MEMO - STAGE 1
- SPREADSHEET - GLA CE
- SPREADSHEET - WLCA ASSESSMENT
- SPREADSHEET - GLA WLC MEMO
- SPREADSHEET - GLA CONSULTATION - STAGE 1 - AQ MEMO
- SUSTAINABILITY STATEMENT - STAGE 2
- FIRE STATEMENT
- FLOOD RISK ASSESSMENT
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT
- ICENI PROJECTS INTERIM RESPONSE TO GLA COMMENTS
- OPERATIONAL WASTE MANAGEMENT PLAN
- COMMENTS - MARITIME & COASTGUARD AGENCY
- COMMENTS - MARINE MANAGEMENT ORGANISATION
- COMMENTS - MARITIME & COASTGUARD AGENCY
- REPRESENSENTATION-CAPT. ERNESTO E. DUHART
- REPRESENSENTATION-ED WOOLLAM
- REPRESENSENTATION-RT HON LORD WEST
- REPRESENTATION - LAMBROS VARNAVIDES
- REPRESENTATION - STEVE CAMERON
- REPRESENTATION - JAMES BARCLAY
- REPRESENTATION - JULIAN DADGOSTAR
- COMMENTS - GREATER LONDON AUTHORITY
- ADDITIONAL REPRESENTATION - HILARY PEREIRA
- REPRESENTATION - CLLR DAVID WATSON
- REPRESENTATION - UI WATERMARK PLACE LIMITED
- REPRESENTATION - KATHLEEN EHRLICH
- REPRESENTATION - KIT CHAN AND BRIAN GREEN
- REPRESENTATION - SELINA BARKER
- REPRESENTATION - THE RIVERBANK HOUSE UNIT TRUST
- REPRESENTATION - CERNE CANNING
- REPRESENTATION - SOUTHWARK CATHEDRAL
- REPRESENTATION - THE WORSHIPFUL COMPANY OF TOBACCO PIPE MAKERS AND TOBACCO BLEND
- REPRESENTATION - MRS EF BAILEY DR TRS BAILEY
- REPRESENTATION - SYLVIA WILLIAMS
- REPRESENTATION - PAUL SATER
- REPRESENTATION - JOHN PHILLIPS
- REPRESENTATION - RIVER RESIDENTS GROUP
- REPRESENTATION - NICHOLAS GRENSIDE
- REPRESENTATION - LOLA GRENSIDE
- REPRESENTATION - VIKKI BRADNEY-SPENCER
- REPRESENTATION - WILLIAM ADRIAN LOADER AND ISABELLA LOADER
- REPRESENTATION - EMILY SHIRLEY
- REPRESENTATION - NEIL JOHNSTON
- REPRESENTATION - LEE BRAILEY & DR. CHRISTIAN PINTADO
- REPRESENTATION - JULIAN DAY
- REPRESENTATION - SUSAN YOUNG
- COMMENTS - PORT OF LONDON AUTHORITY
- REPRESENTATION - THE WORSHIPFUL COMPANY OF LORINERS
- REPRESENTATION - WORSHIPFUL COMPANY OF BUILDERS' MERCHANTS
- REPRESENTATION - CHRISTOPHER MEADOWS
- REPRESENTATION - THE CLOTHWORKERS? COMPANY
- REPRESENTATION - THE WORSHIPFUL COMPANY OF CHARTERED ARCHITECTS
- REPRESENTATION - THE WORSHIPFUL COMPANY OF SADDLERS
- REPRESENTATION - THE WORSHIPFUL COMPANY OF INTERNATIONAL BANKERS
- LETTER FROM WORSHIPFUL COMPANY OF MAKERS OF PLAYING CARDS
- REPRESENTATION - DAVID CROWLEY
- REPRESENTATION - ABEL HERRERO-DUCLOUX
- COMMENTS - TRANSPORT FOR LONDON
- REPRESENTATION - VIVIEN FOWLE
- REPRESENTATION - DAVID BALL
- COMMENTS - SOUTHWARK COUNCIL
- REPRESENTATION - DAVID AND ANNE STEPHENS
- COMMENTS - TFL
- REPRESENTATION - CHRISTOPHER SHAW
- REPRESENTATION - YUMI ROSS
- REPRESENTATION - JOHN ROSS
- REPRESENTATION - DR CELIA AND DR ROY PALMER
- COMMENTS - HISTORIC ENGLAND
- COMMENTS-HISTORIC ENGLAND
- REPRESENTATION - RESIDENTS' ASSOCIATION OF THE BOROUGH MARKET NEIGHBOURHOOD
- COMMENTS - ENVIRONMENTAL AGENCY
- COMMENTS - NETWORK RAIL
- REPRESENTATION - CASPAR HOUSDEN
- COMMENTS-HISTORIC ENGLAND
- REPRESENTATION-FRED RODGERS
- WLCA TEMPLATE
- CIRCULAR ECONOMY STATEMENT
- SWAN LANE EXISTING ELEVATION
- MASTER MARINERS - GIA AND GEA
- MC-2346 HQSMM PLANNING DRAWINGS 23.11.23
- GENERAL ARRANGEMENT PLAN V032
- HQSMM BERTH REDLINE PLAN
- MASTER MARINER HAT AND LAT
- DESIGN AND ACCESS STATEMENT
- SUSTAINABILITY STATEMENT
- PNHA
- VERIFIED VIEWS (PART 1 OF 5)
- VERIFIED VIEWS (PART 2 OF 5)
- VERIFIED VIEWS (PART 3 OF 5)
- VERIFIED VIEWS (PART 4 OF 5)
- SITE LOCATION PLAN
- TRANSPORT STATEMENT (APPENDICES)
- TRANSPORT STATEMENT
- DELIVERY AND SERVICING PLAN
- EVENT MANAGEMENT PLAN
- OPERATIONAL MANAGEMENT PLAN
- AIR QUALITY ASSESSMENT
- FIRE STATEMENT
- NOISE IMPACT ASSESSMENT
- INDICATIVE CONSTRUCTION METHODOLOGY
- WATER FRAMEWORK DIRECTIVE
- MARINE ENVIRONMENTAL ASSESSMENT
- PRELIMINARY NAVIGATION HAZARD ANALYSIS
- NON-INTRUSIVE FORESHORE SURVEY
- BIODIVERSITY NET GAIN - TECHNICAL NOTE
- CIL ADDITIONAL QUESTIONS FORM (13.08.25)
- COVER LETTER
- SWAN LANE EXISTING CROSS SECTION 4015
- FLOOD RISK ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT (2025)
- VERIFIED VIEWS (PART 5 OF 5)
- APPLICATIONFORMREDACTED
- PLANNING STATEMENT (2025)
- SWAN LANE EXISTING LOCATION PLAN 4016
- SWAN LANE EXISTING PLAN
- SITE LOCATION PLAN - OS
- NON-INTRUSIVE FORESHORE SURVEY
- ARCHAEOLOGICAL ASSESSMENT INCLUDING THAMES FORESHORE FIELD SURVEY
- CIL FORM
- COVER LETTER
- DELIVERY & SERVICING PLAN
- DESIGN AND ACCESS STATEMENT
- EVENT MANAGEMENT PLAN
- FIRE STATEMENT REPORT
- FLOOD RISK ASSESSMENT
- INDICATIVE CONSTRUCTION METHODOLOGY FOR THE "MASTER MARINER"
- MARINE ENVIRONMENTAL ASSESSMENT
- NOISE IMPACT ASSESSMENT REPORT
- OPERATIONAL MANAGEMENT PLAN
- PRELIMINARY NAVIGATION HAZARD ANALYSIS
- STATEMENT OF COMMUNITY INVOLVEMENT
- SUSTAINABILITY STATEMENT STAGE 2
- TRANSPORT STATEMENT (APPENDICES)
- TRANSPORT STATEMENT
- VERIFIED VIEWS
- WATER FRAMEWORK DIRECTIVE ? SCREENING AND SCOPING
- WLCA TEMPLATE
- SHIP LOCATION
- PLANNING STATEMENT
- MASTER MARINER HAT AND LAT
- MASTER MARINER GIA & GEA
- SHIP LOCATION
- AIR QUALITY ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of thirteen weeks. Over the last year City of London decided full applications in a median of 121 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
River Foreshore Adjacent To Riverbank House Swan Lane EC4R 3BF
Submission of details pursuant to discharge of conditions 3 (Archaeological Assessment), 4 (Scheme for Protecting Nearby Residents and Commercial Occupiers), 5 (Construction Environmental Management Plan), 6 (Non-Road Mobile Machinery Register), 7 (Biodiversity Net Gain), 8 (Landscape and Ecological Management Plan) and 9 (Rock Mattress Details) of planning permission 24/00938/FULLR3 dated 04.03.2025.
Granted Conditions 12 docs -
Seal House 1 Swan Lane London EC4R 3TN
Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3, Paragraph 4.5 of the Section 106 Agreement dated 30.09.2021 (Planning Reference 18/01178/FULMAJ).
Granted 4 docs -
Seal House 1 Swan Lane London EC4R 3TN
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 18/01178/FULMAJ dated 30th September 2021 to i) amend the description of development to reflect the latest Use Class Order and remove the floorspace figures; ii) add a condition listing the floorspace figures; and amend condition 43 (Approved Plans) to allow design changes including the reconfiguration of the cores, office entrance and cycle parking entrance; introduction of a mezzanine floor to the ground floor restaurant; lowering of the entrance to the ground floor restaurant and roof garden lobby to level of the river walkway; introduction of a cantilevered stair to the roof garden on the southwestern corner; omission of winter gardens; introduction of balconies on the southern and southeastern elevations; amendment to the use of the link building between the site and Fishmongers Hall from plant room to office space; and introduction of a sedum room on the link building; and associated works.
Granted Amendments 14 docs -
Seal House 1 Swan Lane London EC4R 3TN
Submission of a Contamination Investigation and Risk Assessment pursuant to condition 9 (Contaminated Land) of planning permission 18/01178/FULMAJ (dated 30.09.2021).
Granted Conditions 9 docs -
Seal House 1 Swan Lane London EC4R 3TN
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to vary Condition 20 (Noise from Plant) of planning permission dated 30.09.2021, ref: 18/01178/FULMAJ (as amended by non-material amendments: refs. 22/01226/NMA, 23/00039/NMA, and 23/00815/NMA), to accommodate deviation in background noise levels caused by operation and maintenance of life-safety generators on site.
Granted Amendments 5 docs -
Seal House 1 Swan Lane London EC4R 3TN
Submission of details of utility connections, pursuant to Schedule 3, Paragraph 12.1 of the S106 Agreement signed 30.09.2021, case reference 18/01178/FULMAJ.
Granted 4 docs
Other full applications
In City of London
-
26/01083/FULL Granted
Offices Chapter House St Paul's Churchyard London EC4M 8AD
Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).
-
26/01051/FULL Granted
55 Mark Lane London EC3R 7NE
Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.
-
24/00544/FULL Granted
6 -7 New Street London EC2M 4TP
Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.
-
26/00858/FULL Granted
Condor House 10 St Paul's Churchyard London EC4M 8AL
Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.
-
26/01104/FULL Granted
30 - 34 Moorgate London EC2R 6DA
Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.