Skip to content
PlanIndex Get alerts
Menu

Planning application

72 Leamington Terrace Viewforth Edinburgh EH10 4JU

Awaiting decision City of Edinburgh 25/04733/WINPA Prior Approval Windows

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Existing tmber framed windows to be replaced with white upvc double glazed windows.

As published by the council, reference 25/04733/WINPA

Application record

Reference
25/04733/WINPA
Type
Prior Approval Windows
Status
Awaiting Assessment
Received
9 Sep 2025
Validated
18 Sep 2025
Ward
Morningside
Parish
Merchiston
Decision by
Delegated Decision
Postcode
EH10 4JU

Timeline

Dates from the published record

  1. 9 Sep 2025

    Received by City of Edinburgh

  2. 18 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • Bruntsfield Evangelical Church 68 Leamington Terrace Viewforth Edinburgh EH10 4JU

    25/05372/LBC Submitted 9 Oct 2025 23m away

    89% historically approved · decision due ~4 Dec

    Removal of 3 No. antennas; 2 No. cabinets; and, all ancillary development (inc. sets of timber louvres).Installation of 14 No. antennas (12 No. located internally behind sets of GRP louvres; 2 No. antennas face-mounted externally on southeast facade at 28.1m, painted to match stonework); 5 No. equipment cabinets / racks; and, all ancillary development (inc. sets of GRP louvres; 2 No. GPS modules located externally on southeast facade at 17.7m, painted to match stonework.

    Awaiting decision Heritage and listed buildings 21 docs
  • Bruntsfield Evangelical Church 68 Leamington Terrace Viewforth Edinburgh EH10 4JU

    25/05373/FUL Submitted 9 Oct 2025 23m away

    83% historically approved · decision due ~4 Dec

    Removal of 3 No. antennas, 2 No. cabinets and, all ancillary development (inc. sets of timber louvres). Installation of 14 No. antennas (12 No. located internally behind sets of GRP louvres; 2 No. antennas face-mounted externally on southeast facade at 28.1m, painted to match stonework); 5 No. equipment cabinets/racks and all ancillary development (inc. sets of GRP louvres, 2 No. GPS modules located externally on southeast facade at 17.7m, painted to match stonework). (Resubmission).

    Awaiting decision Full applications 23 docs
  • Flat 4 75 Leamington Terrace Edinburgh EH10 4JT

    25/04800/CLESTL Submitted 11 Sep 2025 32m away

    77% historically approved · decision due ~6 Nov

    Short term let.

    Awaiting decision Lawful development 3 docs
  • 69B Leamington Terrace Edinburgh EH10 4JT

    26/02012/FUL Submitted 11 May 2026 43m away

    83% historically approved · decision due ~6 Jul

    Proposed extension.

    Awaiting decision Full applications Extension 11 docs
  • 69B Leamington Terrace Viewforth Edinburgh EH10 4JT

    26/02806/FUL Submitted 3 Jul 2026 47m away

    83% historically approved · decision due ~31 Aug

    Erection of a single storey detached timber garden building in the rear curtilage of the property. 3.5m wide x 2.5m deep x 2.48m in height. Timber construction with insulated walls, floor and roof and double glazed windows. Plastic grid foundation system with pea gravel. No plumbing or drainage.

    Awaiting decision Full applications Windows or glazing 8 docs
    Small domestic
  • 2F1 87 Bruntsfield Place Edinburgh EH10 4HG

    26/01959/CLESTL Submitted 6 May 2026 54m away

    77% historically approved · decision due ~1 Jul

    Application for the issue of a Certificate of Lawfulness confirming its existing use as short term let accommodation is lawful.

    Awaiting decision Lawful development 8 docs

In City of Edinburgh

  • 26/03429/WINPA Granted

    28 Mayfield Gardens Edinburgh EH9 2BZ

    Replacement of timber sash and case style window for new PVCu double glazed sliding sash window.

    21 Aug 2026 Prior approval
  • 26/03468/WINPA Awaiting decision

    2F1 59 Morningside Road Edinburgh EH10 4AZ

    The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.

    26 Aug 2026 Prior approval
  • 26/03426/WINPA Granted

    1F2 110 Comiston Road Edinburgh EH10 5QL

    I bought Flat 4 110 Comiston Road on 10th July 2026 and I am notifying you and ask for prior approval that I will reinstate the original wooden sash window design throughout the property and replace the current UPVC windows at the property. The current windows open fully (swing) and are not the original opening method as should be in sash windows. I have a quote from "Edinburgh Sash and Case Company", and have already paid for the initial work of making the windows from scratch. The windows are due to be installed with great care and attention to detail in the middle of September 2026.

    21 Aug 2026 Prior approval
  • 26/03427/WINPA Awaiting decision

    24 Blackford Avenue Edinburgh EH9 2PH

    Replacement of aluminium sliding sash and case style windows for new pVCU double glazed sliding sash windows.

    21 Aug 2026 Prior approval
  • 26/03380/PNTEL Awaiting decision

    Leith St Andrews Hall 410 Easter Road Edinburgh EH6 8HT

    Proposed shared telecommunications base station comprising the installation of 8no. antennas within bell tower on support poles mounted to new grillage flooring over existing steel beams; installation of 12no. ERS mounted internally to bell tower wall and 24no. ERS on antenna support poles; replacement of existing louvres with Glass Reinforced Plastic Louvres; replacement of timber staircase on third floor of bell tower with access ladder; removal of church bells and timber frame; Installation of 2no. equipment cabinets and 1no. meter cabinet at ground level; and associated landscaping and ancillary development.

    19 Aug 2026 Prior approval