Planning application

25/01069/MDC

Aldersgate House 135 - 137 Aldersgate Street London EC1A 4JA

Granted City of London Submission of details (Planning)

Proposal

Submission of a Construction Management Plan pursuant to discharge of condition 3 of planning permission 24/01308/FULL dated 05.02.2025.

As published by the council, reference 25/01069/MDC

Timeline

Dates from the published record

  1. 5 Aug 2025

    Received by City of London

  2. 26 Feb 2026

    Decision issued: Approved

  3. 24 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 25/01215/FULL Granted

    Aldersgate House 135 - 137 Aldersgate Street London EC1A 4JA

    Replacement Air Handling Units in existing lower deck area at rear of building.

    3 Sep 2025 0m away Full applications
  • 26/00037/NMA Granted

    Aldersgate House 135 - 137 Aldersgate Street London EC1A 4JA

    Application for non-material amendment under S96A of the Town and Country Planning Act 1990 (as amended) to amend condition 8 (Approved Plans) of planning permission 24/01308/FULL dated 05.02.2025 for minor amendments which include: i. Introduction of a low-level structure/access platform at the northern side of the plant room, ii. Modest increase in the height of the proposed roof plant enclosure of 800mm at its highest point, iii. Change of external cladding material from lead to zinc, iv. Amendments to the areas proposed for green sedum roof installation.

    13 Jan 2026 0m away Amendments
  • 26/00748/FULMAJ Awaiting decision

    140 Aldersgate Street London EC1A 4HY

    Extensions to the existing building, involving the partial demolition and construction at Levels 7 and 8 to provide additional office floorspace (Use Class E (g)(i)), including alterations to the external amenity terrace at Level 3, new rooftop plant, alterations to the lower levels including the provision of retail (Use Class E (a/b)) at ground floor level and flexible office / retail floorspace (Class E (a/b/g(i)) at lower ground floor level (basement 1), relocation of the primary building entrance, elevational alterations, re-provision of a public toilet and all associated works.

    22 May 2026 49m away Full applications
  • 26/00008/MDC Awaiting decision

    42 - 43 Charterhouse Square London EC1M 6EW

    Submission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due to the proposed works; (b) provide detailed design and Risk Assessment Method Statement for all demolition, temporary and permanent works; (c) provide detailed design and Risk Assessment Method Statement on the use of tall plant/scaffolding/lifting equipment; (d) demonstrate that there will at no time be any potential security risk to our railway, property or structures; (e) mitigate the effects of noise arising from the proposed works on LU assets; and (f) no works to commence on any part of TfL/LU Property or in it's airspace until any agreements required with TfL Engineering, TfL Property or TfL Legal have been agreed and signed by all parties pursuant to condition 5 of planning permission 24/00155/FULL dated 02/07/2024.

    5 Jan 2026 56m away Conditions
  • 26/00311/FULL Granted

    Second Floor Flat 42 Charterhouse Square London EC1M 6EA

    Replacement of 3no. casement windows at second floor flats, at the rear elevation.

    2 Mar 2026 56m away Full applications
  • 26/00661/NMA Awaiting decision

    First Floor Flat 42 Charterhouse Square London EC1M 6EA

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) for the omission of Condition 4 (London Underground) from planning permission ref: 24/00852/FULL, dated 17.12.2024, due to amendments to the proposed flow and return pipe runs from the ASHP unit at roof level to the first floor flat.

    6 May 2026 56m away Amendments

In City of London

  • 26/00993/MDC Granted

    55 And 65 Old Broad Street London EC2M 1RX

    Submission of Construction Logistics Plan pursuant to discharge of Condition 8 of planning permission 23/00469/FULEIA dated 19.12.2024.

    13 Jul 2026 Conditions
  • 26/00776/MDC Granted

    Faryners House 25 Monument Street London EC3R 8BQ

    Submission of details of Site Condition Survey pursuant to condition 23 of Planning Permission 24/00535/FULL dated 24.04.2026.

    28 May 2026 Conditions
  • 26/00808/MDC Granted

    Tenter House 45 Moorfields London EC2Y 9AE

    Submission of details of a Piling Method Statement pursuant to conditions 73 and 75 of Planning permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    3 Jun 2026 Conditions
  • 26/00898/MDC Granted

    55 And 65 Old Broad Street London EC2M 1RX

    Submission of Infrastructure Protection Details pursuant to Condition 38 of Planning Permission 23/00469/FULEIA dated 19.12.2024.

    23 Jun 2026 Conditions
  • 26/00896/MDC Granted

    Poultry Market And General Market And The Annexe Buildings West Smithfield London EC1A 9PS

    Submission of details of fume extract arrangement, ventilation and kitchen extract arrangements pursuant to condition 33 and 34 of Planning Permission 19/01343/FULEIA dated 13.04.2023.

    23 Jun 2026 Conditions