Planning application
Marriott Hotel 111 Glasgow Road Gogar Edinburgh EH12 8NF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
The removal and replacement of 6 No. antennas and associated ancillary works thereto.
As published by the council, reference 26/03149/PNTEL
Application record
- Reference
- 26/03149/PNTEL
- Type
- Prior Notification
- Status
- Awaiting Assessment
- Received
- 17 Jul 2026
- Validated
- 17 Jul 2026
- Ward
- No Ward Number
- Parish
- Corstorphine + Gyle
- Decision by
- Delegated Decision
- Postcode
- EH12 8NF
Timeline
Dates from the published record
-
17 Jul 2026
Received by City of Edinburgh
-
6 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of Edinburgh took a median of 38 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
160 Glasgow Road Edinburgh EH12 8LS
Elevational changes to residential and office development comprising 34 residential units and separate office space with associated landscaping, car parking and infrastructure
Decided Conditions 11 docs -
92 Gyle Park Gardens Edinburgh EH12 8NQ
Extension to house.
Granted Full applications Extension 8 docs -
2B Cargil Terrace Edinburgh EH5 3NB
Proposed attic conversion to include the installation of rooflight's and lantern-style rooflight all to existing roof.
Granted Full applications Loft or dormer 13 docs -
Flat 5 11 South Maybury Cammo Edinburgh EH12 8NX
77% historically approved · decision due ~2 Jun
Use of entire flatted dwelling as short stay residential accommodation, by single persons, or up to 4 persons together.
Awaiting decision Lawful development 7 docsDomestic -
Unit 42 Gyle Centre Gyle Avenue Edinburgh EH12 9JT
Fascia & projecting sign.
Granted Advertising 8 docs -
Unit 25 - 30 Gyle Centre Gyle Avenue South Gyle Edinburgh EH12 9JT
Form new shopfront and widen an existing door opening.
Granted Full applications Windows or glazing 7 docs
Other prior approval applications
In City of Edinburgh
-
26/03429/WINPA Granted
28 Mayfield Gardens Edinburgh EH9 2BZ
Replacement of timber sash and case style window for new PVCu double glazed sliding sash window.
-
26/03468/WINPA Awaiting decision
2F1 59 Morningside Road Edinburgh EH10 4AZ
The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.
-
26/03426/WINPA Granted
1F2 110 Comiston Road Edinburgh EH10 5QL
I bought Flat 4 110 Comiston Road on 10th July 2026 and I am notifying you and ask for prior approval that I will reinstate the original wooden sash window design throughout the property and replace the current UPVC windows at the property. The current windows open fully (swing) and are not the original opening method as should be in sash windows. I have a quote from "Edinburgh Sash and Case Company", and have already paid for the initial work of making the windows from scratch. The windows are due to be installed with great care and attention to detail in the middle of September 2026.
-
26/03427/WINPA Awaiting decision
24 Blackford Avenue Edinburgh EH9 2PH
Replacement of aluminium sliding sash and case style windows for new pVCU double glazed sliding sash windows.
-
26/03380/PNTEL Awaiting decision
Leith St Andrews Hall 410 Easter Road Edinburgh EH6 8HT
Proposed shared telecommunications base station comprising the installation of 8no. antennas within bell tower on support poles mounted to new grillage flooring over existing steel beams; installation of 12no. ERS mounted internally to bell tower wall and 24no. ERS on antenna support poles; replacement of existing louvres with Glass Reinforced Plastic Louvres; replacement of timber staircase on third floor of bell tower with access ladder; removal of church bells and timber frame; Installation of 2no. equipment cabinets and 1no. meter cabinet at ground level; and associated landscaping and ancillary development.