Planning application

4 - 6 Throgmorton Avenue London EC2N 2DL

Granted City of London 25/00160/FULL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of existing chiller unit and gas boiler located at roof level and installation of a new Air Source Heat Pump (ASHP) unit, replacement and extension of the existing acoustic barrier and associated works.

As published by the council, reference 25/00160/FULL

Application record

Reference
25/00160/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
30 Jan 2025
Validated
14 Feb 2025
Decided
11 Apr 2025
Ward
Broad Street
Decision by
Delegated Decision
Postcode
EC2N 2DL

Timeline

Dates from the published record

  1. 30 Jan 2025

    Received by City of London

  2. 14 Feb 2025

    Validated

    Checked as complete and ready for consideration.

  3. 11 Apr 2025

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Offices 65 London Wall London EC2M 5TU

    26/00064/FULL Submitted 16 Jan 2026 39m away

    The retention of Air Handling Units (AHUs), with new (replacement) acoustic enclosures at basement level.

    Granted Full applications 20 docs
  • 15 Austin Friars London EC2N 2HE

    26/00377/MDC Submitted 16 Mar 2026 52m away

    100% historically approved · decision due ~11 May

    Submission of details of acoustic report pursuant to condition 2(b) of Planning permission 25/00369/FULL dated 09.05.2025.

    Awaiting decision Conditions 2 docs
  • 15 Austin Friars London EC2N 2HE

    21/00672/NMA Submitted 4 Aug 2021 52m away

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 17/00816/FULL dated 19th December 2017 to allow the omission of an internal staircase between the lower ground floor and ground floor.

    Granted Amendments 9 docs
  • 66 London Wall London EC2M 5TN

    25/00326/ADVT Submitted 10 Mar 2025 59m away

    Installation and display of: (i) 1 no. externally illuminated fascia signage measuring 4.5m in width and 0.21m in height and; (ii) 1 no. plaque signage measuring 0.6m in width and 0.61m in height at a height above ground of 1.710m.

    Granted Advertising 12 docs
  • Carpenters Hall 1 Throgmorton Avenue London EC2N 2BY

    10/00055/MDC Submitted 29 Jan 2010 62m away

    Details of refuse storage faculties to serve the dental practice use pursuant to condition 2 of Planning Permission (09/00798/FULL) dated 21.01.10.

    Granted Conditions 6 docs
  • Offices 65 London Wall London EC2M 5TU

    25/00506/FULL Submitted 15 Apr 2025 64m away

    99% historically approved · decision due ~10 Jun

    Retention of air handling units (AHUs) with new acoustic louvred enclosures at basement level.

    Awaiting decision Full applications 13 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications