Skip to content
PlanIndex Get alerts
Menu

Planning application

CHE/26/00645/EIA

Clean Spark Renewables Holbeck Close Chesterfield Derbyshire S41 7XH

Awaiting decision Chesterfield Environmental Impact Assessment

Proposal

Request for formal screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (As amended) for residential development of approximately 104 dwellings with associated infrastructure

As published by the council, reference CHE/26/00645/EIA

Timeline

Dates from the published record

  1. 29 Jul 2026

    Received by Chesterfield

  2. 31 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Chesterfield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • CHE/26/00645/EIA Awaiting decision

    Clean Spark Renewables Holbeck Close Chesterfield Derbyshire S41 7XH

    Request for formal screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (As amended) for residential development of approximately 104 dwellings with associated infrastructure

    29 Jul 2026 0m away Outline
  • Chesterfield College Infirmary Road Chesterfield Derbyshire S41 7NG

    Discharge of condition 10 (site traffic management) of CHE/23/00455/FUL- Construction of a two storey further education facility, including the demolition of the existing North Block 1 building, new steel fire escape stair to the North Block 4 building and landscaping

    6 Sep 2024 245m away Conditions
  • Chesterfield College Infirmary Road Chesterfield Derbyshire S41 7NG

    Discharge of condition 10 (site traffic management) of CHE/23/00455/FUL- Construction of a two storey further education facility, including the demolition of the existing North Block 1 building, new steel fire escape stair to the North Block 4 building and landscaping

    6 Sep 2024 245m away Conditions
  • CHE/25/00395/LBC Awaiting decision

    Winding Wheel 13 Holywell Street Chesterfield Derbyshire S41 7SA

    Steel gates to theatre entrance doors

    2 Jun 2025 287m away Heritage and listed buildings
  • CHE/25/00395/LBC Awaiting decision

    Winding Wheel 13 Holywell Street Chesterfield Derbyshire S41 7SA

    Steel gates to theatre entrance doors

    2 Jun 2025 287m away Heritage and listed buildings
  • CHE/25/00407/FUL Awaiting decision

    Winding Wheel 13 Holywell Street Chesterfield Derbyshire S41 7SA

    Gates to entrance doors on front elevation of the building

    9 Jun 2025 291m away Full applications

In Chesterfield

  • Church Of The Holy Family 200 Derby Road Chesterfield Derbyshire S40 2EP

    Outline application for the demolition of existing building and re-development for residential use

    26 May 2025 Outline
  • CHE/26/00620/EIA Awaiting decision

    Spingwell Hill To Hawthorn Hill Staveley Chesterfield Derbyshire

    Request for EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for: Installation of an approximately 26.4km underground water pipeline from Hathersage to Renishaw, together with a booster station and a new service reservoir

    22 Jul 2026 Outline
  • CHE/26/00583/CPO Awaiting decision

    Holly House School Church Street North Old Whittington Chesterfield Derbyshire S41 9QR

    DCC consultation: Removal of rooflight, rainwater goods and existing roof covering and replacing with new

    15 Jul 2026 Outline
  • CHE/26/00493/OUT Awaiting decision

    Land To The South Of Bamford Road Inkersall Chesterfield Derbyshire

    Outline planning application for the erection of up to 350 dwellings (including affordable housing) with public open space, landscaping, sustainable drainage system (SuDS) and vehicular access point. All matters reserved except for means of access

    25 Jun 2026 Outline
  • 28 Manor Road Brimington Chesterfield Derbyshire S43 1NG

    Construction of a 2 bedroom bungalow

    10 Apr 2026 Outline