Skip to content
PlanIndex Get alerts
Menu

Planning application

2F2 41 Colinton Road Edinburgh EH10 5EN

Awaiting decision City of Edinburgh 26/02662/WINPA Prior Approval Windows

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of uPvC double glazed sash windows.

As published by the council, reference 26/02662/WINPA

Application record

Reference
26/02662/WINPA
Type
Prior Approval Windows
Status
Awaiting Assessment
Received
23 Jun 2026
Validated
25 Jun 2026
Ward
Morningside
Parish
Merchiston
Decision by
Delegated Decision
Postcode
EH10 5EN

Timeline

Dates from the published record

  1. 23 Jun 2026

    Received by City of Edinburgh

  2. 25 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • Flat 1 1 Napier Road Edinburgh EH10 5BE

    25/05857/TCO Submitted 6 Nov 2025 76m away

    Lime tree crown reduction. Current height 16m, proposed 15m. Current width 9m proposed 8m. Deadwooding.

    Decided Trees 7 docs
  • 4 Napier Road Edinburgh EH10 5BD

    19/04224/TCO Submitted 5 Sep 2019 87m away

    Sycamore x3 - Thin and lift over roadside 20%, Yew - reduce girth as getting "leggy", small cypress at door - Dismantle.

    Decided Trees 1 doc
  • 1 Napier Road EH10 5BE

    04/00060/FUL Submitted 12 Jan 2004 98m away

    New velux windows to roof

    Granted Full applications Loft or dormer Windows or glazing 3 docs
  • 6 Abbotsford Crescent Edinburgh EH10 5DY

    19/05284/TCO Submitted 5 Nov 2019 104m away

    Alder tree in front garden against wall at right hand side of garden - Section fell and remove due to roots and stem pushing on wall and causing damage., Horse chestnut in rear garden - .Left hand side when entering rear garden. - crown reduce away from building by 2m ,crown lift to 6m,crown thin by 20% to reduce weight loading.

    Decided Trees 1 doc
  • 9 Abbotsford Crescent Edinburgh EH10 5DY

    19/00318/TCO Submitted 25 Jan 2019 104m away

    See attached work proposal document. - As described in work proposal document.

    Decided Trees 7 docs
  • 10A Abbotsford Crescent Morningside Edinburgh EH10 5DY

    26/0191/TCO Submitted 18 Mar 2026 104m away

    94% historically approved · decision due ~14 May

    Tree 887 horse chestnut - reduction, Tree 890 sycamore - reduce dog leg limb and reshape/balance, Tree 888 Lime - remove epicormic growth and deadwood, Tree 889 elm - Deadwood

    Awaiting decision Trees 3 docs

In City of Edinburgh

  • 26/03429/WINPA Granted

    28 Mayfield Gardens Edinburgh EH9 2BZ

    Replacement of timber sash and case style window for new PVCu double glazed sliding sash window.

    21 Aug 2026 Prior approval
  • 26/03468/WINPA Awaiting decision

    2F1 59 Morningside Road Edinburgh EH10 4AZ

    The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.

    26 Aug 2026 Prior approval
  • 26/03426/WINPA Granted

    1F2 110 Comiston Road Edinburgh EH10 5QL

    I bought Flat 4 110 Comiston Road on 10th July 2026 and I am notifying you and ask for prior approval that I will reinstate the original wooden sash window design throughout the property and replace the current UPVC windows at the property. The current windows open fully (swing) and are not the original opening method as should be in sash windows. I have a quote from "Edinburgh Sash and Case Company", and have already paid for the initial work of making the windows from scratch. The windows are due to be installed with great care and attention to detail in the middle of September 2026.

    21 Aug 2026 Prior approval
  • 26/03427/WINPA Awaiting decision

    24 Blackford Avenue Edinburgh EH9 2PH

    Replacement of aluminium sliding sash and case style windows for new pVCU double glazed sliding sash windows.

    21 Aug 2026 Prior approval
  • 26/03380/PNTEL Awaiting decision

    Leith St Andrews Hall 410 Easter Road Edinburgh EH6 8HT

    Proposed shared telecommunications base station comprising the installation of 8no. antennas within bell tower on support poles mounted to new grillage flooring over existing steel beams; installation of 12no. ERS mounted internally to bell tower wall and 24no. ERS on antenna support poles; replacement of existing louvres with Glass Reinforced Plastic Louvres; replacement of timber staircase on third floor of bell tower with access ladder; removal of church bells and timber frame; Installation of 2no. equipment cabinets and 1no. meter cabinet at ground level; and associated landscaping and ancillary development.

    19 Aug 2026 Prior approval