Skip to content
PlanIndex Get alerts
Menu

Planning application

Carpenters Hall 1 Throgmorton Avenue London EC2N 2BY

Granted City of London 10/00055/MDC Submission of details (Planning)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of refuse storage faculties to serve the dental practice use pursuant to condition 2 of Planning Permission (09/00798/FULL) dated 21.01.10.

As published by the council, reference 10/00055/MDC

Application record

Reference
10/00055/MDC
Type
Submission of details (Planning)
Status
Decided
Decision
Approved
Received
29 Jan 2010
Validated
29 Jan 2010
Decided
11 Feb 2010
Ward
Broad Street
Parish
Throgmorton Avenue, 1
Decision by
Delegated Decision
Postcode
EC2N 2BY

Timeline

Dates from the published record

  1. 29 Jan 2010

    Received by City of London

  2. 11 Feb 2010

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 66 London Wall London EC2M 5TN

    25/00326/ADVT Submitted 10 Mar 2025 24m away

    Installation and display of: (i) 1 no. externally illuminated fascia signage measuring 4.5m in width and 0.21m in height and; (ii) 1 no. plaque signage measuring 0.6m in width and 0.61m in height at a height above ground of 1.710m.

    Granted Advertising 12 docs
  • 3 London Wall Buildings London EC2M 5PD

    10/00376/FULL Submitted 7 Jun 2010 30m away

    Temporary change of use of part ground floor from office (B1) to training use (D1) (86sq.m)

    Granted Full applications 10 docs
  • Offices 65 London Wall London EC2M 5TU

    25/00506/FULL Submitted 15 Apr 2025 31m away

    99% historically approved · decision due ~10 Jun

    Retention of air handling units (AHUs) with new acoustic louvred enclosures at basement level.

    Awaiting decision Full applications 13 docs
  • Offices 65 London Wall London EC2M 5TU

    26/01142/MDC Submitted 10 Aug 2026 31m away

    99% historically approved · decision due ~5 Oct

    Submission of details of installation of the approved acoustic screens pursuant to condition 2(a) of Planning Permission 26/00064/FULL dated 24.06.2026.

    Decided 4 docs
  • Offices 65 London Wall London EC2M 5TU

    26/00064/FULL Submitted 16 Jan 2026 39m away

    The retention of Air Handling Units (AHUs), with new (replacement) acoustic enclosures at basement level.

    Granted Full applications 20 docs
  • 1 London Wall Buildings London EC2M 5PG

    26/00766/LDC Submitted 26 May 2026 47m away

    100% historically approved · decision due ~21 Jul

    Submission of details of the proposed public water fountain pursuant to condition 4(k) of Listed Building Consent 25/00628/LBC dated 23.07.2025.

    Decided Lawful development 6 docs

In City of London

  • 26/00710/MDC Granted

    1 Exchange Square London EC2A 2JN

    Submission of ventilation details and fume extract arrangements pursuant to discharge of condition 17 of planning permission 21/00930/FULMAJ dated 14.06.2023.

    15 May 2026 Conditions
  • 25/01327/MDC Granted

    1 New Change London EC4M 9AF

    Submission of an Inclusive Access Management Plan prior to the first occupation of the development for (a) the library use (F1 use); pursuant to condition 9a of planning permission 24/00481/FULL dated 06/12/2024.

    29 Sep 2025 Conditions
  • 26/00933/MDC Granted

    122 Minories And 14 Crosswall London EC3N 1NT

    Submission of Circlular Economy Post Completion Report and Circular Economy Statements pursuant to discharge of Condition 23 of planning permission 22/00035/FULMAJ dated 09.08.2022.

    30 Jun 2026 Conditions
  • 26/00667/MDC Granted

    9A - 9B Crutched Friars London EC3N 2AU

    Submission of details of Construction Management Plan pursuant to condition 4 of Planning Permission 23/00895/FULL dated 10.05.2024.

    7 May 2026 Conditions
  • 25/01673/MDC Granted

    54 King William Street London EC4R 9AD

    Submission of details of plant noise and installation pursuant to condition 2 (part B) of planning permission 24/00504/FULL dated 03/04/2025.

    1 Dec 2025 Conditions