Planning application
New Park Centre New Park Road Chichester West Sussex PO19 7XY
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of 104 solar panels to existing flat roof to New Park Centre.
As published by the council, reference 26/00895/FUL
Application record
- Reference
- 26/00895/FUL
- Type
- Full Application
- Status
- Pending Decision
- Received
- 17 Apr 2026
- Validated
- 8 May 2026
- Ward
- Chichester Central
- Parish
- Chichester
- Decision by
- Delegated
- Postcode
- PO19 7XY
Timeline
Dates from the published record
-
17 Apr 2026
Received by Chichester
-
8 May 2026
Validated
Checked as complete and ready for consideration.
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Chichester took a median of 58 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
AMdesign Architects Agent, an architecture practice
16 applications on PlanIndex · across 5 councils · 73% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
- PROPOSED WEST ELEVATION AND SECTION
- CCAAC
- CORRESPONDENCE FROM AGENT 29.05.26
- CHICHESTER CITY COUNCIL 26.05.2026
- PUBLIC COMMENT
- EXISTING AND PROPOSED ROOF PLAN
- HERITAGE STATEMENT
- 2025 BAT SURVEY REPORT (CHICHESTER CINEMA)
- 2024 BAT SURVEYS REPORT (CHICHESTER CINEMA)
- LOCATION AND BLOCK PLAN
- DESIGN AND ACCESS STATEMENT
- APPLICATION FORM
- SOLAR PANEL INFORMATION
- SOLAR PANEL LAYOUT GRAPHIC
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Chichester for determination, against a statutory target of eight weeks. Over the last year Chichester decided full applications in a median of 75 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
New Park Centre New Park Road Chichester West Sussex PO19 7XY
Installation of 104 solar panels to existing flat roof to New Park Centre.
Granted Full applications 14 docs -
Drill Hall East Row Chichester West Sussex PO19 1PE
Discharge of Conditions 3 (Internal and External Alterations), 4 (Door, Window and Rooflight Details) and 5 (Materials) of Planning Consent CC/25/01089/LBC.
Split decision Conditions Loft or dormer Windows or glazing 55 docs -
Drill Hall East Row Chichester West Sussex PO19 1PE
Discharge of Conditions 3 (Internal and External Alterations), 4 (Door, Window and Rooflight Details) and 5 (Materials) of Planning Consent CC/25/01089/LBC.
Split decision Conditions Loft or dormer Windows or glazing 55 docs -
Drill Hall East Row Chichester West Sussex PO19 1PE
Discharge of Conditions 4 (Contaminated Land Phase 1 Report), 5 (Contaminated Land Phase 1 Report), 6 (Contaminated Land Remediation), 7 (Internal and External Alterations), 8 (Materials) and 9 (Door, Window and Rooflight Details) of Planning Permission CC/25/01088/FUL.
Split decision Conditions Loft or dormer Windows or glazing 67 docs -
Drill Hall East Row Chichester West Sussex PO19 1PE
Discharge of Conditions 4 (Contaminated Land Phase 1 Report), 5 (Contaminated Land Phase 1 Report), 6 (Contaminated Land Remediation), 7 (Internal and External Alterations), 8 (Materials) and 9 (Door, Window and Rooflight Details) of Planning Permission CC/25/01088/FUL.
Split decision Conditions Loft or dormer Windows or glazing 67 docs -
Recreation Ground New Park Road Chichester West Sussex
100% historically approved · decision due ~20 Oct
Notification of intention to crown reduce by up to 2.5m (all round) and crown thin by up to 15% on 1 no. Horse Chestnut tree (T704).
Awaiting decision Trees 8 docs
Other full applications
In Chichester
-
24/00439/FUL Refused
70 Cheshire Crescent Tangmere Chichester West Sussex PO20 2HT
Demolition of existing attached garage/utility room and detached garage outbuilding. Erection of single storey rear extension to host dwelling. Erection of 1 no. three bed dwelling.
-
25/02541/FUL Granted
The Steddle Stones Broad Road Hambrook Chidham Chichester West Sussex PO18 8RF
Demolition of existing dwelling, widening of existing access, and erection of 6 no. dwellings.
-
26/01798/FUL Granted
Oakwood Business Park Funtington Road East Ashling West Sussex PO18 9AL
Installation of a new package treatment plant.
-
26/01752/FUL Granted
Kipson Bank Farm Selsey Road Hunston Chichester West Sussex PO20 1AU
Change use of barns to 1 no. dwelling with open garage and workshop, alongside installation of package treatment plant. (Variation of condition 2 of permission 22/02770/FUL - increased quantity of rooflights and windows, inclusion of photovoltaic panels and amended location of some internal partitions and associated additional structural works).
-
26/01427/FUL Granted
N J S Group Quarry Lane Chichester West Sussex PO19 8NY
Demolition of existing structures and redevelopment of 12 no. new commercial units with associated car parking.