Planning application
Land South West Of Old Liston Road Edinburgh
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-material variation to planning permission 23/01421/FUL - Minor internal and external changes to facilitate the fit-out.
As published by the council, reference 23/01421/VAR4
Application record
- Reference
- 23/01421/VAR4
- Type
- Fourth Variation
- Status
- Awaiting Assessment
- Received
- 31 Jul 2026
- Validated
- 31 Jul 2026
- Ward
- No Ward Number
- Parish
- Ratho + District
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
31 Jul 2026
Received by City of Edinburgh
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of Edinburgh took a median of 38 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
935 applications on PlanIndex · across 112 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file, registered in Aberdeen
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Land South West Of Old Liston Road Newbridge
86% historically approved · decision due ~27 Aug
Non-material variation application to 23/01421/FUL to Plot 1 including: service yard area to the side and rear; changes to fencing; amended area to the front to facilitate changes to the access, car parking and EV / supercharger spaces; and minor internal and external changes to facilitate fit-out.
Awaiting decision Conditions 12 docs -
Land South West Of Old Liston Road Newbridge
83% historically approved · decision due ~6 Jul
Section 42 application to vary condition 2 of planning permission in principle (23/01423/PPP) to extend the time period within which applications for the approval of matters specified in conditions can be made.
Awaiting decision Full applications 6 docs -
65 Riverside Newbridge EH28 8SU
Single storey rear extension and re-location of existing conservatory.
Granted Full applications Extension 7 docsSmall domestic -
61 Riverside Newbridge EH28 8SU
83% historically approved · decision due ~19 May
Proposed rear extension, front porch and internal alterations.
Awaiting decision Full applications Extension 6 docsSmall domestic -
Land South West Of Old Liston Road Newbridge Edinburgh
83% historically approved · decision due ~30 Sep
Additional service yard space at Plot 1.
Awaiting decision Full applications 6 docs -
30 Old Liston Road Newbridge Edinburgh EH28 8SS
Request for a Planning Section 50 Certificate (Licensing (Scotland) Act 2005)
Decided 2 docs
Other conditions applications
In City of Edinburgh
-
24/00942/VARY Awaiting decision
27 Lawrie Reilly Place Edinburgh EH7 5EU
Non Material Variation - Ground floor rear extension to terraced house.
-
22/04689/VAR3 Awaiting decision
Land 288 Metres Southwest Of 10 Builyeon Road South Queensferry
Non material Variation to planning permission 22.04689/AMC - 1. Flatted blocks 13 and 14 removed, reduction of 42 apartments. 2. Flatted blocks to be replaced with 23 townhouses (types 8 and 9). 3. Mix of detached houses amended. 4. House type 7 removed. 5. House types introduced / amended; types 10, 11, 12, and types 1, 2, 3, 10, 11 (model F). 6. Overall numbers reduced to 316. 82 affordable homes provided.
-
26/00767/VARY Awaiting decision
42 Peffermill Road Edinburgh EH16 5LL
Non-material variation application to 26/00767/FUL. Increase the width of the proposed switch room from 4000mm to 4200mm.
-
25/02427/VAR2 Awaiting decision
Liberton Fire Station 19 Kirk Brae Edinburgh EH16 6HH
Non-material variation application to 25/02427/FUL. Remove existing masonry wall down to the higher ground level and add a new concrete coping to the remaining wall; Install metal posts and security fence panels to the areas NOT adjacent to the existing properties; Masonry directly adjacent to the existing properties is to be made good. Note this may prove impossible and in which case approval from the property owners will be sought to replace those sections with security fencing also; Replace all existing and proposed palisade fencing to the west and north sides with security mesh fencing for consistency.
-
23/06508/VARY Awaiting decision
10 Blackford Road Edinburgh EH9 2DS
Non-material variation application to 23/06508/FUL. Addition of pizza oven, to be constructed in stone to match existing boundary wall and finish below height of boundary wall. Change of material to plinth of glasshouse. Addition of small exterior kitchen island. Addition of demountable poles to support demountable awning. Additional detail on boundary wall lighting.