Skip to content
PlanIndex Get alerts
Menu

Planning application

22 St Leonard's Bank Edinburgh EH8 9SQ

Awaiting decision City of Edinburgh 26/03462/FUL Planning Permission

Works: Loft or dormer Roofing Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Addition of two roof lights to front pitch of roof, replacement and enlargement of existing cupola, overhaul and insulating of existing flat roof, new window to rear elevation.

As published by the council, reference 26/03462/FUL

Application record

Reference
26/03462/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
26 Aug 2026
Validated
26 Aug 2026
Ward
Southside/Newington
Parish
Southside
Decision by
Delegated Decision
Postcode
EH8 9SQ

Comment by 25 September 2026

The council is taking comments on this application until then. Have your say on City of Edinburgh's portal.

Timeline

Dates from the published record

  1. 26 Aug 2026

    Received by City of Edinburgh

  2. 4 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3F1 11 Parkside Street Edinburgh EH8 9RJ

    25/05829/TCO Submitted 5 Nov 2025 159m away

    94% historically approved · decision due ~31 Dec

    Large Ash tree, full removal of tree.

    Awaiting decision Trees 3 docs
  • Flat 2 2 Parkside Street St Leonards Edinburgh EH8 9RL

    26/00032/LBC Submitted 6 Jan 2026 193m away

    89% historically approved · decision due ~3 Mar

    Installation of secondary glazing, external extract vents, internal wall insulation and replacement flat entrance door.

    Awaiting decision Heritage and listed buildings Windows or glazing 4 docs
  • Flat 2 2 East Parkside St Leonards Edinburgh EH16 5XJ

    25/04786/CLESTL Submitted 11 Sep 2025 200m away

    77% historically approved · decision due ~6 Nov

    Short term let.

    Awaiting decision Lawful development 3 docs
  • 5 Spittalfield Crescent (Nelson Hall) Edinburgh EH8 9QZ

    04/02476/CEC Submitted 30 Jun 2004 226m away

    Refurbishment and conversion to provide community facilities

    Granted 16 docs
  • 3F3 105 St Leonard's Street St Leonards Edinburgh EH8 9QY

    25/04389/TCO Submitted 25 Aug 2025 228m away

    94% historically approved · decision due ~21 Oct

    Dead Elm tree in the communal garden, marked by the council with an orange cross and the number one. - Removal of the tree to stop spread the disease to other trees, as advised by the Forestry Service.

    Awaiting decision Trees 5 docs
  • 15 Dalkeith Road Edinburgh EH16 5BH

    22/04766/VARY Submitted 23 Jun 2026 240m away

    86% historically approved · decision due ~8 Sep

    Non-material variation to planning permission 22/04766/FUL - reduction in parking provision through the removal of a basement, improvements to internal vehicle circulation, and reduction in the extent of retaining walls across the site.

    Awaiting decision Conditions 74 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications