Skip to content
PlanIndex Get alerts
Menu

Planning application

1 - 2 St Andrew's Hill London EC4V 5BY

Awaiting decision City of London 24/01323/FULL Full Planning Permission

Works: Extension Demolition Windows or glazing Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of 1-2 St Andrew's Hill from commercial offices (Use Class E) to residential (Use Class C3) associated with the creation of 7 units; retention of Class E unit on part ground floor; increase of roof level external amenity space; internal cycle parking and the consolidation of waste storage facilities at ground floor level; part demolition and external alterations including extension associated with lift and stair overrun, creation of new entrances, replacement fenestration, shopfront alterations and installation of vitrines at ground floor level; and other associated works, including installation of a plantroom on the top floor level in an acoustic enclosure with louvred areas on the façade.

As published by the council, reference 24/01323/FULL

Application record

Reference
24/01323/FULL
Type
Full Planning Permission
Status
Under Consideration
Received
13 Dec 2024
Validated
13 Dec 2024
Ward
Farringdon Within
Decision by
Delegated
Postcode
EC4V 5BY

Timeline

Dates from the published record

  1. 13 Dec 2024

    Received by City of London

  2. 10 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 7 February 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Gerald Eve LLP Agent and applicant

882 applications on PlanIndex · across 35 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

150 documents on file for this application

  • COMMENTS - SURVEYOR TO THE FABRIC - ST PAUL?S CATHEDRAL Consultee Comment · 30 May 2025
  • COMMENTS - THAMES WATER Consultee Comment · 23 May 2025
  • PROPOSED GROUND FLOOR PLAN Drawing · 20 May 2025
  • PROPOSED FIRST FLOOR PLAN Drawing · 20 May 2025
  • PROPOSED THIRD FLOOR PLAN Drawing · 20 May 2025
  • PROPOSED B1 PLAN Drawing · 20 May 2025
  • PROPOSED SECTION DD Drawing · 20 May 2025
  • PROPOSED SECTION BB Drawing · 20 May 2025
  • PROPOSED SECTION EE Drawing · 20 May 2025
  • PROPOSED SECTION GG Drawing · 20 May 2025
  • PROPOSED WEST ELEVATION Drawing · 20 May 2025
  • INTERNAL DAYLIGHT & SUNLIGHT RESPONSE Other · 16 May 2025
  • RESPONSE TO COL COMMENTS TO THE APPLICANT Other · 16 May 2025
  • NEARBY RESIDENTIAL ANALYSIS Other · 16 May 2025
  • AIR QUALITY CLARIFICATIONS Other · 16 May 2025
  • INDICATIVE S278 AREA Drawing · 14 May 2025
  • FINANCIAL VIABILITY REVIEW Accompanying report · 14 May 2025
  • WHOLE LIFE CARBON AND CIRCULAR ECONOMY REPORT Accompanying report · 12 May 2025
  • RESPONSE TO YOUR COMMENTS Other · 12 May 2025
  • LOCALITY OF CONVENIENCE SUMMARY DOCUMENT Other · 12 May 2025
  • COMPARABLE EVIDENCE SUMMARY DOCUMENT Other · 12 May 2025
  • PROPOSED THIRD FLOOR PLAN Drawing · 01 May 2025
  • DESIGN AND ACCESS STATEMENT ADDENDUM Report - Daylight/Sunlight Report · 01 May 2025
  • PROPOSED B1 PLAN Drawing · 01 May 2025
  • DRAWING LIST Drawings Schedule · 01 May 2025
  • PROPOSED SECTION GG Drawing · 01 May 2025
  • DAYLIGHT & SUNLIGHT ADDENDUM Report - Daylight/Sunlight Report · 17 Apr 2025
  • TECHNICAL DESIGN NOTE Other · 16 Apr 2025
  • WHOLE LIFE CARBON AND CIRCULAR ECONOMY REPORT Accompanying report · 16 Apr 2025
  • CASE OFFICER COMMENTS RESPONSE Other · 04 Apr 2025
  • PUBLIC CONSULTATION RESPONSE LETTER Accompanying letters · 03 Apr 2025
  • RESPONSE BY AGENT Correspondence In · 03 Apr 2025
  • SAVILLS MARKET OVERVIEW & VIABILITY REPORT Accompanying report · 24 Mar 2025
  • REPRESENTATION - CAAC Public Comment · 20 Mar 2025
  • SCI ADDENDUM Accompanying report · 21 Feb 2025
  • REPRESENTATION - MARK WHEELER Public Comment · 14 Feb 2025
  • LETTER Accompanying letters · 10 Feb 2025
  • REPRESENTATION - RACHEL KEMBER Public Comment · 06 Feb 2025
  • REPRESENTATION - CHARLES POTT Public Comment · 06 Feb 2025
  • REPRESENTATION - TARA CRONIN Public Comment · 06 Feb 2025
  • REPRESENTATION - JOSEPH O?HARA Public Comment · 05 Feb 2025
  • REPRESENTATION - PATRYK PASZKO Public Comment · 05 Feb 2025
  • REPRESENTATION - LEONARD MOLE Public Comment · 05 Feb 2025
  • REPRESENTATION - GARETH WILLIAMS Public Comment · 05 Feb 2025
  • REPRESENTATION - ROBERT PATTWELL Public Comment · 05 Feb 2025
  • REPRESENTATION - MATTEO NONNE Public Comment · 05 Feb 2025
  • REPRESENTATION - ANNE O'HARA Public Comment · 05 Feb 2025
  • REPRESENTATION - ROBIN HELLIER Public Comment · 04 Feb 2025
  • REPRESENTATION - CHRIS PARSONS Public Comment · 04 Feb 2025
  • REPRESENTATION - CHARO HAVERMANS Public Comment · 04 Feb 2025
  • REPRESENTATION - PAUL TIMLIN Public Comment · 03 Feb 2025
  • REPRESENTATION - M MAIZIA Public Comment · 02 Feb 2025
  • REPRESENTATION - M MAIZIA Public Comment · 02 Feb 2025
  • REPRESENTATION - CHETAN PATEL Public Comment · 01 Feb 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 30 Jan 2025
  • REPRESENTATION - CIARA MILLER Public Comment · 30 Jan 2025
  • REPRESENTATION - KATE MYTHEN Public Comment · 30 Jan 2025
  • REPRESENTATION - ALEX HARWOOD Public Comment · 29 Jan 2025
  • REPRESENTATION - JANE RANDALLS Public Comment · 29 Jan 2025
  • REPRESENTATION - MELISSA CROKE Public Comment · 29 Jan 2025
  • REPRESENTATION - RUTH O?GRADY Public Comment · 29 Jan 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 24 Jan 2025
  • SUICIDE PREVENTION OVERVIEW Accompanying report · 21 Jan 2025
  • COMMENTS - HSE Consultee Comment · 17 Jan 2025
  • APPLICATIONFORMREDACTED Application Form · 13 Dec 2024
  • COVER LETTER Cover Letter · 13 Dec 2024
  • FORM_1_CIL_ADDITIONAL_INFORMATION - 1-2 ST ANDREWS HILL Other · 13 Dec 2024
  • DEMOLITION SECOND FLOOR PLAN Drawing · 13 Dec 2024
  • EXISTING THIRD FLOOR PLAN Drawing · 13 Dec 2024
  • PROPOSED THIRD FLOOR PLAN Drawing · 13 Dec 2024
  • DEMOLITION THIRD FLOOR PLAN Drawing · 13 Dec 2024
  • EXISTING FOURTH FLOOR PLAN Drawing · 13 Dec 2024
  • PROPOSED FOURTH FLOOR PLAN Drawing · 13 Dec 2024
  • DEMOLITION FOURTH FLOOR PLAN Drawing · 13 Dec 2024
  • EXISTING FIFTH FLOOR PLAN Drawing · 13 Dec 2024
  • PROPOSED FIFTH FLOOR PLAN Drawing · 13 Dec 2024
  • DEMOLITION FIFTH FLOOR PLAN Drawing · 13 Dec 2024
  • EXISTING ROOF PLAN Drawing · 13 Dec 2024
  • PROPOSED ROOF PLAN Drawing · 13 Dec 2024
  • DEMOLITION ROOF PLAN Drawing · 13 Dec 2024
  • EXISTING SITE PLAN Site Plan · 13 Dec 2024
  • EXISTING SECTION BB Drawing · 13 Dec 2024
  • EXISTING SECTION CC Drawing · 13 Dec 2024
  • EXISTING SECTION DD Drawing · 13 Dec 2024
  • EXISTING SECTION EE Drawing · 13 Dec 2024
  • EXISTING SECTION FF Drawing · 13 Dec 2024
  • EXISTING NORTH ELEVATION Drawing · 13 Dec 2024
  • EXISTING WEST ELEVATION Drawing · 13 Dec 2024
  • EXISTING EAST ELEVATION Drawing · 13 Dec 2024
  • PROPOSED SITE PLAN Site Plan · 13 Dec 2024
  • PROPOSED SECTION AA Drawing · 13 Dec 2024
  • PROPOSED SECTION DD Drawing · 13 Dec 2024
  • PROPOSED SECTION EE Drawing · 13 Dec 2024
  • PROPOSED SECTION FF Drawing · 13 Dec 2024
  • PROPOSED SECTION GG Drawing · 13 Dec 2024
  • PROPOSED NORTH ELEVATION Drawing · 13 Dec 2024
  • PROPOSED EAST ELEVATION Drawing · 13 Dec 2024
  • DEMOLITION NORTH ELEVATION Drawing · 13 Dec 2024
  • DEMOLITION WEST ELEVATION Drawing · 13 Dec 2024
  • EXISTING GROUND FLOOR PLAN Drawing · 13 Dec 2024
  • EXISTING SECOND FLOOR PLAN Drawing · 13 Dec 2024
  • DESIGN AND ACCESS STATEMENT PART 2 OF 7 Report - Design & Access Statement/Report · 13 Dec 2024
  • TRANSPORT STATEMENT Report - Transport Statement/Report · 13 Dec 2024
  • CONSTRUCTION PHASE WASTE INFORMATION Accompanying report · 13 Dec 2024
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT Accompanying report · 13 Dec 2024
  • WHOLE LIFE CARBON AND CIRCULAR ECONOMY REPORT Accompanying report · 13 Dec 2024
  • ST ANDREWS HILL - MARSHALL FIRE PLANNING FIRE STATEMENT REV01 5TH DECEMBER 2024 Accompanying report · 13 Dec 2024
  • 241210 - 1-2 ST ANDREWS HILL TOWN PLANNING STATEMENT Report - Planning Statement/Report · 13 Dec 2024
  • DAYLIGHT AND SUNLIGHT IMPACT ON NEIGHBOURING PROPERTIES REPORT: APPENDICES Report - Daylight/Sunlight Report · 13 Dec 2024
  • CONTOURS Other · 13 Dec 2024
  • APPENDICES)_PART3 Other · 13 Dec 2024
  • DAYLIGHT AND SUNLIGHT IMPACT ON NEIGHBOURING PROPERTIES REPORT Report - Daylight/Sunlight Report · 13 Dec 2024
  • PROPOSED WEST ELEVATION Drawing · 13 Dec 2024
  • DEMOLITION EAST ELEVATION Drawing · 13 Dec 2024
  • DRAWING LIST Drawings Schedule · 13 Dec 2024
  • PROPOSED GROUND FLOOR PLAN Drawing · 13 Dec 2024
  • DEMOLITION GROUND FLOOR PLAN Drawing · 13 Dec 2024
  • EXISTING FIRST FLOOR PLAN Drawing · 13 Dec 2024
  • DEMOLITION FIRST FLOOR PLAN Drawing · 13 Dec 2024
  • PROPOSED SECOND FLOOR PLAN Drawing · 13 Dec 2024
  • 024829_A-R01-C PLANNING NOISE REPORT Report - Acoustic/Noise Report · 13 Dec 2024
  • DESIGN AND ACCESS STATEMENT PART 3 OF 7 Report - Design & Access Statement/Report · 13 Dec 2024
  • DESIGN AND ACCESS STATEMENT PART 4 OF 7 Report - Design & Access Statement/Report · 13 Dec 2024
  • DESIGN AND ACCESS STATEMENT PART 5 OF 7 Report - Design & Access Statement/Report · 13 Dec 2024
  • DESIGN AND ACCESS STATEMENT PART 6 OF 7 Report - Design & Access Statement/Report · 13 Dec 2024
  • DESIGN AND ACCESS STATEMENT PART 7 OF 7 Report - Design & Access Statement/Report · 13 Dec 2024
  • DESIGN AND ACCESS STATEMENT PART 1 OF 7 Report - Design & Access Statement/Report · 13 Dec 2024
  • AIR QUALITY ASSESSMENT Accompanying report · 13 Dec 2024
  • ST ANDREWS HILL_REV01_CEMP Other · 13 Dec 2024
  • HERITAGE IMPACT ASSESSMENT Accompanying report · 13 Dec 2024
  • SAH1 1-2 ST ANDREWS HILL_PART2 Accompanying report · 13 Dec 2024
  • 21085103-WAT-XX-XX-RP-N-700003-P03_PART2 Accompanying report · 13 Dec 2024
  • 21085103-WAT-XX-XX-RP-N-700003-P03_PART6 Accompanying report · 13 Dec 2024
  • PRELIMINARY RISK ASSESSMENT Accompanying report · 13 Dec 2024
  • CARBON OPTIONS TOOL Other · 13 Dec 2024
  • EXISTING B1 PLAN Drawing · 13 Dec 2024
  • PROPOSED B1 PLAN Drawing · 13 Dec 2024
  • PROPOSED SECTION BB Drawing · 13 Dec 2024
  • PROPOSED SECTION CC Drawing · 13 Dec 2024
  • 15375-WAT-XX-XX-LG-V-59003 C01 Other · 13 Dec 2024
  • DAYLIGHT AND SUNLIGHT REPORT Report - Daylight/Sunlight Report · 13 Dec 2024
  • ST ANDREWS HILL SCI FINAL Other · 13 Dec 2024
  • DEMOLITION B1 PLAN Drawing · 13 Dec 2024
  • EXISTING LOCATION PLAN Site Plan · 13 Dec 2024
  • EXISTING SECTION AA Drawing · 13 Dec 2024
  • OPERATIONAL WASTE MANAGEMENT STRATEGY Accompanying report · 13 Dec 2024
  • ENERGY STATEMENT & SUSTAINABILITY REPORT STAGE 2 Accompanying report · 13 Dec 2024
  • 21085103-WAT-XX-XX-RP-N-700003-P03_PART3 Accompanying report · 13 Dec 2024
  • 21085103-WAT-XX-XX-RP-N-700003-P03_PART4 Accompanying report · 13 Dec 2024
  • 21085103-WAT-XX-XX-RP-N-700003-P03_PART5 Accompanying report · 13 Dec 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 59A Carter Lane London EC4V 5DY

    24/00523/FULL Submitted 21 May 2024 50 yards away

    Change of use from Class E to Drinking Establishment (Sui Generis). (retrospective application)

    Withdrawn Full applications 9 docs
  • 2 Burgon Street London EC4V 5DR

    25/01222/FULL Submitted 4 Sep 2025 50 yards away

    Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 11 (approved plans) of planning permission 21/00768/FULL, dated 6th of October 2022 for the following design changes: (i) Retention of first floor office floorspace (Class E), subsequent reduction in number of residential units (C3) from four to three; (ii) Alterations to the proposed fourth floor flat to replace the balcony with a dormer window.

    Granted Full applications Loft or dormer Windows or glazing 13 docs
  • 2 Burgon Street London EC4V 5DR

    25/00924/MDC Submitted 15 Jul 2025 50 yards away

    Submission of acoustic report in support of Condition 3, and details of external materials in support of Condition 5 of planning permission 21/00768/FULL (as amended by 25/01222/FULL) dated 06.10.2022.

    Granted Conditions 5 docs
  • 2 Burgon Street London EC4V 5DR

    25/00919/NMA Submitted 15 Jul 2025 50 yards away

    Application for Non-Material Amendment under Section 96a of the Town and Country Planning Act 1990 (as amended) to Planning Permission 21/00768/FULL, dated 6 October 2022, to alter the description of development to read: (i) Change of use of upper floors from office (Class E) to residential (Class C3) to create up to four residential units; (ii) Remodelling of third floor and erection of an additional storey to roof; (iii) Replacement of existing entrance to provide separate entrances.

    Granted Amendments 4 docs
  • 2 Burgon Street London EC4V 5DR

    25/01358/CLEUD Submitted 3 Oct 2025 50 yards away

    Certificate of lawful existing use or development to determine whether the works carried out constitute the lawful implementation of planning permission 21/00768/FULL, dated 6th of October 2022.

    Granted Lawful development 9 docs
  • 59 Carter Lane London EC4V 5AQ

    26/00436/MDC Submitted 26 Mar 2026 50 yards away

    Submission of details of acoustic technical note pursuant to Condition 8 of planning permission 24/01004/FULL dated 18.03.2025.

    Granted Conditions 4 docs

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications