Planning application

Offices 65 London Wall London EC2M 5TU

Awaiting decision City of London 25/00506/FULL Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Retention of air handling units (AHUs) with new acoustic louvred enclosures at basement level.

As published by the council, reference 25/00506/FULL

Application record

Reference
25/00506/FULL
Type
Full Planning Permission
Status
Under Consideration
Received
15 Apr 2025
Validated
15 Apr 2025
Ward
Broad Street
Decision by
Delegated
Postcode
EC2M 5TU

Timeline

Dates from the published record

  1. 15 Apr 2025

    Received by City of London

  2. 10 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 10 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 85 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Sevenoaks

7 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Offices 65 London Wall London EC2M 5TU

    26/01142/MDC Submitted 10 Aug 2026 0m away

    99% historically approved · decision due ~5 Oct

    Submission of details of installation of the approved acoustic screens pursuant to condition 2(a) of Planning Permission 26/00064/FULL dated 24.06.2026.

    Decided 4 docs
  • 66 London Wall London EC2M 5TN

    25/00326/ADVT Submitted 10 Mar 2025 9m away

    Installation and display of: (i) 1 no. externally illuminated fascia signage measuring 4.5m in width and 0.21m in height and; (ii) 1 no. plaque signage measuring 0.6m in width and 0.61m in height at a height above ground of 1.710m.

    Granted Advertising 12 docs
  • 1 London Wall Buildings London EC2M 5PG

    26/00766/LDC Submitted 26 May 2026 24m away

    100% historically approved · decision due ~21 Jul

    Submission of details of the proposed public water fountain pursuant to condition 4(k) of Listed Building Consent 25/00628/LBC dated 23.07.2025.

    Decided Lawful development 6 docs
  • 1-5 London Wall Buildings London Wall London EC2M 5PG

    26/00767/MDC Submitted 26 May 2026 24m away

    99% historically approved · decision due ~21 Jul

    Submission of details of the proposed public water fountain pursuant to condition 15(k) of Planning Permission 21/00272/FULMAJ dated 28.09.2021.

    Decided 5 docs
  • 1-5 London Wall Buildings London Wall London EC2M 5PG

    26/00751/MDC Submitted 22 May 2026 24m away

    99% historically approved · decision due ~17 Jul

    Submission of details of ground floor entrance(s) pursuant to condition 15(n) of Planning Permission 21/00272/FULMAJ dated 28.09.2021.

    Awaiting decision 3 docs
  • 1 London Wall Buildings London EC2M 5PG

    26/00753/LDC Submitted 22 May 2026 24m away

    100% historically approved · decision due ~17 Jul

    Submission of details of: the treatment of all restored stair cores, including arrival corridors and landings between ground and second floor level, including floors, stairs, walls, windows ceiling and new lift apparatus pursuant to condition 4(t) of Listed Building Consent 25/00628/LBC dated 23.07.2025.

    Awaiting decision Lawful development Windows or glazing 5 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications