Skip to content
PlanIndex Get alerts
Menu

Planning application

3F 5 Moray Place Edinburgh EH3 6DS

Awaiting decision City of Edinburgh 26/01661/LBC Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Non-original partitions removed and new bedrooms /bathroom & en-suite. Enlargement of hallway layout. Installation of replacement timber frame windows to front /rear elevations & installation of air source heat pump on roof.

As published by the council, reference 26/01661/LBC

Application record

Reference
26/01661/LBC
Type
Listed Building Consent
Status
Awaiting Assessment
Received
20 Apr 2026
Validated
20 Apr 2026
Ward
City Centre
Parish
New Town + Broughton
Decision by
Delegated Decision
Postcode
EH3 6DS

Timeline

Dates from the published record

  1. 20 Apr 2026

    Received by City of Edinburgh

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 3F 5 Moray Place Edinburgh EH3 6DS

    26/01657/FUL Submitted 20 Apr 2026 1m away

    83% historically approved · decision due ~15 Jun

    Alterations and refurbishment of existing third floor flat. Installation of replacement windows to front and rear elevations and installation of air source heat pump on roof.

    Awaiting decision Full applications Windows or glazing 10 docs
  • 6B Moray Place New Town Edinburgh EH3 6DS

    26/00059/FUL Submitted 8 Jan 2026 18m away

    Alterations and rear extension to sub basement floor flat.

    Granted Full applications Extension 23 docs
  • 6B Moray Place New Town Edinburgh EH3 6DS

    26/00060/LBC Submitted 8 Jan 2026 18m away

    89% historically approved · decision due ~5 Mar

    Alterations and rear extension to sub-basement floor flat.

    Awaiting decision Heritage and listed buildings Extension 9 docs
  • 2F8 Moray Place Edinburgh EH3 6DS

    23/02461/LBC Submitted 7 Jun 2023 31m away

    Window alterations.

    Granted Heritage and listed buildings Windows or glazing 5 docs
  • 5A Gloucester Lane Edinburgh EH3 6ED

    23/02612/FULSTL Submitted 15 Jun 2023 36m away

    Change of use from residential mews flat to short term let accommodation, (in retrospect).

    Refused Full applications 8 docs
  • BF, GF, 1F, 2F, 3F 9 Moray Place Edinburgh EH3 6DS

    26/02770/LBC Submitted 1 Jul 2026 40m away

    SPEN mains upgrade is required to modernise the electrical supplies into all the flats in the building. Metal trunking to be installed to the communal area of the stairs, with cables passing through the landings to the flats. A new distribution board will be installed at the point of supply, feeding an individual cable for each flat with a new fuse installed in each property connected to the existing meter. There may be a requirement for a white PVC trunking to contain the cable.

    Decided Heritage and listed buildings New dwelling 15 docs

In City of Edinburgh

  • 26/03530/LBC Awaiting decision

    3F 87 Constitution Street Edinburgh EH6 7AE

    Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Careful attention will be given when manufacturing new like for like sashes. All window moulds, dimensions and features of the original sashes will be retained and replicated on the new sashes.

    1 Sep 2026 Heritage and listed buildings
  • 26/03514/LBC Awaiting decision

    8A Warrender Park Crescent Edinburgh EH9 1DX

    Formation of one new window opening in the rear elevation of the kitchen, comprising a white-painted double-glazed timber sash-and-case window with natural sandstone lintel, rybats and cill to match the existing stonework.

    31 Aug 2026 Heritage and listed buildings
  • 26/03529/LBC Awaiting decision

    1 Eyre Crescent Edinburgh EH3 5ET

    Existing timber sash and case windows to be removed and replaced with new timber double glazed sash and case windows, all proportions to remain the same to match the existing.

    31 Aug 2026 Heritage and listed buildings
  • 26/03508/LBC Awaiting decision

    2F 45 Bread Street Edinburgh EH3 9AH

    Strip wallpaper; replaster and repaint internal walls and ceilings; repaint/replace internal doors and door handles; replace carpet with new carpet/laminate; install ceiling rose in living room; replace flat front door lock; replace wall sockets, light switches, and light fixtures; strip and repaint the existing internal window shutters.

    31 Aug 2026 Heritage and listed buildings
  • 26/03500/LBC Awaiting decision

    6 St Margaret's Road Edinburgh EH9 1AZ

    Formation of en-suite shower room and fitted wardrobe within bedroom of ground floor flat. En-suite and wardrobe taken part height only, allowing cornice to remain unaltered. Fit black cast iron extract termination grille at low level on external wall.

    28 Aug 2026 Heritage and listed buildings