Planning application

42 - 43 Charterhouse Square London EC1M 6EW

Awaiting decision City of London 26/00008/MDC Submission of details (Planning)

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due to the proposed works; (b) provide detailed design and Risk Assessment Method Statement for all demolition, temporary and permanent works; (c) provide detailed design and Risk Assessment Method Statement on the use of tall plant/scaffolding/lifting equipment; (d) demonstrate that there will at no time be any potential security risk to our railway, property or structures; (e) mitigate the effects of noise arising from the proposed works on LU assets; and (f) no works to commence on any part of TfL/LU Property or in it's airspace until any agreements required with TfL Engineering, TfL Property or TfL Legal have been agreed and signed by all parties pursuant to condition 5 of planning permission 24/00155/FULL dated 02/07/2024.

As published by the council, reference 26/00008/MDC

Application record

Reference
26/00008/MDC
Type
Submission of details (Planning)
Status
Under Consideration
Received
5 Jan 2026
Validated
5 Jan 2026
Ward
Farringdon Within
Decision by
Delegated
Postcode
EC1M 6EW

Timeline

Dates from the published record

  1. 5 Jan 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 2 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 78 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 24/00155/FULL (Decided)

Who's behind it

Company information only, from the register and Companies House

Etchingham Architecture Ltd Agent, an architecture practice registered in Bournemouth

Active · incorporated 2024 · Bournemouth

9 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • COMMENTS - LONDON UNDERGROUND Consultee Comment · 22 Jan 2026
  • SCAFFOLD ERECTION MJH SIGNED Other · 21 Jan 2026
  • LONDON UNDERGROUND Consultee Comment · 06 Jan 2026
  • APPLICATIONFORMREDACTED Application Form · 05 Jan 2026
  • APPROVED ISLINGTON OUT OF HOURS STREETWORKS REQUEST Other · 05 Jan 2026
  • APPROVED SITE HOURS VARIATION REQUEST Other · 05 Jan 2026
  • CITY OF LONDON AIP25_0016 ACCEPTANCE Other · 05 Jan 2026
  • DESIGN CHECK CERTIFICATE - FRONT Other · 05 Jan 2026
  • IMPACT STATEMENT - WORKS ABOVE RETAINING WALL W308 Other · 05 Jan 2026
  • LONDON UNDERGROUND COMMENTS LOG Other · 05 Jan 2026
  • MAC SCAFFOLDING RAMS REV 6 Other · 05 Jan 2026
  • PBL PERMANENT WORKS RAMS REV A Other · 05 Jan 2026
  • PBL SCAFFOLD AND TEMP ROOF RAMS Other · 05 Jan 2026
  • SCAFFOLD DESIGN CHECK CERTIFICATE - REAR Other · 05 Jan 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided condition discharge and variation applications in a median of 83 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Second Floor Flat 42 Charterhouse Square London EC1M 6EA

    26/00311/FULL Submitted 2 Mar 2026 0m away

    Replacement of 3no. casement windows at second floor flats, at the rear elevation.

    Granted Full applications New dwelling Windows or glazing 15 docs
  • First Floor Flat 42 Charterhouse Square London EC1M 6EA

    26/00661/NMA Submitted 6 May 2026 0m away

    100% historically approved · decision due ~1 Jul

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) for the omission of Condition 4 (London Underground) from planning permission ref: 24/00852/FULL, dated 17.12.2024, due to amendments to the proposed flow and return pipe runs from the ASHP unit at roof level to the first floor flat.

    Awaiting decision Amendments 6 docs
  • First Floor Flat 42 Charterhouse Square London EC1M 6EA

    24/00852/FULL Submitted 9 Aug 2024 0m away

    Installation of a new external air source heat pump (ASHP) unit to serve the first floor flat with associated external pipe to the rear.

    Granted Full applications 17 docs
  • 33 - 37 Charterhouse Square London EC1M 6EA

    23/00556/MDC Submitted 26 May 2023 14m away

    Submission of details of a Travel Plan pursuant to Condition 11 of planning permission dated 22/08/2019 (ref: 19/00119/FULL)

    Granted Conditions 4 docs
  • Second Floor Flat 41 Charterhouse Square London EC1M 6EA

    26/01012/FULL Submitted 16 Jul 2026 14m away

    98% historically approved · decision due ~10 Sep

    Installation of an Air Source Heat Pump (ASHP) to flat roof area.

    Awaiting decision Full applications 13 docs
  • 41 Charterhouse Square London EC1M 6EA

    24/00731/FULL Submitted 9 Jul 2024 16m away

    Alterations to existing roof and roof glazing together with replacement of rear second floor windows.

    Granted Full applications Windows or glazing 17 docs

In City of London

  • 26/00641/MDC Granted

    Development Site Salisbury Square London

    Submission of Construction Local Procurement Monitoring pursuant to the partial discharge of Condition 2(B) and Court Building Details pursuant to the partial discharge of Condition 37 parts (c), (e), (f), (i), (j) and (l) of Planning Permission 20/00997/FULEIA dated 30.07.2021.

    Received 30 Apr, published by the council 24 Jul 2026 Conditions
  • 25/01807/MDC Granted

    47-50 Mark Lane London EC3R 5AS

    Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 7 of planning permission 24/01044/FULL dated 25/03/2025.

    Received 24 Dec, published by the council 24 Jul 2026 Conditions
  • 26/00622/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of external facing materials pursuant to part discharge of Parts E and K and full discharge of Parts F and H of Condition 21 of planning permission 26/00244/FULL dated 24th June 2026

    Received 28 Apr, published by the council 24 Jul 2026 Conditions
  • 26/00048/MDC Granted

    Cripplegate House 1 Golden Lane London EC1Y 0RR

    Submission of details of the position and size of the green/blue roof(s), the type of planting and a substantial contribution of the green/blue roof(s) to biodiversity and rainwater attenuation pursuant to condition 11 of planning permission 22/00202/FULMAJ dated 23/01/2023.

    Received 14 Jan, published by the council 24 Jul 2026 Conditions
  • 26/00138/MDC Granted

    Cripplegate House 1 Golden Lane London EC1Y 0RR

    Submission of details generator technical report pursuant to condition 20 of Planning Permission 22/00202/FULMAJ dated 23.01.2023.

    Received 30 Jan, published by the council 24 Jul 2026 Conditions