Skip to content
PlanIndex Get alerts
Menu

Planning application

38 Rodney Street Edinburgh EH7 4DX

Awaiting decision City of Edinburgh 25/05083/FUL Planning Permission

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from Class 1A to Class 3 with restrictions and alter rear window to form new door.

As published by the council, reference 25/05083/FUL

Application record

Reference
25/05083/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
24 Sep 2025
Validated
30 Sep 2025
Ward
Leith Walk
Parish
New Town + Broughton
Decision by
Delegated Decision
Postcode
EH7 4DX

Timeline

Dates from the published record

  1. 24 Sep 2025

    Received by City of Edinburgh

  2. 30 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 25 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25 Rodney Street Edinburgh EH7 4EL

    18/10369/CLP Submitted 14 Dec 2018 39m away

    Offices: First floor used as offices for period to 2003 when temporary use as yoga studio was granted by council for 3 years. Used as yoga studio until mid 2018 but now to be used as offices.

    Withdrawn Lawful development 7 docs
  • Flat 4 9 Heriothill Terrace Broughton Edinburgh EH7 4DZ

    25/05197/FULSTL Submitted 30 Sep 2025 73m away

    83% historically approved · decision due ~25 Nov

    Retrospective Change of use from residential Flat (Sui Generis) to Short term let holiday accommodation (Sui Generis).

    Awaiting decision Full applications 6 docs
  • 11A Bellevue Terrace Edinburgh EH7 4DT

    25/04490/CLESTL Submitted 1 Sep 2025 96m away

    77% historically approved · decision due ~30 Oct

    Use of the property as a short-term let.

    Awaiting decision Lawful development 4 docs
  • 32 - 34 Heriothill Terrace Broughton Edinburgh EH7 4DY

    26/01422/FUL Submitted 2 Apr 2026 109m away

    83% historically approved · decision due ~8 Jun

    Demolition of the existing building and the erection of 10 No. residential dwellings (Class 9), together with associated landscaping and external works.

    Awaiting decision Full applications Demolition 39 docs
  • 2F2 27 Bellevue Crescent Edinburgh EH3 6NF

    26/03179/LBC Submitted 3 Aug 2026 121m away

    89% historically approved · decision due ~29 Sep

    To replace the existing single glazing with slimline double glazing within the existing sash and case timber window frames.

    Awaiting decision Heritage and listed buildings Windows or glazing 6 docs
  • 2F2 27 Bellevue Crescent Broughton Edinburgh EH3 6NF

    25/05232/LBC Submitted 2 Oct 2025 121m away

    To remove non original stud partitions in kitchen and bedroom, and reconfigure kitchen and bathroom.

    Decided Heritage and listed buildings 7 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications