Planning application
25/00711/FULL
Offices 42 - 44 Carter Lane London EC4V 5EA
Proposal
(i) Change of use of first, second, third and fourth floors from office use (Class E) to apart-hotel (Class C1) comprising four serviced apartments; (ii) replacement of existing single glazing with double glazing within the existing window frames.
As published by the council, reference 25/00711/FULL
Timeline
Dates from the published record
-
30 May 2025
Received by City of London
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/01222/FULL Granted
2 Burgon Street London EC4V 5DR
Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 11 (approved plans) of planning permission 21/00768/FULL, dated 6th of October 2022 for the following design changes: (i) Retention of first floor office floorspace (Class E), subsequent reduction in number of residential units (C3) from four to three; (ii) Alterations to the proposed fourth floor flat to replace the balcony with a dormer window.
-
25/01358/CLEUD Granted
2 Burgon Street London EC4V 5DR
Certificate of lawful existing use or development to determine whether the works carried out constitute the lawful implementation of planning permission 21/00768/FULL, dated 6th of October 2022.
-
26/00436/MDC Granted
59 Carter Lane London EC4V 5AQ
Submission of details of acoustic technical note pursuant to Condition 8 of planning permission 24/01004/FULL dated 18.03.2025.
-
25/01024/MDC Granted
59 Carter Lane London EC4V 5AQ
Submission of details and samples pursuant to discharge of Condition 16 of planning permission 24/01004/FULL dated 18.03.2025.
-
26/00662/MDC Granted
59 Carter Lane London EC4V 5AQ
Submission of details of Vibration Isolation Scheme pursuant to Condition 6 of Planning Permission 24/01004/FULL dated 18.03.2025.
-
26/00740/MDC Awaiting decision
59 Carter Lane London EC4V 5AQ
Submission of details of proposed Signage and Wayfinding Strategy pursuant to Condition 9 of Planning Permission 24/01004/FULL dated 18.03.2025.
Other full applications applications
In City of London
-
26/01052/FULL Awaiting decision
55 Mark Lane London EC3R 7NE
Installation of new air condenser units and new railing at the south east part of the flat roof and associated works.
-
26/00826/FULL Granted
88 Wood Street London EC2V 7DA
Installation of a double set of doors to be formed within the existing glazed curtain wall at Level 12 roof terrace.
-
26/00797/FULL Granted
1 London Wall Place London EC2Y 5AU
Installation of three metal mechanical louvred ventilation panels at upper ground level in the Fore Street elevation of 1 London Wall Place.
-
26/00113/FULL Granted
Salters Hall Gardens St Alphage Garden London EC2
Landscaping comprising (i) replacing of soft landscaping (12sqm of lawn and 26sqm of planting bed) with 38sqm of paving; (ii) Replacement of 41sqm of gravel surface with soft landscaped area comprising high quality diverse pollinator friendly planting; (iii) Provision of 48m linear of new hedgerow.
-
26/00573/FULL Granted
International Financial Centre 25 Old Broad Street London EC2N 1HQ
Installation of a canopy to the eastern elevation of the building.