Planning application
Cloisters 3rd Floor North Pump Court Middle Temple London EC4Y 7AB
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of third floor North unit from office floorspace (Use Class E) to residential use (Use Class C3) (96.8sqm).
As published by the council, reference 23/00529/FULL
Application record
- Reference
- 23/00529/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 19 May 2023
- Validated
- 19 May 2023
- Decided
- 4 Jul 2023
- Ward
- Farringdon Without
- Decision by
- Delegated
- Postcode
- EC4Y 7AB
Timeline
Dates from the published record
-
19 May 2023
Received by City of London
-
4 Jul 2023
Decision issued: Approved
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
- PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
- OFFICERS REPORT
- APPLICATION FORM - REDACTED
- DOCUMENT - APPLICATION
- DOCUMENT - SITE LOCATION
- DESIGN & ACCESS STATEMENT
- APPLICATION.XML
- LOCATION PLAN
- SITE PLAN
- EXISTING LAYOUT
- PROPOSED LAYOUT
- CIL FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 4 July 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Inner Temple Hall The Terrace Crown Office Row London EC4Y 7HL
Details of plant noise pursuant to condition 10 of planning permission ref 17/00077/FULMAJ dated 04.07.2017.
Granted Conditions 5 docs -
Inner Temple Treasury The Terrace Crown Office Row London EC4Y 7HL
Removal of 1x Prunus sargentii tree, pruning works to 1x London Plan, 1x Ginkgo biloba and 1x Walnut trees.
Granted Trees 8 docs -
Inner Temple Treasury The Terrace Crown Office Row London EC4Y 7HL
Removal of 1x Prunus sargentii tree, pruning works to 1x London Plan, 1x Ginkgo biloba and 1x Walnut trees.
Granted Trees 7 docs -
Inner Temple Treasury The Terrace Crown Office Row London EC4Y 7HL
Tree Maintenance Works Tree 60 - London plane in main car park. Sensitively reduce longer protruding elements of the outer eastern canopy from adjacent trees, by 2m, maintaining natural flowing lines and shape and form. All cuts to be made back to suitable secondary growth points. Tree 72 - Magnolia spp. in Master's House Garden. Sensitively reduce growth towards building by 1m, maintaining natural flowing lines and shape and form. All cuts to be made back to suitable secondary growth points. Tree group refs 76, 77, 78 and 79 - 4 x Betula utilis 'Jacquemontii' (Himalayan birch) in Hare Court Courtyard. Carry out sensitive and selective branch reduction works by approx. 1.5-2m using 'drop crotch' pruning techniques to alleviate weight loading on heavy end weighted branches. Tree group refs 80, 81 and 82 - 3 x Liquidambar styraciflua (Sweet gum) in car park planted beds. Crown lift to 2.5m to an even level to provide adequate clearance over footpath
Granted Trees 5 docs -
1 Pump Court Middle Temple London EC4Y 7AB
Erection of air conditioner condenser units on roof, and associated acoustic screening.
Granted Full applications 14 docs -
4 Pump Court Middle Temple London EC4Y 7AN
Installation of external handrails to entrance steps and provision of automatic door controls to entrance door.
Granted Full applications 16 docs
Other full applications
In City of London
-
26/01083/FULL Granted
Offices Chapter House St Paul's Churchyard London EC4M 8AD
Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).
-
26/01051/FULL Granted
55 Mark Lane London EC3R 7NE
Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.
-
24/00544/FULL Granted
6 -7 New Street London EC2M 4TP
Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.
-
26/00858/FULL Granted
Condor House 10 St Paul's Churchyard London EC4M 8AL
Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.
-
26/01104/FULL Granted
30 - 34 Moorgate London EC2R 6DA
Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.